0% found this document useful (0 votes)
72 views

Instructions:: Task 4: Quantity Take-Off

This document provides instructions for a quantity take-off task using construction drawings. Students are asked to perform manual calculations to determine quantities of excavation and backfill, concrete works, steel reinforcement, masonry works, and structural steel works from the drawings. They must then upload their computations and summary in PDF format to the classroom.

Uploaded by

Mac KY
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views

Instructions:: Task 4: Quantity Take-Off

This document provides instructions for a quantity take-off task using construction drawings. Students are asked to perform manual calculations to determine quantities of excavation and backfill, concrete works, steel reinforcement, masonry works, and structural steel works from the drawings. They must then upload their computations and summary in PDF format to the classroom.

Uploaded by

Mac KY
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

TASK 4: QUANTITY TAKE-OFF

Instructions:
1. From the attached construction drawings, perform a quantity take-off of the following
item of works.
 Excavation and Backfill
 Concrete Works
 Steel Reinforcement Works
 Masonry Works
 Structural Steel Works
2. The use of any computer aided program is prohibited. Full-hand calculation of each work
activities is a must.
3. Upload computation with summary in the classroom in pdf format.

You might also like