0% found this document useful (0 votes)
41 views

Computations

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views

Computations

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

FOOTING Volume Of Gravel = 12.

142 m3

Volume=1.5*1.5*0.3=0.675
Total Volume=0.675*16=10.80m3 SUMMARY

No. of Cement = 10.8*12 = 129.6 ≈ 130bags TOTAL CEMENT = 594 bags

Volume Of Sand = 10.8*.5=5.40m3 TOTAL VOLUME OF SAND = 24.706 m3

Volume Of Gravel = 10.80m3 TOTAL VOLUME OF GRAVEL = 49.407 m3

Vol of GB=1.5*1.5*0.05*16=1.8 ≈2m3


CHB WALL REINFORCEMENTS
TIE BEAM 12mm ∅ vertical

Total Volume=0.35*0.25*72.2=6.3175 m3 L=4.7+0.35+0.35-0.075-0.05+0.4=5.65m

No. of Cement = 6.3175*12 = 75.81≈ 76 bags No. of bar vertical = 4.1/0.6 = 6.83 ≈ 7 ∗ 3 = 21pcs
– 12mm∅x6m 10mm ∅ horizontal
Volume Of Sand = 6.3175*.5=3.16 m3
L=4.1+0.4+0.4+0.4-0.05(2) = 5.2m
Volume Of Gravel = 6.3175 m3
No. of bars horizontal= 4.7/0.6 = 8 ∗ 3 = 24pcs –
10mm∅x6m 12mm ∅ vertical L=5.65
COLUMN No. of bars vertical= 3.1/0.6 = 6 ∗ 4 = 24pcs –
12mm∅x6m 10mm ∅ horizontal
Total Volume=0.40*0.40*86.443=13.83 m3
L=3.1+0.4+0.4+0.4-0.05(2)=4.2+0.8=5m
No. of Cement = 13.83*12 = 166 bags
Volume Of Sand = 13.83*.5=6.915 m3 No. of bars horizontal= 4.7 0.6 = 8 ∗ 4 = 32pcs− 10
mm∅x6m 12mm ∅ vertical
Volume Of Gravel = 13.83 m3
L=5.65
No. of bars vertical= 6.1 0.6 = 11pcs − 12
BEAM mm∅x6m 10mm ∅ horizontal

Total Volume=0.35*0.25*72.2=6.3175 m3 L=6.1+0.4+0.4+0.4-0.05(2)=7.2m,6-1.2=4.8

No. of Cement = 6.3175*12 = 75.81≈ 76 bags No. of bars horizontal= 4.7 0.6 = 12pcs − 10
mm∅x6m 12mm ∅ vertical
Volume Of Sand = 6.3175*.5=3.16 m3
L=5.65 No. of bars vertical= 1.6 0.6 = 3 ∗ 3 = 9pcs
Volume Of Gravel = 6.3175 m3 − 12 mm∅x6m 10mm ∅ horizontal
L=1.6+0.4+0.4+0.4-0,05(2)=2.7\
SLAB No. of bars horizontal=4*3=12pcs − 10 mm∅x6m
Total Volume=121.42.5*0.1=12.142 m3
No. of Cement = 12.142*12 = 146 bags SUMMARY
Volume Of Sand =12.142*.5=6.071 m3 12 mm∅x6m =65pcs
10 mm∅x6m =80pcs 12.71 BF/m2
A=1.8X16=28.8m2

CHB WALL RoL=2”X2”X14’=4.67 BF/m2

1m2=12.5 CHB BF=28.8x12.71=367

6” CHB (exterior) #RoL= 367 4.67 = 78.59 ≈ 79pcs − 2"x2"x14'

A=12.43+8.13+4.18+19.03+10.23+9.13+4.92+11.3
3+9.13+4.92+13.17=106.6m2
FORMS COLUMN
CHB=106.6 ∗ 12.5 = 1332.5 ≈ 1333 pcs
A=1.43m2x16=22.88
4’ CHB (interior)
#Plywood= 22.88/1.2x2.4 = 8pcs − 4’x8’x 1 4 "
A=91.41
CHB=91.41 ∗ 12.5 = 1142 ≈ 1143 pcs
Cement Mortar (Class B) SCAFFOLDING
6” CHB A= 106.6m2 HT=0.65*16=10.4m

Cement=106.6*1.018=108.51≈ 109 bags 2”x3”x14’=7bf/m2


Sand=106.6*0.0844=8.997 ≈ 9m3 7-Vertical
4” CHB A= 91.41m2 31/67x.5=horizontal
Cement=91.41*0.522=47.72≈ 48 bags 17.5=diagonal
Sand=91.41*0.0435=3.98 ≈ 4m3 BF=10.4(7+ 31.67 2 + 17.5) = 420
SUMMARY 2”x3”x14’= 420/7 = 60pcs
6” CHB=1333 pcs
4” CHB=1143 pcs
FORMS BEAM
Cement =157 bags
L=72.2-(0.4X16)=65.8
3
Volume of sand=13m
A=0.35(65.8)*2+(0.25+0.05+0.05)(65.8)
#Plywood= 69.0/1.2x2.4 = 24pcs − 4’x8’x 1 4 "

FORMS FOOTING
A=1.5x1.5x0.3x4=1.8�2 TILES
Plywood= 1.8/1.2*2.4 = 0.62 ∗ 16 = 9.92 ≈ 10pcs- Living, Dining, Kitchen, Bedrooms
4’x8’x 1/4”
A=(6.1x5.1)+(1.6x1.3)+(3.1x3.1)+(4.1x3.1)+(4.1x1
.6)+[(4.1x4.1)-(2x1.5)]+(2.6x3.1)=83.94m2
No. Of Tiles= 83.94 0.3∗0.3 = 932.67 ≈ 933 pcs
BRACE FACTOR Toilet/Bathroom
A= (1.6x1.625) +(1.65x1.15)=4.4975 ≈ 4.5�2 No. V= 9.13*0.02=0.1826
Of Tiles= 4.5 0.3∗0.3 = 50 pcs
# of Cement
#Cement=88.5x0.02x12=21.24 ≈ 22 bags =0.1826*12=2.19*2=4.38≈5bags

Ceiling # of Sand =0.1826*2=0.3652m3


6mm (1.2x2.4) A = (1.6*3.3)-(0.6X0.6)=4.92m2
# of Plywood = 88.5 1.2�2.4 = 30.73 ≈ 31pcs V= 4.92*0.02=0.0984
2 boxes of blind rivet # of Cement
=0.0984*12=1.18*2=2.36≈3bags
# of Sand =0.0984*2=0.1968m3
PLASTERING
A = (4.1*3.3)-2(1.1*1)=11.33m2
2
A = (3.3*4.1)-(1.1*1)=12.43m
V= 11.33*0.02=0.2266
V= 12.43*0.02=0.2486≈ 0.25
# of Cement
# of Cement =0.25*12=3*2=6bags =0.2266*12=2.7192*2=5.44≈6bags
# of Sand = .25*2=0.5m3 # of Sand =0.2266*2=0.4532m3
A = (3.3*3.1)-(2.1*1)=8.13m2 A = (3.1*3.3)-(1.1X1)=9.13m2
V= 8.13*0.02=0.1626 V= 9.13*0.02=0.1826
# of Cement =0.1626*12=2*2=4bags # of Cement
=0.1826*12=2.19*2=4.38≈5bags
# of Sand = 0.1626*2=0.3252m3
# of Sand =0.1826*2=0.3652m3
A = (1.6*3.3)-(1.1*1)=4.18m2
V= 4.18*0.02=0.0836 A = (1.6*3.3)-(0.6X0.6)=4.92m2

# of Cement =0.0836*12≈3bags V= 4.92*0.02=0.0984


# of Cement
# of Sand = 0.0836*2=0.1672m3
=0.0984*12=1.18*2=2.36≈3bags
A = (6.1*3.3)-(2.1*1)=19.03m2
# of Sand =0.0984*2=0.1968m3
V= 19.03*0.02=0.3806
A = (4.1*3.3)-(0.6X0.6)=13.17m2
# of Cement =0.3806*12=4.57*2≈10bags
V= 13.17*0.02=0.2634
# of Sand = 0.3806*2=0.7612m3
# of Cement
2
A = (3.1*3.3)=10.23m =0.2634*12=3.16*2=6.32≈7bags
V= 10.23*0.02=0.2046 # of Sand =0.2634*2=0.5268m3
# of Cement
=0.2046*12=2.455*2=4.91≈5bags
# of Sand =0.2046*2=0.4092m3
A = (3.1*3.3)-(1.1X1)=9.13m2