The document appears to be a daily inspection checklist from the HSE General Department of a petroleum projects and technical consultations company. The checklist contains 12 items related to safety inspections of work areas and activities. It includes checking that work areas are clean and orderly, lifting devices are in good condition, hand tools and PPE are properly maintained, fire extinguishers are fully charged, waste is properly segregated, equipment and tools are in good condition, and hazardous materials have accompanying safety data sheets. The purpose is to ensure compliance with safe working practices through regular inspections.

Uploaded by

Faris Wahed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
858 views

Daily Inspection Heck List: HSE General Department

The document appears to be a daily inspection checklist from the HSE General Department of a petroleum projects and technical consultations company. The checklist contains 12 items related to safety inspections of work areas and activities. It includes checking that work areas are clean and orderly, lifting devices are in good condition, hand tools and PPE are properly maintained, fire extinguishers are fully charged, waste is properly segregated, equipment and tools are in good condition, and hazardous materials have accompanying safety data sheets. The purpose is to ensure compliance with safe working practices through regular inspections.

Uploaded by

Faris Wahed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

THE PETROLEUM PROJECTS & TECHNICAL

‫ﺷﺮﻛﺔ اﻟﻤﺸﺮوﻋﺎت اﻟﺒﺘﺮوﻟﻴﺔ و اﻹﺳﺘﺸﺎرات اﻟﻔﻨﻴﺔ‬


CONSULTATIONS CO.
HSE General Department ‫اﻹدارة اﻟﻌﺎﻣﺔ ﻟﻠﺴﻼﻣﺔ واﻟﺼﺤﺔ اﻟﻤﻬﻨﻴﺔ وﺣﻤﺎﻳﺔ اﻟﺒﻴﺌﺔ‬
‫ﺑﺘـــﺮوﺟــــــﺖ‬
/‫ﻋﺎم‬ / ‫ﻗﺎﺋﻤﺔ اﻟﺘﻔﺘﻴﺶ اﻟﻴﻮﻣﻰ ﻋﻠﻰ أﻧﺸﻄﺔ اﻟﺴﻼﻣﺔ ﺷﻬﺮ‬
Daily Inspection heck List11 10 9 8 7 6 5 4 ITEM
31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 3 2 1 S.N
(..................../ ‫ﻋﺎم‬.........../ ‫اﻟﺘﺎرﻳﺦ)ﺷﻬﺮ‬ ........ /‫ﻣﻮﻗﻊ اﻟﻌﻤﻞ‬ ‫اﻟﺒـﻨـﺪ‬
Is the work area clean and orderly?
1
‫ھﻞ أﻣﺎﻛﻦ اﻟﻌﻤﻞ ﻧﻈﯿﻔﺔ وﻣﺮﺗﺒﺔ؟‬
-Adequacy and serviceability of lifting devices /
stacking aids / trolleys / handcarts etc
2
‫ ھﻞ ﻣﻌﺪات اﻟﺮﻓﻊ اﻟﯿﺪوي واﻟﺘﺮوﻟﻰ و ﻋﺮﺑﺎت اﻟﯿﺪ وﻣﺎ ﺷﺎﺑﮫ ﻣﻦ‬-
‫أدوات ﻣﻼﺋﻤﺔ؟ و ھﻞ ﯾﺘﻢ ﺻﯿﺎﻧﺘﮭﺎ؟‬
- Is hand tools in good conditions and good
serviceability? 3
‫ھﻞ اﻟﻌﺪد اﻟﯿﺪوﯾﺔ ﺑﺤﺎﻟﺔ ﻣﻨﺎﺳﺒﺔ؟ و ھﻞ ﯾﺘﻢ ﺻﯿﺎﻧﺘﮭﺎ دورﯾﺎ؟‬-
- Do your PPE suits the type of work?
4
‫ھﻞ ﺣﺎﻟﮫ ﻣﮭﻤﺎت اﻟﻮﻗﺎﯾﺔ ﻣﻨﺎﺳﺒﺔ و ﻣﻼﺋﻤﺔ ﻟﻄﺒﯿﻌﺔ اﻟﻌﻤﻞ؟‬
- Is all fire extinguishers fully charged and in
designated locations? 5
‫ ھﻞ ﺟﻤﯿﻊ اﻟﻄﻔﺎﯾﺎت ﻣﻤﻠﻮءة وﻓﻲ أﻣﺎﻛﻨﮭﺎ اﻟﻤﻨﺎﺳﺒﺔ ؟‬-
- Are the instructions and rules for welding and
cutting followed? 6
‫ ھﻞ ﯾﺘﻢ إﺗﺒﺎع ﻗﻮاﻋﺪ وﺗﻌﻠﯿﻤﺎت ﻋﻤﻠﯿﺎت اﻟﻘﻄﻊ و اﻟﻠﺤﺎم؟‬-
- Is there a system of locks and tags utilized at
isolation points? 7
‫ھﻞ ﻧﻈﺎم اﻟﻐﻠﻖ واﻟﻌﺰل ﯾﺘﻢ ﺗﻄﺒﯿﻘﮫ ؟‬
- Is waste segregation going well?
8
‫ ھﻞ ﯾﺘﻢ ﺗﻄﺒﯿﻖ ﻧﻈﺎم ﻓﺼﻞ اﻟﻤﺨﻠﻔﺎت؟‬-
- is the equipment and tools in good conditions?
9
‫ ھﻞ اﻟﻤﻌﺪات واﻷﻻت ﺑﺤﺎﻟﺔ ﺟﯿﺪة ؟‬-
- Is the storage operation is going well?
10
‫ ھﻞ ﻋﻤﻠﯿﺔ اﻟﺘﺨﺰﯾﻦ ﺗﺘﻢ ﺑﺼﻮرة ﻣﻨﺎﺳﺒﺔ؟‬-
- Are plant / vehicle operations (e.g. cranes)
supervised to ensure compliance with safe
working practices? 11
‫ھﻞ ﻋﻤﻠﯿﺎت اﻟﺮﻓﻊ ﺗﺘﻢ ﺗﺤﺖ إﺷﺮاف ﻣﺸﺮف ﻟﻀﻤﺎن اﻻﻣﺘﺜﺎل‬
‫ﻟﺘﻌﻠﯿﻤﺎت اﻟﻌﻤﻞ اﻵﻣﻦ ؟‬
Is there a Material Safety Data Sheet readily
available for each hazardous substance used?
‫ ھﻞ ﯾﻮﺟﺪ وﺛﯿﻘﺔ اﻟﺘﻌﺮف ﻋﻠﻰ اﻟﻤﺨﺎطﺮ ﻟﻠﻤﻮاد ﺟﺎھﺰ و ﻣﺘﺎح‬- 12
‫ﻟﻜﻞ ﻣﺎدة ﺧﻄﺮة ؟‬

Issue No. (4) Issue Date: Oct.2018 Revision No. (0) Page: 1/3 PJ-HSEMSF-9.1- 04
THE PETROLEUM PROJECTS & TECHNICAL
‫ﺷﺮﻛﺔ اﻟﻤﺸﺮوﻋﺎت اﻟﺒﺘﺮوﻟﻴﺔ و اﻹﺳﺘﺸﺎرات اﻟﻔﻨﻴﺔ‬
CONSULTATIONS CO.
HSE General Department ‫اﻹدارة اﻟﻌﺎﻣﺔ ﻟﻠﺴﻼﻣﺔ واﻟﺼﺤﺔ اﻟﻤﻬﻨﻴﺔ وﺣﻤﺎﻳﺔ اﻟﺒﻴﺌﺔ‬
‫ﺑﺘـــﺮوﺟــــــﺖ‬
- do you carry out the scaffold inspection
regularly and scaff-tag used?
13
scaff tag ‫ ھﻞ ﯾﺘﻢ ﻓﺤﺺ اﻟﺴﻘﺎﻻت ﺑﺼﻔﺔ ﻣﻨﺘﻈﻤﺔ ووﺿﻊ اﻟـ‬-
‫ﻋﻠﯿﮭﺎ؟‬
Emergency Passageways - free from
obstructions, electrical cords and other trip
hazards? 14
‫ھﻞ اﻟﻤﻤﺮات ﺧﺎﻟﯿﺔ ﻣﻦ اﻟﻌﻮاﺋﻖ و اﻟﻜﺎﺑﻼت اﻟﻜﮭﺮﺑﺎﺋﯿﺔ و ﻣﺨﺎطﺮ‬
‫اﻟﺘﻌﺜﺮ اﻷﺧﺮى؟‬
- do you carry out lifting operations adequately?
15
‫ ھﻞ ﯾﺘﻢ ﺗﺄﻣﯿﻦ ﻋﻤﻠﯿﺎت اﻟﺮﻓﻊ ﺑﺸﻜﻞ ﻛﺎﻓﻰ وﻣﻨﺎﺳﺐ؟‬-
- do you carry out all radiation operations
adequately? 16
‫ ھﻞ إﺟﺮاءات اﻟﺘﻌﺎﻣﻞ ﻣﻊ اﻟﻤﺼﺎدر اﻟﻤﺸﻌﺔ ﻛﺎﻓﯿﺔ وﻣﻨﺎﺳﺒﺔ؟‬-
- Does the office fire warning system tested
regularly? 17
‫ ھﻞ ﯾﺘﻢ ﻓﺤﺺ ﻧﻈﻢ إﻧﺬار اﻟﻄﻮارىء دورﯾﺎ ً؟‬-
- Are rotating or moving parts of equipment
guarded to prevent physical contact? 18
‫ ھﻞ اﻷﺟﺰاء اﻟﺪوارة واﻟﻤﺘﺤﺮﻛﺔ ﺑﮭﺎ ﺣﻤﺎﯾﺔ ﻟﻌﺪم اﻟﺘﻼﻣﺲ؟‬-
Do you compliance with company roles for all
electrical work? 19
‫ ھﻞ ﯾﺘﻢ ﺗﻄﺒﯿﻖ ﻧﻈﻢ اﻟﺸﺮﻛﺔ ﻓﻰ اﻟﺘﻌﺎﻣﻞ ﻣﻊ اﻟﻜﮭﺮﺑﺎء؟‬-
- Is the office tidy?
20
‫ ھﻞ اﻟﻤﻜﺎﺗﺐ ﻣﺮﺗﺒﺔ؟‬-
- Is clinic under control?
21
‫ ھﻞ ﯾﺘﻢ اﻟﺘﺤﻜﻢ ﺑﺎﻟﻌﯿﺎدة اﻟﻄﺒﯿﺔ؟‬-
- good ventilation (s) in work place on going
22
- ‫ ﻋﻤﻠﯿﺔ اﻟﺘﮭﻮﯾﺔ ﻓﻰ ﻣﻨﺎطﻖ اﻟﻌﻤﻞ ﻣﻨﺎﺳﺒﺔ‬-
- Waste segregation on going.
23
‫ ﯾﺘﻢ ﻓﺼﻞ اﻟﻤﺨﻠﻔﺎت ﺑﺈﺳﺘﻤﺮار‬-
- Toilet and sanitary facilities
Defect(s) observed 24
‫ وﺟﻮد ﻋﯿﻮب ظﺎھﺮﯾﺔ ﺑﺪورات اﻟﻤﯿﺎة‬-
- Waste oil requires disposal
.‫ ﯾﺘﻢ اﻟﺘﺨﻠﺺ ﻣﻦ اﻟﺰﯾﻮت اﻟﻤﺮﺗﺠﻌﺔ‬25

Issue No. (4) Issue Date: Oct.2018 Revision No. (0) Page: 2/3 PJ-HSEMSF-9.1- 04
THE PETROLEUM PROJECTS & TECHNICAL
‫ﺷﺮﻛﺔ اﻟﻤﺸﺮوﻋﺎت اﻟﺒﺘﺮوﻟﻴﺔ و اﻹﺳﺘﺸﺎرات اﻟﻔﻨﻴﺔ‬
CONSULTATIONS CO.
HSE General Department ‫اﻹدارة اﻟﻌﺎﻣﺔ ﻟﻠﺴﻼﻣﺔ واﻟﺼﺤﺔ اﻟﻤﻬﻨﻴﺔ وﺣﻤﺎﻳﺔ اﻟﺒﻴﺌﺔ‬
‫ﺑﺘـــﺮوﺟــــــﺖ‬
- Toilet and sanitary facilities Hygiene acceptable
26
‫ ﺻﻼﺣﯿﺔ دورات اﻟﻤﯿﺎة ﻟﻠﺼﺤﺔ اﻟﻌﺎﻣﺔ‬-
- Is radiation protection \ barrier used
27
‫ ھﻞ ﯾﺘﻢ إﺳﺘﺨﺪام ﺣﺎﺟﺰ اﻟﻮﻗﺎﯾﺔ)وﺳﺎﺋﻞ اﻟﺤﻤﺎﯾﺔ( ﻣﻦ اﻷﺷﻌﺔ؟‬-
- Waste oil and waste batteries Storage facility
adequately maintained 28
.‫ طﺮق ﺗﺨﺰﯾﻦ اﻟﺰﯾﻮت اﻟﻤﺮﺗﺠﻌﺔ واﻟﺒﻄﺎرﯾﺎت اﻟﻤﺴﺘﮭﻠﻜﺔ ﻣﻨﺎﺳﺒﺔ‬-
- Oil filters need to be disposed
29
.‫ ﻓﻼﺗﺮ اﻟﺰﯾﺖ ﺗﺤﺘﺎج ﻟﻠﺘﺨﻠﺺ‬-
- Chemicals stored in area that is covered & ventilated
30
‫ ﻣﻨﺎطﻖ ﺗﺨﺰﯾﻦ اﻟﻜﯿﻤﺎوﯾﺎت ﻣﻌﺰوﻟﺔ وﺟﯿﺪة اﻟﺘﮭﻮﯾﺔ‬-
- Solid waste need to be disposed
31
‫ اﻟﻤﺨﻠﻔﺎت اﻟﺼﻠﺒﺔ ﺗﺤﺘﺎج ﻟﻠﺘﺨﻠﺺ‬-
- Spraying program against insects carried
out 32
‫ ﻧﻈﺎم ﻣﻜﺎﻓﺤﺔ اﻟﺤﺸﺮات ﻣﻔﻌﻞ‬-
- usage and ability of PPE that control of
environmental impact
33
‫ ﻣﮭﻤﺎت اﻟﻮﻗﺎﯾﺔ اﻟﺸﺨﺼﯿﺔ ﻣﺴﺘﺨﺪﻣﺔ وﺻﺎﻟﺤﺔ ﻟﻠﺤﺪ ﻣﻦ‬-
‫اﻟﺘﺄﺛﯿﺮات اﻟﺒﯿﺌﯿﺔ‬

Conformity
Conformance Nonconformance

prepared by Safety responsible:- -:‫ ﻣﺴﺌﻮل اﻟﺴﻼﻣﺔ‬/ ‫ إﻋﺪاد‬-


signature:- :‫ اﻟﺘﻮﻗﻴﻊ‬-

Approved by HSE manager: -:‫ إﻋﺘﻤﺎد ﻣﺪﻳﺮ اﻟﺒﻴﺌﺔ واﻟﺴﻼﻣﺔ‬-

signature:- -:‫ اﻟﺘﻮﻗﻴﻊ‬-

Issue No. (4) Issue Date: Oct.2018 Revision No. (0) Page: 3/3 PJ-HSEMSF-9.1- 04