KPI Summary - WK09 - 3-Mar, 2021
KPI Summary - WK09 - 3-Mar, 2021
KPIs Target Meeting > Baseline < Target < Baseline Target Meeting > Baseline < Target < Baseline
WK40 0 5 6 0 7 5
WK41 2 5 4 2 5 5
WK42 1 8 2 3 6 3
WK43 2 9 0 6 3 3
WK44 4 7 0 5 3 4
WK45 8 3 0 7 5 0
WK46 9 2 0 5 7 0
WK47 8 3 0 4 7 1
WK48 9 2 0 6 6 0
WK 49 8 3 0 3 9 0
WK 50 3 8 0 1 8 3
WK 51 1 10 0 2 9 1
WK 52 2 9 0 5 5 2
WK 01 7 4 0 5 6 1
WK 02 4 7 0 6 6 0
WK 03 5 6 0 6 4 2
WK 04 6 5 0 4 7 1
WK 05 5 6 0 5 7 0
WK 06 5 6 0 3 8 1
Target Meeting > Baseline < Target < Baseline Target Meeting > Baseline < Target < Baseline Target Meeting
0 8 3 0 5 6 2
0 7 4 0 4 7 2
0 10 1 0 8 3 1
1 6 4 5 3 3 2
2 5 4 7 2 2 3
2 6 3 3 5 3 3
2 8 1 3 7 1 2
1 6 4 3 5 3 2
1 8 2 3 6 2 3
4 5 2 6 3 2 2
5 4 2 5 4 2 1
6 3 2 4 5 2 1
3 6 2 4 5 2 1
5 3 3 7 2 2 3
3 6 2 5 4 2 4
4 5 2 6 3 2 4
3 6 2 5 7 1 3
3 5 3 5 7 1 3
4 4 3 5 3 5 4
> Baseline < Target < Baseline Target Meeting > Baseline < Target < Baseline
2 3 2 27 23
2 3 6 23 23
6 0 5 38 9
4 1 16 25 11
3 1 21 20 11
3 1 23 22 7
5 0 21 29 2
4 1 18 25 9
3 1 22 25 5
2 1 23 22 5
3 1 15 27 8
3 1 14 30 6
3 1 15 28 7
1 1 27 16 7
0 1 22 23 5
0 1 25 18 7
1 1 21 26 5
2 0 21 27 4
0 1 21 21 10
Total (50)
> Baseline < Target < Baseline
6 19
7 16
8 18
6 19
9 17
7 21
5 21
10 18
10 21
9 19
9 20
10 18
7 25
9 20
9 19
10 20
4 26
4 26
3 28
5 26
7 24
9 22
6 22
3 23
6 20
8 18
6 21
7 17
9 15
7 15
7 15
9 14
8 13
7 16
8 16
7 16
4 18
5 15
4 15
4 17
5 17
4 17
1 19
1 18
1 20
1 20
35
8/64 KPIs are below baseline.
4G FDD:
1. % sites with RNA >=98% (B: 99.79, C: 98.37 ,D :1.42) >>40 Cells Down Due to TNG Media Issue, Fiber Cut B/w Baroda to Padra & Bharuch to Dahej in Multiple Zone on 11th
Min)
>>27 Cells Down Due to Multiple Fiber Cut B/w Amreli to Dholka (Voda) , Ahmedabad to Dholka (Voda) , Changodar to Bavda (Voda) & Limdi to Surendranagar Mux card Fault
Time:- 10:34 to 12:50 (136 Min)
>>9 Cells Down Due to TNG NPT Mux Faulty Due to Water Seepage at Apparelparkind in Surat Zone on 12th June , Time:- 14:57 to 22:05 (427 Min)
4G TDD:
2. % sites with RNA >=98% (B: 99.42, C: 98.92 ,D :0.50): >>68 Cells Down Due to TNG Media Issue, Fiber Cut B/w Baroda to Padra & Bharuch to Dahej in Multiple Zone on 11th
Min)
>>12 Cells Down Due to TNG NPT Mux Faulty Due to Water Seepage at Apparelparkind in Surat Zone on 12th June , Time:- 14:57 to 22:05 (427 Min)
3.Cell with user throughput > 4 mbps(TD-10) (B: 73.40, C: 55.12 ,D :18.28) : Degraded due to UL Interference Increased because of Ducting Impact from 28-Mar (SSF 7-->5 ch
4. Cell with user throughput <2 mbps(TD-10) (B: 9.40, C: 17.29,D :7.89) - Degraded due to UL Interference Increased because of Ducting Impact from 28-Mar (SSF 7-->5 chang
3G:
5. % sites with RNA >=98% (B: 99.78, C: 97.62 ,D :0.16) :>> 42 Cells Down Due to TNG dual fiber Cut Ring Failure for GUJ4p17A03, BARODA to PADRA & BHARUCH to DAHEJ in
22:10 (156 Min)
>> 11 Cells Down Due to TNG NPT MUX Faulty Due to Water Seepage @ APPAREL PARK in Surat on 12th Jun, Time:- 14:59 to 20:23 (323 Min)
6.% Cells with CRE count >50(B: 1.47, C: 2.17 ,D :0.70) : CRE Degraded on 11th June'19 due to RNC67 IUR flapping issue towards RNC61 and RNC66- 328 cells impacted, After
meeting target.
L2100:
7.Cell with user throughput > 4 mbps(FD) (B: 67.47, C: 63.89 ,D :3.58) :
8.Cell with user throughput < 2 mbps(FD) (B: 5.38, C: 7.89 ,D :2.51) :
4G TDD
3.NHVS RNA (B:99.55, C: 98.83 D:0.72):>>24 Cells Down Due to TNG Media Issue, Fiber Cut B/w Baroda to Padra & Bharuch to Dahej in Multiple Zone on 11th June, Time:- 19
>>12 Cells Down Due to TNG NPT Mux Faulty Due to Water Seepage at Apparelparkind in Surat Zone on 12th June , Time:- 14:57 to 22:05 (427 Min)
4.Cell with user throughput > 4 mbps(TD-10)(B:85.89, C:80.84 D:5.05) : Degraded due to UL Interference Increased because of Ducting Impact from 28-Mar (SSF 7-->5 change
3G:
5.NHVS RNA (B:97.85, C: 97.20 D:0.65): >> 28 Cells Down Due to TNG Fiber cut Kadodara to Kalewadi & E54435 node isolated in Surat on 12th Jun, Time:- 18:29 to 22:04 (215
>> 19 Cells Down Due to TNG NPT MUX Faulty Due to Water Seepage @ APPAREL PARK in Surat on 12th Jun, Time:- 14:59 to 20:23 (323 Min)
>> 13 Cells Down Due to TNG dual fiber Cut Ring Failure for GUJ4p17A03, BARODA to PADRA & BHARUCH to DAHEJ in Baroda on 11th Jun, Time:- 19:34 to 22:10 (156 Min)
6.% Cells with CRE count >50(B: 0.84, C: 1.19 ,D :0.35) :CRE Degraded on 11th June'19 due to RNC67 IUR flapping issue towards RNC61 and RNC66- 226 cells impacted, After e
meeting target
2G:
7.NHVS RNA (B:96.80, C: 96.36 D:0.44): >>> 47 Cells Down Due to TNG Panindra Node Isolated in Baroda on 10th Jun, Time:- 16:25 to 19:53 (207 Min)
>> 27 Cells Down Due to TNG NPT MUX Faulty Due to Water Seepage @ APPAREL PARK in Surat on 12th Jun, Time:- 14:59 to 20:23 (323 Min)
>> 21 Cells Down Due to TNG dual fiber Cut Ring Failure for GUJ4p17A03, BARODA to PADRA & BHARUCH to DAHEJ in Baroda on 11th Jun, Time:- 19:34 to 22:10 (156 Min)
L2100::
8.Cell with user throughput <2 mbps(FD)(B:3.32, C:3.65 D:0.33) :
17.02 9.4 7.62
KPI B C D
Cell with user throughput < 2 mbps (FD) 7.61 29.33 21.72
4
>> 44 cells due to Fiber issue//Closed (23- ANG & 21- TNG)
>> 85 cells due to Infra issue// Closed- 76 & Open - 9 (3- ATC & 6- BSNL)
>> 11 cells due to Ops issue (7- HW & 4- OHS)
hput degraded in
>>1816 cellsdue
12 cells with
toPRB Utilization
Planned > 70
activity (5- % and payload
Active, 6- Infra increased by 27 TB ( Overall payload increased by 138 TB
& 1- Project)
Throughput degraded in 952 cells with PRB Utilization > 70 % and payload increased
>> 104 cells due to Fiber issue//Closed
by 15 TB (68- ANG & 36- TNG)
>> 161 cells due to Infra issue// Closed- 143 & Open - 18 (12- BSNL & 6- GTL)
>> 57 cells due to Ops issue (37- HW & 20- OHS)
>> 64 cells due to Planned activity (2- Active, 34- Fiber, 18- Infra & 10- Project)
Outage trend is (73K to 73K min/670 to 706 Instances wrt WK31 Vs WK09) along with ducting impact has increased which is impacted KPIs.
Major outages,
>> 14 cells due to Ops issue (9- HW & 5- OHS)
>> 34 cells due to Planned activity (8- Infra & 26- Project)
>> 40 cells due to Fiber issue//Closed (23- ANG & 17- TNG)
>> 74 cells due to Infra issue// Closed- 68 & Open - 6 (BSNL)
1.) % sites with RNA >=98%(B99.28,C98.68,D-0.599999999999994):>> 44 cells due to Fiber issue//Closed (23- ANG & 21- TNG)
>> 85 cells due to Infra issue// Closed- 76 & Open - 9 (3- ATC & 6- BSNL)
4G 11
>> FDD:
cells due to Ops issue (7- HW & 4- OHS)
>> 12 cells due to Planned activity (5- Active, 6- Infra & 1- Project) 99.28 98.68 0.60 0.59
2.) % Cell PS drop call rate >0.9%(B4.99523666244473,C24.138,D19.1427633375553): 4.99 24.13 -19.14 -19.14
3.) Cell with user throughput > 4 mbps (FD)(B78.2679404445711,C43.278,D-34.9899404478.26 43.27 34.99 34.99
5.)
4.) % Cells
Cell withwith
userRNA >=98%(B99.62,C98.52,D-1.10000000000001):>>
throughput 104 cells due to Fiber
< 2 mbps (FD)(B7.60986552445529,C29.328,D21.71813447 issue//Closed
7.60 29.32 (68- ANG & 36- TNG)
-21.72 -21.72
>>
4G 161
TDD:cells due to Infra issue// Closed- 143 & Open - 18 (12- BSNL & 6- GTL) 0.00 0.00
>> 57 cells due to Ops issue (37- HW & 20- OHS)
>> 64 cells due to Planned activity (2- Active, 34- Fiber, 18- Infra & 10- Project) 99.62 98.52 1.10 1.10
6.) %PS RRC setup success rate >98%(B99.681,C96.62,D-3.06100000000001): 99.68 96.62 3.06 3.06
7.) % cells PS RAB setup success rate >98%(B99.738,C96.846,D-2.89200000000001): 99.73 96.84 2.89 2.89
8.) % Cell PS drop call rate >0.9%(B3.347,C12.454,D9.10699999999999): 3.34 12.45 -9.11 -9.11
VOLTE: 0.00 0.00
Severe ducting observed rom 24th Feb onwards. 96.17 96.06 0.11 0.10
2G:14 cells due to Ops issue (9- HW & 5- OHS)
>>
>> 34 cells due to Planned activity (8- Infra & 26- Project) 98.46 98.01 0.45 0.44
11.) % cells with SD blocking >1%(B0.08,C0.114000000000004,D0.0340000000000043) 0.08 0.11 -0.03 -0.03
12.) % cells with TCH blocking >2%(B0.075,C0.140000000000015,D0.065000000000014 0.07 0.14 -0.07 -0.07
L2100 :: due to Ops issue (11- HW & 4- OHS)
>> 15 cells
>> 11 cells due to Planned activity (3- Active, 3- Infra & 5- Project) 99.22 98.95 0.27 0.26
14.) % Cell PS drop call rate >0.9%(B22.3826662534387,C22.914,D0.531333746561266 22.38 22.91 -0.53 -0.53
15.) Cell with user throughput > 4 mbps (FD)(B65.2718035667145,C41.268,D-24.0038 65.27 41.26 24.01 24.01
16.) Cell with user throughput < 2 mbps (FD)(B7.01740462845154,C27.642,D20.62459 7.01 27.64 -20.63 -20.63
78.26
7.60
0.00
99.62
99.68
99.73
3.34
0.00
96.17
98.46
0.08
0.07
22.38
65.27
7.01
NHVS KPI B C D
hput degraded in 1150 cells with PRB Utilization > 70 % and payload increased by 16 TB ( Overall Payload increased by 121 TB)
Throughput degraded in 466 cells with PRB Utilization > 70 % and payload increased by 5.7 TB
>> 84 cells due to Fiber issue//Closed (27- ANG, 13- Copper media & 44- TNG)
>> 142 cells due to Infra issue// Closed- 118 & Open - 24 (6- ATC, 3- Bharti, 4- Indus &
11- Small Cell)
>> 8 cells due to Ops issue (3- HW & 5- OHS)
>> 40 cells due to Planned activity (12- Active, 6- Fiber, 15- Infra & 7- Project)
Throughput degraded due to high UL RSSI impact across circle and SSF changed from 7 to 5
Throughput degraded due to high UL RSSI impact across circle and SSF changed from 7 to 5
Throughput degraded due to high UL RSSI impact across circle and SSF changed from 7 to 5
Throughput degraded due to high UL RSSI impact across circle and SSF changed from 7 to 5
Outage trend is (50K to 72K min/442 to 696 Instances wrt WK31 Vs WK09) along with ducting impact has increased which is impacted KPIs.
Major
Outageoutages,
trend is (50K to 72K min/442 to 696 Instances wrt WK31 Vs WK09) along with ducting impact has increased which is impacted KPIs.
Major outages,
>> 167 cells due to Fiber issue//Closed (28- ANG & 139- TNG)
>> 165 cells due to Infra issue// Closed- 146 & Open - 19 (3- ATC, 7- Bharti, 6- BSNL & 3- Indus)
>> 45 cells due to Fiber issue//Closed (3- ANG & 42- TNG)
>> 79Major
cells due to Infra
intensity issue// Closed-
of ducting 73 & Open
was increased - 6 (1-
on 29th JanATC, 2- Bharti
& 3rd/4th Feb& in
3- Wk06.
BSNL)
Major intensity of ducting was increased on 29th Jan & 3rd/4th Feb in Wk06.
1.) % sites with RNA >=98%-(B-99.01,C-98.69,D-0.320000000000007):>> 91 cells due to Fiber issue//Closed (26- ANG & 65- TNG)
>> 125 cells due to Infra issue// Closed- 112 & Open - 13 (7- Bharti, 3- BSNL & 3- Reliance)
4G 10
>> FDD:
cells due to Ops issue (2- HW & 8- OHS)
>> 32 cells due to Planned activity (6- Active, 16- Infra & 10- Project) 99.01 98.69 0.32 0.32
2.) % Cell PS drop call rate >0.9%-(B-8.39538291699696,C-27.47,D--19.074617083003): 8.39 27.47 -19.08 -19.08
3.) Cell with user throughput > 4 mbps (FD)-(B-92.0719426762472,C-63.058,D-29.013942 92.07 63.05 29.02 29.02
5.)
4.) % Cells
Cell withwith
userRNA >=98%-(B-99.45,C-99,D-0.450000000000003):>>
throughput 84 cells due to Fiber1.68
< 2 mbps (FD)-(B-1.68810966282254,C-15.922,D--14.2338 issue//Closed
15.92 (27- ANG, 13- Copper
14.24 media
14.24& 44- TNG)
>>
4G 142
TDD:cells due to Infra issue// Closed- 118 & Open - 24 (6- ATC, 3- Bharti, 4- Indus & 11- Small Cell) 0.00
>> 8 cells due to Ops issue (3- HW & 5- OHS)
>> 40 cells due to Planned activity (12- Active, 6- Fiber, 15- Infra & 7- Project) 99.45 99.00 0.45 0.45
6.) %PS RRC setup success rate >98%-(B-99.467,C-95.032,D-4.435): 99.46 95.03 4.43 4.42
7.) % cells PS RAB setup success rate >98%-(B-99.403,C-95.026,D-4.37700000000002): 99.40 95.02 4.38 4.38
8.) % Cell PS drop call rate >0.9%-(B-4.662,C-18.128,D--13.466): 4.66 18.12 -13.46 -13.46
9.) Cell with user throughput > 4 mbps(TD-20)-(B-94.405,C-81.038,D-13.367):Throughpu94.40 81.03 13.37 13.37
10.) Cell with user throughput > 4 mbps(TD-10)-(B-86.666,C-76.116,D-10.55):Throughpu86.66 76.11 10.55 10.55
11.) Cell with user throughput<2 mbps(TD-20)-(B-1.022,C-2.606,D--1.584):Throughput d 1.02 2.60 -1.58 -1.58
12.) Cell with user throughput <2 mbps(TD-10)-(B-2.703,C-3.532,D--0.829):Throughput 2.70 3.53 -0.83 -0.83
VoLTE: 0.00
Severe ducting observed rom 24th Feb onwards. 96.78 95.80 0.98 0.98
Severe ducting observed rom 24th Feb onwards. 4.39 6.52 -2.13 -2.13
2G:
>> 16 cells due to Ops issue (11- HW & 5- OHS)
>> 40 cells due to Planned activity (3- Active, 16- Infra & 21- Project) 98.30 98.05 0.25 0.25
.) -(B-,C-,D-):
16.)
>> 0 % sites
cells with
due RNAissue
to Ops >=98%-(B-99.0575635876841,C-98.72,D-0.337563587684073):
(-)
>> 6 cells due to Planned activity (2- Active, 3- Infra & 1- Project) 21.64 16.00 5.64 5.64
Major intensity of ducting was increased on 29th Jan & 3rd/4th Feb in Wk06. 73.66 17.00 56.66 56.66
Major intensity of ducting was increased on 29th Jan & 3rd/4th Feb in Wk06. 3.49 12.93 -9.44 -9.44
99.01
8.39
92.07
1.68
0.00
99.45
99.46
99.40
4.66
94.40
86.66
1.02
2.70
0.00
96.78
4.39
98.30
21.64
73.66
3.49