Petrochina International Jabung Ltd. Job Safety Analysis: Hse-Icg/Pcj-3075-Ca/Jsa.017
Petrochina International Jabung Ltd. Job Safety Analysis: Hse-Icg/Pcj-3075-Ca/Jsa.017
017
Date:
PetroChina International Jabung Ltd. Job Safety Analysis
Job: Purging Pipe Ø 6” Sabar Bridge To Sabar #2 PAD Title of person Analyzed by:
who does the job:HSE, Supervisor, QC Inspector,
Helper
Construction Manager
Write down correct specifications of personal
Personal protective equipment (PPE) : Put
protective equipment required (Consult HSE
on PPE required for a safe job.
Dept) :
1. Safety hat / helmet √ 6. Face shield √ 11. SCBA 16. Safety shoes / √
boots
2. Safety glasses √ 7. Ear plugs / muffs √ 12. Gloves – √ 17. Rubber boots
Ordinary
3. Goggles – ordinary 8. Dust mask 13. Gloves - 18. Prot. Clothing /
Chemicals Apron
4. Goggles – tinted 9. Air-purifying respirator 14. Gloves – 19. Body harnesses,
lenses Thermal L-line
5. Goggles – Chemicals 10. Air-line respirator 15. Rubber gloves 20. Life vest
Sequence of Basic Job Steps Potential Hazards Protective Equipment Safe Procedures
1) Preparation Miscommunication Use Standard PPE (Safety Prepare Permit To Work
Misunderstanding Helm,safety glasses,coverall, Pre-job safety meeting.
Failure safety shoes) Discuss JSA to workers before job
Discuss emergency response
preparedness to workers if
emergency situation happen
Good communication with
personnel
Everyone has permission to stop
the job
1) Persiapan Miskomunikasi Gunakan PPE standard Persiapan Izin Kerja
Kesalahpahaman (Helm,Kacamata, coverall, Melakukan pembicaraan
Terjadi kegagalan sepatu) keselamatan sebelum bekerja
Membicarakan JSA kepada
pekerja sebelum bekerja
Membicarakan tanggap darurat
ke pekerja jika terjadi situasi
darurat
Komunikasi yang baik antar
personil
Setiap orang mendapatkan hak
untuk menghentikan pekerjaan
jika dapat membahayakan
pekerja
2) Preparation of Tools, and Equipment and Burner Use Standard PPE (Safety Ensure all the equipment has
Safety Sign Miscommunication Helm,safety glasses,coverall, been inspected and check by PCI
Misunderstanding safety shoes) and ready for use
Failure Be careful when pick up tools
Watch body position
Everyone must pay attention at
3) Connect hose between compressor and all times
blind flange with connector Stay focused
Ensure tools ready to use
Ensure all document for already
accepted and reviewed by PCI
Proper Safety Sign and barricade
will be install prior execution
2) Mempersiapkan Izin Kerja dan alat-alat Terbakar Gunakan PPE standard Pastikan semua peralatan yang
Miskomunikasi (Helm,Kacamata, coverall, dipergunakan untuk pekerjaan
Kesalahpahaman sepatu) sudah lulus inspeksi dan siap
Terjadi kegagalan untuk digunakan.
Berhati-hati ketika mengambil
peralatan
Memperhatikan posisi tubuh
Setiap orang harus
memperhatikan pekerjaannya
dan lingkungannya setiap waktu
3) Hubungkan selang antara kompresor dan Tetap focus
blind flange dengan konektor Memastikan semua peralatan siap
untuk digunakan
Memastikan semua dokumen
telah disetujui dan ditinjau
kembali oleh pihak PCI
Tanda Tanda Keselamatan dan
barricade terpasang sebelum
aktivitas dimulai.
4) Line check to ensure air inlet and outlet Obstruction material or equipment Use Standard PPE (Safety Ensure all the air inlet and outlet
has clear Helm,safety glasses,coverall, clear before start
safety shoes) Protection from tarpaulin to be
install at the outlet of the line for
protect against foreign body
protection
Quick opening valve to be used for
the operational testing
Before start or allow the air to
enter to the network, ensure all
valve or outlet connection has
been closed
4) Pemeriksaan sistem untuk memastikan Material atau peralatan yang Gunakan PPE standard Pastikan semua jalan masuk dan
saluran masuk dan keluar sudah bersih terjepit (Helm,Kacamata, coverall, keluar udara bersih sebelum
sepatu) dimulai.
Pasang pelindung dari terpal atau
bahan sejenis untuk melindungi
dari benda benda asing yang
keluar.
Gunakan valve pada saat
melakukan test
Sebelum mulai mengisi angin,
pastikan semua valve atau saluran
keluar sudah ditutup.
5) Start Pressurizing with air compressor High pressure hose bursting Use Standard PPE (Safety Only authorized personnel working
carefully as required and continue to Blind flange loose from flange or Helm ,safety glasses ,coverall, at the work area
open the outlet until the line cleanest. welding safety shoes) All material and tools shall be
Hose connection loosing from check during activity.
connector Ensure that all venting point are
Flying plug from coupling or other open to avoid entrapped air until
connection the system is fully filled
Install barricade tape and warning
sign
Tightening the bolt at blind flange
properly
No tightening bolt during pressure
test
Use anti whip check at hose
connection compressor.
Make sure there is no damage on
plug or welding
Ensure during pressure test no
other activity inside.
Visual check shall be made at exit
point to ensure inside of pipe
already cleanest.
Disconnect all line connection after
job completion and CPY sign report
of test for evidence and
documentation.
5) Menaikkan tekanan secara perlahan Tekanan selang yang tinggi Gunakan PPE standard Hanya pekerja yang sudah
sesuai yang diperlukan dan buka saluran mengakibatkan selang pecah (Helm,Kacamata, coverall, diotorisasi yang bekerja.
keluar perlahan juga. Sambungan flange atau pengelasan sepatu) Pastikan semua peralatan yang
lepas dipergunakan untuk pekerjaan
Sambungan selang lepas sudah lulus inspeksi dan siap
Plug yang terbang dari coupling untuk digunakan.
atau ada sambungan Pastikan semua vent point dalam
posisi terbuka untuk mencegah
udara terjebak sampai sytem pipa
terisi penuh.
Pasang barricade dan rambu
rambu keselamatan.
Kencangkan baut di blind flange
dengan benar.
Ketika sudah tekanan dinaikan,
jangan ada pengencangan baut.
Gunakan anti whip pada
sambungan selang di
compressor.
Pastikan tidak ada yang bocor
pada flange, sambungan
pengelasan.
Pastikan tidak ada aktivitas lain
ketika penaikan tekanan
dilakukan.
Lakukan visual check pada point
keluar untuk memastikan didalam
pipa sudah bersih.
Lepaskan semua sambungan
setelah selesai kerja dan CPY
menandatangi berita acara atas
pekerjaan yang sudah selesai
dilakukan.
6) Working at Night Poor illumination Use Additional Lamp, Use Ensure Additional lights are
Standard PPE (Safety available
Injury person
Helm,safety glasses,coverall, • Ensure availability of drinking
Tripping water
safety shoes), Enough Rest.
Animal attack Availability Mineral Water • Ensure replacement of shift
workers for night shifts
6) Pekerjan Pada Malam Hari Penerangan yang buruk Gunakan Lampu Tambahan, Pastikan lampu tambahan tersedia
Orang yang cedera Gunakan PPE standard • Pastikan ketersediaan air minum
Tersandung (Helm,Kacamata, coverall, • Pastikan penggantian pekerja shift
Serangan binatang sepatu), istirahat yang cukup, untuk shift malam
Tersedianya Air Mineral
7) Housekeeping Bad housekeeping Use Standard PPE (Safety Ensure housekeeping implemented
Helm,safety glasses,coverall, before and after working hours.
safety shoes) Ensure waste segregation
according criteria
7) Kebersihan Housekeeping yang buruk Gunakan PPE standard Pastikan housekeeping dilakukan
(Helm,Kacamata, coverall, sebelum dan sesudah jam kerja
sepatu) Pastikan sampah dipisah sesuai
kriteria
Note : Stop jobs, if found irregularities or changed from the JSA to further discuse with all departments involved.
Catatan : Stop pekerjaan, jika didapati penyimpangan atau perubahan dari JSA untuk di diskusikan lebih lanjut dengan semua departemen yang terlibat.