0% found this document useful (0 votes)
273 views3 pages

Stand Pipe System Check List

This document is a checklist for inspecting a standpipe system. It contains information about the factory and contractors involved. It outlines inspections, testing, and maintenance to be done weekly, monthly, quarterly, semiannually, and annually. Items include control valves, gauges, fire department connections, hose valves, alarms, drains, piping, cabinets, hoses, racks, and testing of remote connections, hydrostatic pressure, control valves, and reducing valves.

Uploaded by

aminul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
273 views3 pages

Stand Pipe System Check List

This document is a checklist for inspecting a standpipe system. It contains information about the factory and contractors involved. It outlines inspections, testing, and maintenance to be done weekly, monthly, quarterly, semiannually, and annually. Items include control valves, gauges, fire department connections, hose valves, alarms, drains, piping, cabinets, hoses, racks, and testing of remote connections, hydrostatic pressure, control valves, and reducing valves.

Uploaded by

aminul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

APPENDIX C (STANDPIPE SYSTEM INSPECTION CHECK LIST)

To be completed by the Inspector at the time of Inspection


Attach additional sheets, data or calculation as necessary to provide a complete record

FACTORY INFORMATION

Factory Name: Aptech Caswier Ltd.

Representative Name: Md. Aminul Islam

Designation: Officer- Fire & Safety

Phone: 01724127417 Fax: _______________

E-mail: [email protected]

INSTALLATION, SERVICE AND TESTING CONTRACTOR INFORMATION

Contractor Name: Mechanical Engineering Solution Ltd.

Address: Baridhara DOHS, Road#10, House#521.

Inspector or Tester Name: Md. Yousuf

Qualification of Inspector or Tester: Mechanical Engineer

Phone: _________________ Fax: _______________

E-mail:_________________

A Contract for Inspection & testing in accordance with NFPA is in effect as of: ________

The Contract Expires: ________________Frequency of Test: __________________

WITNESS BY

Company Name: Aptech Caswier Ltd.

Address: 30 Sharabo, Kasimpur, Gazipur.

Representative Name: Md. Mehedi Hasan

Designation: Manager (HR & Compliance)

Phone: 01724537541 Fax: _______________

E-mail: mehedi@aptechdesignsltd .com


��

24|43
Inspection, Testing & Maintenance: Weekly Scope Action Taken

Control Valve - (sealed) Inspection YES / NO

Gauges Inspection YES / NO

Inspection, Testing & Maintenance: Monthly Scope Action Taken

Control Valve - (locked) Inspection YES / NO

Control Valve - (tamper switches) Inspection YES / NO

Inspection, Testing & Maintenance: Quarterly Scope Action Taken

Fire Department Connection Inspection YES / NO


Maintenance

Hose Valves Inspection YES / NO

Low Air Pressure Alarms Testing YES / NO

Main Drain Testing YES / NO

Pressure Regulating Devices and Connections Inspection YES / NO

Waterflow Alarms Testing YES / NO

Inspection, Testing & Maintenance: Scope Action Taken


Semiannually

Control Valve – (tamper switches) Testing YES / NO

Inspection, Testing & Maintenance: Annually Scope Action Taken

Cabinet Inspection YES / NO

Fire Hose Inspection YES / NO


Testing

Hose Connections Maintenance YES / NO

Hose Connection/Pressure Regulating Devices Inspection YES / NO

Hose Nozzles Inspection YES / NO

Hose Racks Inspection YES / NO

Hose Storage Device Testing YES / NO

Main Drain Testing YES / NO

Piping Inspection YES / NO


Pressure Reducing Valves Inspection YES / NO

Valves (all types) Maintenance YES / NO

Inspection, Testing & Maintenance: Annually Scope Action Taken

Flow Test Most Remote Hose Connection Testing YES / NO

Hydrostatic Test (dry systems or pipe) Testing YES / NO

Pressure Control Valve Testing YES / NO

Pressure Reducing Valve Testing YES / NO

26|43