On Site Installation Check List 5.0
On Site Installation Check List 5.0
Cooperator: Supervisor:
2-3 The antistatic wrist-strap is inside the cabinet and connected to the ESD port
The horizontal error of the cabinet is less than 3 mm and the vertical error is not
2-4
more than 3 mm
All screws are securely fastened. The spring washers are installed on the flat
2-5
washers
The surface of the cabinet is clean and tidy. All the labels on the surface are
2-6
correct, readable, and intact
The front door of the cabinet is easy to open and close and the paint job of the
2-7
cabinet is not damaged (while opening/closing the door)
2-8 The cabinet is fully isolated from the floor
The cabinet is fully sealed (water tight) and seal adhesives are applied on the
2-9
holes/outlets of the cabinet
The site environment is cleaned (after BTS installation) from any waste and left-
2-10
over material
2-11 The internal cabling and board configuration are as per engineering documents
The side power equipment is well secured to the floor and is located on the side
2-12
of the BTS cabinet (for indoor only)
After completion of Site installation, Pending items list (snag list) prepared (if
2-13
any)
3-11 The DCSU board DIP switch is in the correct position (75ohm or 120ohm)
3-12 The E1 is labeled on both sides (both ends)
6-4 GND terminal connector to Side Power side completed (for indoor only)
7-13 RF Feeder identified at the bottom (towards BTS) and top (towards antenna)
RF Feeder grounding clips connected at top, bottom and before the BTS to the
7-14
MGB (for less than 60m tower).
7-15 Grounding clips connected at the middle (for more than 60m tower).
7-16 Grounding clips attached to feeder are made waterproof
7-17 Distance between feeder clamps is 1.5m to 2m
7-18 Each RF path is well connected and identified
Antennas placement should be in the 45-degree protected area of the lightning
7-19
rod
The azimuth and tilt angle of the installed antenna should be as per engineering
7-20 design specifications and should not be more than ± 5 degrees. The tilt angle
error should not be more than ± 0.5 degrees
7-21 The Omni antenna should be vertical with error less than ± 2 degrees.
The VSWR test result is as per requirement (1.2db or less) and the test results
7-22
ready to be provided to Huawei's PM
7-23 The Paint for the cable feeders and the jumpers are done professionally
The SUPERVISOR will check the Support/Mounting for the GSM antenna (If
required for a site). In case the GSM antenna cannot be installed with the CDMA
7-24
existing antenna (due to space constrain), a new mounting (as defined by
Customer) will be installed by the COOPERATOR
The SUPERVISOR will make sure that the original orientation (angle, height,
7-25 direction and azimuth) of the CDMA antenna remains unchanged, after new
mounting installation
8-3
Follow the acceptance protocol/procedure provided by Huawei PM
8-4
Verify the communication between the BTS (Site) and the associated BSC
8-5 Put Site in service
Supervisor completes the FINAL Site quality check list (this document) and get it
9-2
signed by the Cooperator to be submitted to Huawei’s PM
9-3 Cargo Problems Feedback Form
9-4 Installation environment check list
9-5 Antenna VSWR and TRX power test record table
9-6 Equipment Installation Report (GSM BTS)
9-7 Preliminary Acceptance Test (PAT)
9-8 Pictures of all Installation work and equipment, as per SOW
Send to Huawei the Installation Report including all the required inventory
9-9
information
Inventory list of all the SIR label numbers corresponding to Huawei’s labels
9-10
numbers to be submitted to Huawei's PM
__________________________________ _____________________________________
SIGNATURE FOR Cooperator SIGNATURE FOR Huawei (Supervisor)
__________________________________ _____________________________________
(Cooperator's Representative Name) (Huawei's Representative Name)
__________________________________ ____________________________________
Date Date