26071-203-V66A-MTFR-20044 - Rev00D - Welding Map and NDE Map (D-320-06AB)

This document provides welding and non-destructive examination (NDE) maps for an LPG tank (D-320-06A/B) that is part of an engineering, procurement, and construction project in Balikpapan, Indonesia. It includes a summary table listing 38 welds on the tank with information on NDE methods, material thickness, joint type, welding procedure specification used, and whether heat treatment and impact testing are required. The document also contains revision logs and tables of contents.

Uploaded by

Jeroan Ayam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
181 views11 pages

26071-203-V66A-MTFR-20044 - Rev00D - Welding Map and NDE Map (D-320-06AB)

This document provides welding and non-destructive examination (NDE) maps for an LPG tank (D-320-06A/B) that is part of an engineering, procurement, and construction project in Balikpapan, Indonesia. It includes a summary table listing 38 welds on the tank with information on NDE methods, material thickness, joint type, welding procedure specification used, and whether heat treatment and impact testing are required. The document also contains revision logs and tables of contents.

Uploaded by

Jeroan Ayam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

Doc. No.

: 26071-203-V66A-MTFR-20044

Job No. : 26071 Rev.00D

WELDING MAP & NDE MAP FOR SHOP


FABRICATED
(AT KDM SHOP KOREA)
LPG TANK (D-320-06A/B)

PROJECT : Engineering, Procurement and Construction (EPC) Inside


Battery Limits (ISBL) and Outside Battery Limits (OSBL) for
the Refinery Development Master Plan (RDMP) Project
RU V Balikpapan
LOCATION : Refinery Unit V Balikpapan, East Kalimantan,Indonesia
OWNER : PT PERTAMINA (Persero)
PO NO. : 26071-120-PO-MTFR-00066

00D 18 JAN 21 RE-ISSUED FOR REVIEW


J.H.CHOI K.J.CHOI ABDUL ROCHIM
00C 12 JAN 21 RE-ISSUED FOR REVIEW J.H.CHOI K.J.CHOI FAUZAN RUMZI

00B 04 JAN 21 RE-ISSUED FOR REVIEW J.H.CHOI K.J.CHOI HENRY SIANTURI

00A 27 OCT 20 ISSUED FOR REVIEW J.H.CHOI K.J.CHOI HENRY SIANTURI

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED

1 of 11
Doc. No. : 26071-203-V66A-MTFR-20044

Job No. : 26071 Rev.00D

REVISION LOG

REV. NO. DATE PAGE DESCRIPTION

00A 27 OCT 20 - ISSUED FOR REVIEW


00B 04 JAN 21 4-11 Revised Map and Add of List Weld Map
Change for Welding Map and Welding Map
00C 12 JAN 21 1-10
Summary
Change for Welding Map and Welding Map in
00D 18 JAN 21 1-11
Summary color

2 of 11
Doc. No. : 26071-203-V66A-MTFR-20044
B

Job No. : 26071 Rev.00D

Table of Contents 
Cover……………………………………………………………………………………………………… 1
Revision Sheet…………………………………………………………………………………………….2
Table of Contents…………………………………………………………………………………………3
1. Weld Map D230-06A/B……………………………………………………………………………….4
2. Weld Map D230-03…………………………………………………………………………………...6
3. Weld Map D230-04 ……………………………………………………………………………………….8
4. Weld Map D230-05 …………………………………………………………………………………………...10

3 of 11
EQUIPMENT TAG NO : D ‐ 320 ‐ 06 A/B ( LPG Tank )
PROJECT NO : 26071 WELDING AND NDE MAP SUMMARY
Material Thk  Joint  Heat 
No Joint No WPS No. NDE Method MDMT Groove / Fillet Impact Test Remarks
at Weld (mm) Category Treatment
1 E01 ‐ MH‐1 VT / UT ‐42.2 47 Groove + Fillet D YES YES*
2 E01 ‐ MH‐2 VT / UT ‐42.2 47 Groove + Fillet D YES YES*
3 E01 ‐ N‐3 VT / UT ‐42.2 47 Groove + Fillet D YES YES*
4 E01 ‐ N‐5 VT / UT ‐42.2 47 Groove + Fillet D YES YES*
5 E01 ‐ P‐1 VT / UT ‐42.2 47 Groove + Fillet D YES YES*
6 E01 ‐ N‐2 VT / UT ‐42.2 47 Groove + Fillet D YES YES*
7 E01 ‐ N‐6 VT / UT ‐42.2 47 Groove + Fillet D YES YES*
8 E01 ‐ V‐1 VT / UT ‐42.2 47 Groove + Fillet D YES YES*
9 E01 ‐ N‐4 VT / UT ‐42.2 47 Groove + Fillet D YES YES*
10 E01 ‐T‐1 VT / UT ‐42.2 47 Groove + Fillet D YES YES*
11 E01 ‐N ‐7 VT / UT ‐42.2 47 Groove + Fillet D YES YES*
12 E02 ‐ N1 VT / UT ‐42.2 47 Groove + Fillet D YES YES*
W11‐SM‐552LF 
13 E02 ‐ T2 VT / UT ‐42.2 47 Groove + Fillet D YES YES*
14 E02 ‐ L1 VT / UT ‐42.2 47 Groove + Fillet D YES YES*
15 F‐1  MT /PT ‐42.2 29 Fillet ‐ YES YES*
16 F‐4 MT /PT ‐42.2 29 Fillet ‐ YES YES*
17 F‐5 MT /PT ‐42.2 29 Fillet ‐ YES NO
18 DP ‐ 2 MT /PT ‐42.2 25 Fillet ‐ YES YES*
19 DP ‐ 5 MT /PT ‐42.2 25 Fillet ‐ YES YES*
20 BT ‐ 2 MT /PT ‐42.2 9 Fillet ‐ YES YES*
21 H ‐1 MT /PT ‐42.2 70 Fillet ‐ YES YES*
22 R ‐1 MT /PT ‐42.2 70 Fillet ‐ YES YES*
23 HD ‐1 MT /PT ‐42.2 70 Fillet ‐ YES YES*
24 SP ‐1 MT /PT ‐42.2 12 Fillet ‐ YES YES*
25 C01 RT N/A 8 Butt ‐ N/A N/A
26 C02 RT N/A 8 Butt ‐ N/A N/A
27 C03 RT N/A 8 Butt ‐ N/A N/A
28 C04 RT N/A 8 Butt ‐ N/A N/A
W88‐TM‐001 or W88‐GT‐001
29 C05 RT N/A 8 Butt ‐ N/A N/A
30 C06 RT N/A 8 Butt ‐ N/A N/A
31 C07 RT N/A 8 Butt ‐ N/A N/A
32 C08 RT N/A 8 Butt ‐ N/A N/A
33 F‐2 MT /PT N/A 29 Fillet ‐ N/A N/A
34 F‐3 MT /PT N/A 29 Fillet ‐ N/A N/A
35 F‐6 MT /PT N/A 25 Fillet ‐ N/A N/A
36 ULC‐1 MT /PT N/A 29 Fillet ‐ N/A N/A
37 DP ‐ 1 MT /PT N/A 6 Fillet ‐ N/A N/A
38 DP ‐ 3 MT /PT N/A 25 Fillet ‐ N/A N/A
39 DP ‐ 4 MT /PT N/A 25 Fillet ‐ N/A N/A
40 BT ‐ 1 W11‐GT‐001 or W11‐FC‐001 MT /PT N/A 9 Fillet ‐ N/A N/A
41 E ‐ 1 MT /PT N/A 29 Fillet ‐ N/A N/A
42 LC ‐ 2 MT /PT N/A 29 Fillet ‐ N/A N/A
43 PB ‐ 1 MT /PT N/A 12 Fillet N/A N/A
44 E ‐ 2 MT /PT N/A 29 Fillet ‐ N/A N/A
45 LC ‐ 3 MT /PT N/A 29 Fillet ‐ N/A N/A
46 LC ‐ 4 MT /PT N/A 29 Fillet ‐ N/A N/A
47 ULC‐2 MT /PT N/A 12 Fillet ‐ N/A N/A

Note : * Heat Treatment will be done at site after complete all of welding
F-6 Material Joint
WPS NO. JOINT NO.
Thickness Type
F-1~5 29t Fillet
E01~02 47t Fillet
ULC-1~2 29t Fillet
DP-2~5 25t Fillet
W11-SM-552L-F BT-1~2 9t Fillet
H-1 70t Fillet
F-2 R-1 70t Fillet
HD-1 70t Fillet
SP-1 12t Fillet
NOTE
W88-TM-001 or W88-GT-001 C01~08 8t butt
E-1~2 29t Fillet 1.UNLESS OTHERWISE , SPECIFIED WPS No. OF WELD PART
F-3
LC-2~4, 29t Fillet SHALL BE APPLIED W11-GT-001 OR W11-FC-001
W11-GT-501 or W11-FC-501
DP-1 6t Fillet 2. FCAW PROCESS IS ONLY FOR NON-PRESSURE PARTS.
PB-1 12t Fillet 3. PWHT : YES / MDMT: -42.2

DESCRIPTION WELDING PLACE

Shell to Upper Cloumn & Nozzle Shop Welding


Shell to Shell Field Welding
Upper Cloumn to Lower Cloumn Field Welding
Others Refer to latest Drawing
F-4

ULC-2

F-5

Material
Thickness
(mm)

....
....
....
.... ....
....
....
....
....
....
....
....
....
D-320-06A/06B
REV.
.... ....
WELDING MAP
.... DWG. NO.
.... 26071-V66A-D-320-06A-00002

.... DOC. NO.


26071-203-V66A-MTFR-20044
EQUIPMENT TAG NO : D ‐ 320 ‐ 03 ( Saturated C4 Tank )
WELDING AND NDE MAP SUMMARY
PROJECT NO : 26071
Material Thk  Joint  Heat 
No Joint No WPS / PQR No. NDE Method MDMT Groove / Fillet Impact Test Remarks
at Weld (mm) Category Treatment
1 E ‐ 1 MT /PT N/A 29 Fillet ‐ N/A N/A
2 LC ‐ 2 MT /PT N/A 29 Fillet ‐ N/A N/A
3 PB ‐ 1 MT /PT N/A 12 Fillet N/A N/A
W11‐GT‐001 or W11‐FC‐001
4 E ‐ 2 MT /PT N/A 29 Fillet ‐ N/A N/A
5 LC ‐ 3 MT /PT N/A 29 Fillet ‐ N/A N/A
6 LC ‐ 4 MT /PT N/A 29 Fillet ‐ N/A N/A
Note : * Heat Treatment will be done at site after complete all of welding
Material Joint
WPS NO. JOINT NO.
Thickness Type

E-2, 17.5t Fillet


W11-GT-001 or W11-FC-001 LC-2~4 17.5t Fillet
PB-1 12t Fillet

NOTE
1.UNLESS OTHERWISE , SPECIFIED WPS No. OF WELD PART
SHALL BE APPLIED W11-GT-001 OR W11-FC-001

2. FCAW PROCESS IS ONLY FOR NON-PRESSURE PARTS.


3. PWHT : NO / MDMT: -5

DESCRIPTION WELDING PLACE

Lower Cloumn Shop Welding

D-320-03
REV.

WELDING MAP
DWG. NO.
26071-V66A-D-320-03-00006

DOC. NO.
26071-203-V66A-MTFR-20044
EQUIPMENT TAG NO : D ‐ 320 ‐ 03 ( Saturated C4 Tank )
WELDING AND NDE MAP SUMMARY
PROJECT NO : 26071
Material Thk  Joint  Heat 
No Joint No WPS / PQR No. NDE Method MDMT Groove / Fillet Impact Test Remarks
at Weld (mm) Category Treatment
1 E ‐ 1 MT /PT N/A 29 Fillet ‐ N/A N/A
2 LC ‐ 2 MT /PT N/A 29 Fillet ‐ N/A N/A
3 PB ‐ 1 MT /PT N/A 12 Fillet N/A N/A
W11‐GT‐001 or W11‐FC‐001
4 E ‐ 2 MT /PT N/A 29 Fillet ‐ N/A N/A
5 LC ‐ 3 MT /PT N/A 29 Fillet ‐ N/A N/A
6 LC ‐ 4 MT /PT N/A 29 Fillet ‐ N/A N/A
Note : * Heat Treatment will be done at site after complete all of welding
Material Joint
WPS NO. JOINT NO.
Thickness Type

E-2, 17t Fillet


W11-GT-501 or W11-FC-501 LC-2~4 17t Fillet
PB-1 12t Fillet

NOTE
1.UNLESS OTHERWISE , SPECIFIED WPS No. OF WELD PART
SHALL BE APPLIED W11-GT-001 OR W11-FC-001

2. FCAW PROCESS IS ONLY FOR NON-PRESSURE PARTS.


3. PWHT : YES / MDMT: -4.2

DESCRIPTION WELDING PLACE

Lower Cloumn Shop Welding

D-320-04
REV.

WELDING MAP
DWG. NO.
26071-V66A-D-320-04-00006

DOC. NO.
26071-203-V66A-MTFR-20044
EQUIPMENT TAG NO : D ‐ 320 ‐ 05 A/B/C/D ( Propylene Tank )
WELDING AND NDE MAP SUMMARY
PROJECT NO : 26071
Material Thk  Groove /  Joint 
No Joint No WPS / PQR No. NDE Method MDMT Impact Test Heat Treatment Remarks
at Weld (mm) Fillet Category
1 E ‐ 1 MT /PT N/A 29 Fillet ‐ N/A N/A
2 LC ‐ 2 MT /PT N/A 29 Fillet ‐ N/A N/A
3 PB ‐ 1 MT /PT N/A 12 Fillet N/A N/A
W11‐GT‐001 or W11‐FC‐001
4 E ‐ 2 MT /PT N/A 29 Fillet ‐ N/A N/A
5 LC ‐ 3 MT /PT N/A 29 Fillet ‐ N/A N/A
6 LC ‐ 4 MT /PT N/A 29 Fillet ‐ N/A N/A
Note : * Heat Treatment will be done at site after complete all of welding
Material Joint
WPS NO. JOINT NO.
Thickness Type

E-2, 17.5t Fillet


W11-GT-501 or W11-FC-501 LC-2~4 17.5t Fillet
PB-1 12t Fillet

NOTE
1.UNLESS OTHERWISE , SPECIFIED WPS No. OF WELD PART
SHALL BE APPLIED W11-GT-001 OR W11-FC-001

2. FCAW PROCESS IS ONLY FOR NON-PRESSURE PARTS.


3. PWHT : YES / MDMT: -47.5

DESCRIPTION WELDING PLACE

Lower Cloumn Shop Welding

D-320-05A/05B/05C/05D
REV.

WELDING MAP
DWG. NO.
26071-V66A-D-320-05A-00002

DOC. NO.
26071-203-V66A-MTFR-20044