FAT Procedure 12m Door
FAT Procedure 12m Door
FAT PROCEDUE
CONTENTS
1 INTRODUCTION................................................................................................................................. 3
2 SETUP AND PREPARATORY WORK............................................................................................... 3
3 PROCEDURE...................................................................................................................................... 5
1 INTRODUCTION
This procedure covers the FAT test requirements of Undertun for acceptance of the 12m Door gangway.
It is intended that this document be used for recording the results of testing.
Equipment Required
2
ITEM DESCRIPTION SIGNOFF
Documentation Required
3 PROCEDURE
3
ITE FUNCTION / CAPABILITY PROCEDURE / ACCEPTANCE RESULT
M CRITERIA
Slewing function Slew left. Slew right. Slew speed
should be appropriate
4
ITE FUNCTION / CAPABILITY PROCEDURE / ACCEPTANCE RESULT
M CRITERIA
procedures
Spare parts Check spare parts to confirm parts are
correct.
Lifting Procedure Confirm the lifting and handling
procedure for the gangway is correct:
Taking photo for future reference.