Capsim Capstone - Best Strategy - COMPETITION 5.0
Capsim Capstone - Best Strategy - COMPETITION 5.0
Round Pfmn Size Pfmn Size Pfmn Size Pfmn Size Pfmn Size STRATEGY 4
1 5.7 14.3 2.5 17.5 8.6 11.4 9.4 16.0 4.0 10.6 add 1/3 IDEAL
2 6.4 13.6 9.5 10.5 10.4 15.3 4.7 9.6 28% adjust
3 7.1 12.9 10.4 9.6 11.4 14.6 5.4 8.6
4 7.8 12.2 4.5 15.5 11.3 8.7 12.4 13.9 6.1 7.6
5 8.5 11.5 12.2 7.8 13.4 13.2 6.8 6.6
6 9.2 10.8 13.1 6.9 14.4 12.5 7.5 5.6
7 9.9 10.1 14.0 6.0 15.4 11.8 8.2 4.6
8 10.6 9.4 14.9 5.1 16.4 11.1 8.9 3.6
0.40 (0.40) 0.4 (0.3) 0.30 (0.40)
Traditional Low End High End Performance Size IDEAL SPOTS
Round Pfmn Size Pfmn Size Pfmn Size Pfmn Size Pfmn Size STRATEGY 2
1 5.7 14.3 3.0 17.0 9.8 10.2 10.4 15.3 4.7 9.6
2 6.4 13.6 3.0 17.0 10.7 9.3 11.4 14.6 5.4 8.6
3 7.1 12.9 4.0 16.0 11.6 8.4 12.4 13.9 6.1 7.6
4 7.8 12.2 4.5 15.5 12.5 7.5 13.4 13.2 6.8 6.6
5 8.5 11.5 5.0 15.0 13.4 6.6 14.4 12.5 7.5 5.6
6 9.2 10.8 5.5 14.5 14.3 5.7 15.4 11.8 8.2 4.6
7 9.9 10.1 6.0 14.0 15.2 4.8 16.4 11.1 8.9 3.6
8 10.6 9.4 6.5 13.5 16.1 3.9 17.4 10.4 9.6 2.6
(0.8) 0.8 1.4 (1.4) 1.4 (1.0) 1.0 (1.4)
Drift 0.7 (0.7) 0.5 (0.5) 0.9 (0.9) 1.0 (0.7) 0.7 (1.0) Ideal Spot
GROWTH
TRA 9.2
LE 11.7
HE 16.2
PER 19.8
SIZ 18.3
Suggested
TRAD
Age 2 47%
Price 20 30 23% 30
Ideal 5 15 21%
MTBF 14000 19000 9% 17000
LE
Price 15 25 53% 21
Age 7 24% Get this table from Indutry Condition Repor
Ideal 1.7 18.3 16% of STRATEGY 1 to automatica
MTBF 12000 17000 7% 14000
Note that this table is diffe
HE
Ideal 8.9 11.1 43%
Age Primary
0 29% Name Segment
MTBF 20000 25000 19% 23000 Baker Trad
Price 30 40 9% 40 Bead Low
Bid High
PERF Bold Pfmn
MTBF 22000 27000 43% 27000 Buddy Size
Ideal 9.4 16 29%
Price 25 35 19%
Age 1 9% 40
SIZE
Ideal 4 10.6 43%
Age 1.5 29%
MTBF 16000 21000 19% 20000
Price 25 35 9% 35
Traditional Low End High End Performance Size SWEET 2
Round Pfmn Size Pfmn Size Pfmn Size Pfmn Size Pfmn Size STRATEGY 3
1 5.7 14.3 2.5 17.5 9.1 10.9 9.7 15.8 4.2 10.3 add 1/2 IDEAL
2 6.4 13.6 10.0 10.0 10.7 15.1 4.9 9.3 50% adjust
3 7.1 12.9 10.9 9.1 11.7 14.4 5.6 8.3
4 7.8 12.2 4.5 15.5 11.8 8.2 12.7 13.7 6.3 7.3
5 8.5 11.5 12.7 7.3 13.7 13.0 7.0 6.3
6 9.2 10.8 13.6 6.4 14.7 12.3 7.7 5.3
7 9.9 10.1 14.5 5.5 15.7 11.6 8.4 4.3
8 10.6 9.4 15.4 4.6 16.7 10.9 9.1 3.3
0.70 (0.70) 0.70 (0.50) 0.50 (0.70)
Traditional Low End High End Performance Size STRATEGY 1
Round Pfmn Size Pfmn Size Pfmn Size Pfmn Size Pfmn Size
0 5.0 15.0 2.5 17.5 7.5 12.5 8.0 17.0 3.0 12.0 START HERE
1 5.7 14.3 3.0 17.0 8.4 11.6 9.0 16.3 3.7 11.0
2 6.4 13.6 3.5 16.5 9.3 10.7 10.0 15.6 4.4 10.0
3 7.1 12.9 4.0 16.0 10.2 9.8 11.0 14.9 5.1 9.0
4 7.8 12.2 4.5 15.5 11.1 8.9 12.0 14.2 5.8 8.0
5 8.5 11.5 5.0 15.0 12.0 8.0 13.0 13.5 6.5 7.0
6 9.2 10.8 5.5 14.5 12.9 7.1 14.0 12.8 7.2 6.0
7 9.9 10.1 6.0 14.0 13.8 6.2 15.0 12.1 7.9 5.0
8 10.6 9.4 6.5 13.5 14.7 5.3 16.0 11.4 8.6 4.0
Drift 0.7 (0.7) 0.5 (0.5) 0.9 (0.9) 1.0 (0.7) 0.7 (1.0)
Ideal Spot - - (0.8) 0.8 1.4 (1.4) 1.4 (1.0) 1.0 (1.4)
IDEAL OFFSETS
ble from Indutry Condition Report and Use Round 0 data to put in first line
of STRATEGY 1 to automatically calculate all STRATEGIES
Production Information
Unit
Primary Units Revision
Name Inven Age Dec.31
Segment Sold Date
tory
Total
19,000
100.00%
5.30% 997 16.20%
9.30% 1,764 23.63%
1.90% 366 17.20%
1.90% 356 22.33%
1.70% 314 18.99%
20.00% 3,800
2nd Auto
Shift & mation Capacity Next Plant
Plant Utiliz.
Over- Next Round Utiliz.
time Round
Production Information
A_LE 0 0 2/3/2019 0
Production Information
Name Primary Segment Units Sold Unit Inven tory Revision Date Age Dec.31
Production Information
Name Primary Segment Units Sold Unit Inven tory Revision Date Age Dec.31
A_LE 0 0 2/3/2019 0
Add 10%
add 50%
21403
Total
21,403
100.00%
6.10% 1,473 0
8.70% 1,883 0
2.60% 495 0
2.30% 472 0
2.50% 465 0
22.20%
2nd
Pfmn Material Labor Contr. Shift &
MTBF Size Coord Price
Coord Cost Cost Marg. Over-
time
Total
25,586
100.00%
6.00%
8.80%
2.60% 5.7 14 $29.50 $7.85 37%
1.90% 3 17 $21.00 $7.52 32%
2.40% 8.6 12 $39.50 $8.97 38%
21.80% 10.1 15 $34.50 $8.97 28%
16000 4 10 $34.50 $8.97 37%
0 0 - $0.00 $0.00 0%
Total
25,686
100.00%
5.00%
8.00%
1.90%
2.00%
1.60%
18.40%
MTBF Pfmn Coord Size Coord Price Labor Cost Contr. Marg.
Total
25,686
100.00%
5.00%
8.00%
1.90%
2.00%
1.60%
18.40%
MTBF Pfmn Coord Size Coord Price Labor Cost Contr. Marg.
0 0 - $0.00 $0.00 0%
Total
25,686
100.00%
5.00%
8.00%
1.90%
2.00%
1.60%
18.40%
Total
25,893
100.00%
6.00%
8.80%
2.70%
2.30%
2.40%
22.20%
Total
25,684
100.00%
4.70%
5.90%
1.80%
1.70%
1.70%
15.80%
Auto mation
Pfmn Coord Size Coord Price Material Cost Labor Cost Contr. Marg. 2nd Shift & Next Round
5.9 14.5 $28.00 $11.59 $7.49 29% 0% 4
3.4 17 $21.00 $7.81 $7.12 27% 30% 5
8.4 12 $38.00 $15.98 $8.57 33% 0% 3
9.8 15.5 $33.00 $15.87 $8.57 23% 0% 3
4.4 11 $33.00 $13.62 $8.57 30% 0% 3
70%
195%
5 2,000 140% 64%
7 1,660 173% 84%
3 900 75% 76%
3 600 81% 0%
3 600 81%
5 500 0% 54%
57% 6.5 1,700 156%
0% 3 900 49%
0% 3 600 63%
0% 3 600 56%
0% 5 1,800 76%
45% 6.7 1,480 143%
0% 3 900 63%
0% 3 600 59%
0% 3 600 65%
0% 5 500 0%
Over-
time
0% 5 1,800 69%
33% 6.7 1,480 132%
0% 3 900 58%
0% 3 600 54%
0% 3 600 60%
0% 5 500 0%
2nd Shift & Auto mation Next Round Capacity Next Round Plant Utiliz.
Over-
time
0% 5 1,800 69%
33% 6.7 1,480 132%
0% 3 900 58%
0% 3 600 54%
0% 3 600 60%
0% 5 500 0%
2nd Shift & Auto mation Next Round Capacity Next Round Plant Utiliz.
Over-
time
0% 5 1,800 69%
33% 6.7 1,480 132%
0% 3 900 58%
0% 3 600 54%
0% 3 600 60%
0% 5 500 0%
Capacity Plant
Next Round Utiliz.
1,800 66%
1,400 129%
900 45%
600 73%
600 63%
Production Information
Unit MARKET
SALES
Primary Units Inven SHARE
Name Segment Sold tory
Baker Trad 1497 297 7,341
Bead Low 2,102 215 9,316
Bid High 466 208 2,873
Bold Pfmn 423 403 2,291
Buddy Size 308 668 2,313
Bead2 Low 297 0 9,316
Baker2 0 0
Production Information
1,197.97
Total
24,134
100.00%
6.20% 1,483 20.20%
8.60% 2,068 22.20%
1.80% 425 14.80%
1.70% 410 17.90%
1.10% 275 11.90%
2.10% 497 5.34%
21.50% 5,159 5373969.79%
MTBF Pfmn Coord Size Coord Price Material Cost Labor Cost
Total
28,961
100.00%
5.50%
5.90%
2.70%
2.30%
2.30%
18.80%
Material
Age Dec.31 MTBF Pfmn Coord Size Coord Price Cost Labor Cost
3.1 17500 5.9 14.5 $28.00 $11.59 $7.49
4.6 14000 3.4 17 $21.00 $7.81 $7.12
1.7 23000 8.4 12 $38.00 $15.98 $8.57
2.5 25000 9.8 15.5 $33.00 $15.87 $8.57
2.6 19000 4.4 11 $33.00 $13.62 $8.57
2nd Shift
& Auto mation Next Capacity Next
Plant Utiliz. Plant Utiliz.
Over- Round Round
time
106%
152%
0% 6 1,400 42% 99%
49% 8 1,660 147% 134%
0% 3 900 78% 139%
33% 3 600 132% 172%
23% 3 600 122% 0%
0% 5 700 0%
0% 5 350 0%
Capac
ity
Next
Contr. Auto mation Roun
Marg. 2nd Shift & Next Round d Plant Utiliz.
29% 0% 4 1,800 66%
27% 30% 5 1,400 129%
33% 0% 3 900 45%
23% 0% 3 600 73%
30% 0% 3 600 63%
Production Information
Unit MARKET
SALES
Primary Units Inven SHARE
Name Segment Sold tory
Baker Trad 1407 425 8,016
Bead Low 2,346 245 10,407
Bid High 602 200 3,339
Bold Pfmn 662 38 2,744
Buddy Size 730 235 2,737
Bead2 Low 629 163
Baker2 Trad 385 209
Bold2 Pfmn 0 0
Potential Market Share in
Units
Trad Low High Pfmn Size
Units 8016 10407 3339 2744 2737
Demanded
% of Market 29.40% 38.20% 12.30% 10.10% 10.10%
Baker 17.60%
Bead 22.50%
Bid 15.50%
Bold 21.20%
Buddy 14.30%
Bead2 0.50% 5.70%
Baker2 3.20% 3.00%
Bold2
Total 21.30% 28.20% 18.50% 21.20% 14.30%
Production Information
586
Total
27242 (643) 1,668 767
(367) 2,249 1,975
100.00%
5.20% 1,411 0.18
8.60% 2,342 0.29
1.90% 518 0.06
2.10% 582 0.07
1.40% 391 0.05
2.30% 633 0.08
1.30% 357 0.04
- -
22.90%
Labor
MTBF Pfmn Coord Size Coord Price Material Cost Contr. Marg.
Cost
32,691
100.00%
2.40%
5.10%
0.60%
1.10%
0.40%
2.90%
0.60%
13.00%
3.40%
4.90%
2.80%
2.60%
3.50%
4.10%
21.40%
Total
32,691
100.00%
3.00%
8.00%
0.50%
1.20%
0.70%
13.60%
Total
33,507
100.00%
3.90%
8.20%
1.40%
1.70%
1.00%
3.30%
1.10%
20.60%
Total
32,298
100.00%
4.10%
8.40%
1.50%
1.10%
0.90%
3.40%
1.10%
20.40%
Total
32,691
100.00%
5.90%
8.10%
3.10%
2.10%
1.30%
2.40%
1.60%
24.50%
Material Contr.
Age Dec.31 MTBF Pfmn Coord Size Coord Price Cost Labor Cost Marg.
3.1 17500 5.9 14.5 $28.00 $11.59 $7.49 29%
4.6 14000 3.4 17 $21.00 $7.81 $7.12 27%
1.7 23000 8.4 12 $38.00 $15.98 $8.57 33%
2.5 25000 9.8 15.5 $33.00 $15.87 $8.57 23%
2.6 19000 4.4 11 $33.00 $13.62 $8.57 30%
2nd Shift
& Auto mation Next Capacity Next Plant Utiliz.
Plant Utiliz.
Over- Round Round
time
117%
194%
0% 6 1,800 85% 69%
100% 10 2,300 198% 94%
29% 3 900 128% 43%
58% 3 600 157% 191%
100% 3 600 198% 83%
0%
19% 6 1,800 118%
0% 7.8 1,650 81%
11% 4 900 109%
43% 4 600 140%
93% 4 800 190%
4% 0 4 1,875 53%
57% 0 4 1,550 131%
15% 0 3 900 46%
20% 0 3 600 86%
5% 0 3 600 21%
44% - 7 1,800 6%
39% 1 10 1,405 197%
21% - 3 900 87%
17% 0 3 600 128%
21% - 3 600 75%
48% 0 10 500 136%
39% - 7 500 52%
0% - 3 300 0%
Capac
ity
Next
Auto mation Roun
2nd Shift & Next Round d Plant Utiliz.
0% 4 1,800 66%
30% 5 1,400 129%
0% 3 900 45%
0% 3 600 73%
0% 3 600 63%
Production Information
Unit
Primary Units
Name Inven SALES MARKET GROWTH
Segment Sold SHARE
tory
Production Information
1,674 15.93%
3,111 22.30%
1,201 25.80%
588 14.90%
233 6.00%
1,325 9.50%
1,584 15.08%
601
Max 1600
1,800 66%
1,400 129%
900 45%
600 73%
600 63%
Production Information
Unit MARKET GROWTH
Primary Units Inven SALES
SHARE
Name Segment Sold tory
Able Trad 1641 446 11,414 1.092
Acre Low 4,239 59 15,163 1.117
Adam High 291 437 5,285 1.162
Aft Pfmn 135 30 4,598 1.198
Agape Size 75 3 4,447 1.183
Acre_2 Low 2376 0 15,163 1.117
Able_2 Trad 1830 317 11,414 1.092
Adam_2 High 1210 523 5,285 1.162
Potential Market Share in Units
Trad Low High Pfmn Size Total
Units 11,414 15,163 5,285 4,598 4,447 41,784
Demanded
% of Market 27.90% 37.10% 12.90% 11.20% 10.90% 100.00%
Able 14.30% 0.001 3.80%
Acre 26.50% 9.90%
Adam 5.50% 0.70%
Aft 2.9% 0.60%
Agape 1.70% 0.20%
Acre_2 20% 7.30%
Able_2 16.00% 4.50%
Adam_2 22.90% 2.90%
Total 28.90% 0.455 0.278 0.055 0.022 30.00%
Production Information
1,647 0
4,018 0
291 0
133 0
76 0
2,987 0
1,826 0
1,210 0
2nd Shift
Material &
Pfmn Coord Size Coord Price Labor Cost Contr. Marg.
Cost Over-
time
Auto
Capacity
mation Plant Utiliz.
Next Plant Utiliz. Plant Utiliz. Plant Utiliz.
Next
Round
Round
118%
193%
8 1,800 109% 103% 119% 43%
10 2,600 178% 198% 198% 0%
5 900 74% 70% 70% 0%
3 130 99% 99% 99% 170%
3 1 0% 99% 99% 193%
10 2,000 198% 185% 186% 96%
8 1,400 198% 198% 128%
5 1,200 193% 198% 198%
Auto mation Capacity Plant
2nd Shift & Next Round Next Round Utiliz.
0% 4 1,800 66%
0% 3 900 45%
0% 3 600 73%
0% 3 600 63%
Production Information
Unit MARKET GROWTH
Primary Units Inven SALES
SHARE
Name Segment Sold tory
Able Trad 2013 334 12,281 1.092
Acre Low 5,038 170 17,013 1.117
Adam High 761 320 6,320 1.162
Aft Pfmn 30 0 5,310 1.198
Agape Size 3 0 5,180 1.183
Acre_2 Low 3920 41 17,013 1.117
Able_2 Trad 1952 217 1.092
Adam_2 High 1236 336 1.162
Potential Market Share in Units
Trad Low High Pfmn Size Total
Units 12,281 17,013 6,320 5,310 5,180 47,315
Demanded
% of Market 26.60% 36.90% 13.70% 11.50% 11.20% 100.00%
Able 16.30% 4.20%
Acre 30.30% 11.20%
Adam 12.00% 1.60%
Aft 1.1% 0.30%
Agape 0.10%
Acre_2 24% 8.80%
Able_2 15.90% 4.20%
Adam_2 19.60%
Total 30.70% 0.541 0.309 0.019 0.002
Production Information
2,002 16.30%
5,155 30.30%
758 12.00%
58
5
4,066 23.90%
1,953 15.90%
1,239
2nd Shift
Contr. &
Pfmn Coord Size Coord Price Material Cost Labor Cost
Marg. Over-
time
Auto
mation Capacity Next Plant Utiliz. Plant Utiliz.
Plant Utiliz. Plant Utiliz.
Next Round
Round
63% 118%
198% 193%
8 1,800 106% 100% 86% 43%
10 3,200 198% 198% 0% 0%
5 1,100 72% 56% 0% 0%
3 1 0% 198% 198% 170%
3 1 0% 137% 177% 193%
10 2,600 198% 149% 137% 96%
8 1,600 132%
5 1,400 87%
Auto mation Capacity Plant
Contr. Marg. 2nd Shift & Next Round Next Round Utiliz.
29% 0% 4 1,800 66%
27% 30% 5 1,400 129%
Production Information
2,336 17.50%
4,056 21.40%
1,307 17.90%
3,525 18.60%
2,149 16.10%
1,007 13.80%
14,395 107.83%
2nd Shift
Contr. &
Pfmn Coord Size Coord Price Material Cost Labor Cost
Marg. Over-
time
86% 118%
198% 193%
8 2,000 128% 85% 43%
10 3,800 198% 198% 0%
5 1,400 187% 144% 0%
10 3,100 198% 94% 170%
8 1,700 134% 1,200 193%
5 1,500 88 1,000 96%
Auto mation Capacity Plant
2nd Shift & Next Round Next Round Utiliz.
0% 4 1,800 66%
30% 5 1,400 129%
0% 3 900 45%
0% 3 600 73%
0% 3 600 63%
Producti
on
Informat
ion
Unit
Primary Units Revision Age Pfmn Size
Name Inven MTBF Price
Segment Sold Date Dec.31 Coord Coord
tory