0% found this document useful (0 votes)
44 views2 pages

Ningbo Relocation Project Meeting Agenda

The document outlines the agenda for a series of meetings from September 18-22 regarding a Ningbo relocation project. It lists the meeting dates, times, locations, leaders, and topics to be discussed each day. The topics include introductions, an overview of the project scope, schedule, and responsibilities, as well as more detailed discussions of specific areas like stock preparation, pulping lines, and the power plant. It also lists the meeting participants from various companies involved in the project.

Uploaded by

Shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views2 pages

Ningbo Relocation Project Meeting Agenda

The document outlines the agenda for a series of meetings from September 18-22 regarding a Ningbo relocation project. It lists the meeting dates, times, locations, leaders, and topics to be discussed each day. The topics include introductions, an overview of the project scope, schedule, and responsibilities, as well as more detailed discussions of specific areas like stock preparation, pulping lines, and the power plant. It also lists the meeting participants from various companies involved in the project.

Uploaded by

Shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Ningbo Relocation Project Meeting Agenda

Sept.18 Sept.19 Sept.20 Sept.21 Sept.22


Date Leader Leader Leader Leader Leader
Monday Tuesday Wednesday Thursday Friday
(Meeting room 1#) Rajesh/mill
8:00 Beginning-Team Member head:Liu Group 1 (Meeting room 1#) Group 1(Meeting room 1#) (Meeting room 1#) (Meeting room 1#)
Introduction Jichun
Ningbo Mill Introduction Lin Zheng Stock Preparation Rajesh V Stock Preparation Rajesh V Focus on Project Execution PM Attendant

Ningbo Relocation Project Brief Any additional issue


Introduction: GPG Ind. Attendant
a)Scope discussion

8:30 b)Schedule Liu YD/GPG Ind. Pulping line Dodda S Pulping line Dodda S
c)Responsibility WEC Dodda S
9:00 User requirement clarification CCK Dodda S Finishing Rahul S PM1 document&drawing Attendant Meeting minutes Attendant
collection signature
a)      Stock Prep & Board machines Rajesh V GCC Dodda S WEC Dodda S
b)      Finishing house Rajesh V Electric Zulkifli/HYH CCK Dodda S
10:00 c)       Pulping lines (all types) Dodda S Instrument Tehdy GCC Dodda S
d)      FWT, ETP, Utility Rathinam KP Document&drawing collection AD
Project execution and check
e)      CCK and Chemical plants Dodda S AD Document&drawing collection AD Meeting Close-out Rajesh
f)       Boiler and TG &BOP Rathinam KP Group 2 (Meeting room 2#) Group 2 (Meeting room 2#) and check
11:00 g)      Field walk- through Hua Xiyao Power Plant(Boiler) Rathinam Power Plant(TG and other) Rathinam

Lunch Time Lunch Time Lunch Time Lunch Time

13:00 Detail Discussion Group 1(Meeting room 1#) Group 1(Meeting room 1#) (Meeting room 1#)
Group 1 (Meeting room 1#) Rajesh V PM2&3 lines Rajesh V Electric Zulkifli Procurement issue Mr. wijaya
PM1 Line Board machine and auxiliary /Huang YH
Board machine and auxiliary Instrument Tehdy Transportation Liao Guangsong

Finishing Finishing Project execution


17:00 End End End Project plan review Attendant
13:00 Group 2 (Meeting room 2#) Group 2 (Meeting room 2#) Group 2 (Meeting room 2#) a)Scope
Power Plant (Boiler) Rathinam Power Plant(TG) Rathinam FWT & ETP Rathinam b)Schedule
Project execution Document&drawing collection AD c)Responsibility
17:00 End End End End
Note:
1. Meeting room 1# is Ningbo Zhonghua Administration Building 6A meeting room
2. Meeting room 2# is Powerplant meeting room (3rd floor)
Ningbo Relocation Meeting Name List
GPG China (10) Purchasing CTC(1) Jinsun(1) Ningbo mill(15) Serong Mill(1) GPG Indo.(5) Pindo Deli Mill(9)
Center(2)
Yin Hua(PD) Lin Zheng/Hua Xiyao/Qiu Zhenlong Richard Mark Turner Chao Jen Tseng
PM&Stock: Paper machine
Liu Yadong(PM) Sandy Wijaya Lai Laijun(M), Ye Ming(E), Wu Joseph W Myers
production
Xiaotong(I)
PM Auxiliary:
Yang Peidong(M), Chu Xiahua Qian Wei(M),
Siak Yance Paper machine
Ding Guoqiang(M) Korompis production
Bei Zhiwei(E),Li Yi(I)
i. Stock Prep / BMs – Rajesh V
ii. Pulping lines, CCK, Chemicals, BOP –
Power Plant&BOP: Dodda S winder, roll
iii. FWT, WTP, Utilities; DM plant and Boiler Cheng Chih handling,
Wang Xiaozhong(M&I) Zhao Zhu Hongwei Kan Zhiming(M),Liu Rathinam KP & TG for Serang – Rathinam KP Shiung intermedia WH,
Renping Huaide(E),Wong Oubo(I) iv. Dismantling Coord, Scope split, Mech finishing
works, Converting plant, IRS, FRS – Rahul S
v. Engineering documents, Scope, Inquiries,
Zulkifli(E) Reverse Engg, Transalation of drgs/docs – Budi Setyanto
Stock
Alain D preparation, DIP,
Huang Yaohuang(E) Finishinhg:
Tri Eriyanto FWT WWT
li Jitao(M),Hu Jiang(E) Engineering, EI,
Tehdy(I) Wei Yen Chun ME
Herman
Chen Fengqing(I) Kurniawan EI

Ayung Kurniawan
Ramy(I) Civil Work: Wang Jiasheng Ganda Civil work