Computations
Computations
142 m3
Volume=1.5*1.5*0.3=0.675
Total Volume=0.675*16=10.80m3 SUMMARY
No. of Cement = 6.3175*12 = 75.81≈ 76 bags No. of bar vertical = 4.1/0.6 = 6.83 ≈ 7 ∗ 3 = 21pcs
– 12mm∅x6m 10mm ∅ horizontal
Volume Of Sand = 6.3175*.5=3.16 m3
L=4.1+0.4+0.4+0.4-0.05(2) = 5.2m
Volume Of Gravel = 6.3175 m3
No. of bars horizontal= 4.7/0.6 = 8 ∗ 3 = 24pcs –
10mm∅x6m 12mm ∅ vertical L=5.65
COLUMN No. of bars vertical= 3.1/0.6 = 6 ∗ 4 = 24pcs –
12mm∅x6m 10mm ∅ horizontal
Total Volume=0.40*0.40*86.443=13.83 m3
L=3.1+0.4+0.4+0.4-0.05(2)=4.2+0.8=5m
No. of Cement = 13.83*12 = 166 bags
Volume Of Sand = 13.83*.5=6.915 m3 No. of bars horizontal= 4.7 0.6 = 8 ∗ 4 = 32pcs− 10
mm∅x6m 12mm ∅ vertical
Volume Of Gravel = 13.83 m3
L=5.65
No. of bars vertical= 6.1 0.6 = 11pcs − 12
BEAM mm∅x6m 10mm ∅ horizontal
No. of Cement = 6.3175*12 = 75.81≈ 76 bags No. of bars horizontal= 4.7 0.6 = 12pcs − 10
mm∅x6m 12mm ∅ vertical
Volume Of Sand = 6.3175*.5=3.16 m3
L=5.65 No. of bars vertical= 1.6 0.6 = 3 ∗ 3 = 9pcs
Volume Of Gravel = 6.3175 m3 − 12 mm∅x6m 10mm ∅ horizontal
L=1.6+0.4+0.4+0.4-0,05(2)=2.7\
SLAB No. of bars horizontal=4*3=12pcs − 10 mm∅x6m
Total Volume=121.42.5*0.1=12.142 m3
No. of Cement = 12.142*12 = 146 bags SUMMARY
Volume Of Sand =12.142*.5=6.071 m3 12 mm∅x6m =65pcs
10 mm∅x6m =80pcs 12.71 BF/m2
A=1.8X16=28.8m2
A=12.43+8.13+4.18+19.03+10.23+9.13+4.92+11.3
3+9.13+4.92+13.17=106.6m2
FORMS COLUMN
CHB=106.6 ∗ 12.5 = 1332.5 ≈ 1333 pcs
A=1.43m2x16=22.88
4’ CHB (interior)
#Plywood= 22.88/1.2x2.4 = 8pcs − 4’x8’x 1 4 "
A=91.41
CHB=91.41 ∗ 12.5 = 1142 ≈ 1143 pcs
Cement Mortar (Class B) SCAFFOLDING
6” CHB A= 106.6m2 HT=0.65*16=10.4m
FORMS FOOTING
A=1.5x1.5x0.3x4=1.8�2 TILES
Plywood= 1.8/1.2*2.4 = 0.62 ∗ 16 = 9.92 ≈ 10pcs- Living, Dining, Kitchen, Bedrooms
4’x8’x 1/4”
A=(6.1x5.1)+(1.6x1.3)+(3.1x3.1)+(4.1x3.1)+(4.1x1
.6)+[(4.1x4.1)-(2x1.5)]+(2.6x3.1)=83.94m2
No. Of Tiles= 83.94 0.3∗0.3 = 932.67 ≈ 933 pcs
BRACE FACTOR Toilet/Bathroom
A= (1.6x1.625) +(1.65x1.15)=4.4975 ≈ 4.5�2 No. V= 9.13*0.02=0.1826
Of Tiles= 4.5 0.3∗0.3 = 50 pcs
# of Cement
#Cement=88.5x0.02x12=21.24 ≈ 22 bags =0.1826*12=2.19*2=4.38≈5bags