Petrochina International Jabung Ltd. Job Safety Analysis: Hse-Icg/Pcj-3075-Ca/Jsa.017

1) This JSA outlines the steps and hazards for purging a pipe from the Sabar Bridge to Sabar #2 PAD. 2) Personal protective equipment including safety hat, glasses, coveralls, gloves, and safety shoes are required. 3) Preparation includes a pre-job safety meeting to discuss the JSA and emergency response, with good communication and the right for anyone to stop work if unsafe.

Uploaded by

Yosua Situmorang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
323 views5 pages

Petrochina International Jabung Ltd. Job Safety Analysis: Hse-Icg/Pcj-3075-Ca/Jsa.017

1) This JSA outlines the steps and hazards for purging a pipe from the Sabar Bridge to Sabar #2 PAD. 2) Personal protective equipment including safety hat, glasses, coveralls, gloves, and safety shoes are required. 3) Preparation includes a pre-job safety meeting to discuss the JSA and emergency response, with good communication and the right for anyone to stop work if unsafe.

Uploaded by

Yosua Situmorang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

HSE-ICG/PCJ-3075-CA/JSA.

017
Date:
PetroChina International Jabung Ltd. Job Safety Analysis

Job: Purging Pipe Ø 6” Sabar Bridge To Sabar #2 PAD Title of person Analyzed by:
who does the job:HSE, Supervisor, QC Inspector,
Helper

Work Crew Leader


Department : Section: Reviewed by: Approved by:
PT. IndoCipta Gemilang Construction Work Crew Supv: Area Supv: F/S Supv:

Construction Manager
Write down correct specifications of personal
Personal protective equipment (PPE) : Put
 protective equipment required (Consult HSE
on PPE required for a safe job.
Dept) :
1. Safety hat / helmet √ 6. Face shield √ 11. SCBA 16. Safety shoes / √
boots
2. Safety glasses √ 7. Ear plugs / muffs √ 12. Gloves – √ 17. Rubber boots
Ordinary
3. Goggles – ordinary 8. Dust mask 13. Gloves - 18. Prot. Clothing /
Chemicals Apron
4. Goggles – tinted 9. Air-purifying respirator 14. Gloves – 19. Body harnesses,
lenses Thermal L-line
5. Goggles – Chemicals 10. Air-line respirator 15. Rubber gloves 20. Life vest
Sequence of Basic Job Steps Potential Hazards Protective Equipment Safe Procedures
1) Preparation  Miscommunication  Use Standard PPE (Safety  Prepare Permit To Work
 Misunderstanding Helm,safety glasses,coverall,  Pre-job safety meeting.
 Failure safety shoes)  Discuss JSA to workers before job
 Discuss emergency response
preparedness to workers if
emergency situation happen
 Good communication with
personnel
 Everyone has permission to stop
the job
1) Persiapan  Miskomunikasi  Gunakan PPE standard  Persiapan Izin Kerja
 Kesalahpahaman (Helm,Kacamata, coverall,  Melakukan pembicaraan
 Terjadi kegagalan sepatu) keselamatan sebelum bekerja
 Membicarakan JSA kepada
pekerja sebelum bekerja
 Membicarakan tanggap darurat
ke pekerja jika terjadi situasi
darurat
 Komunikasi yang baik antar
personil
 Setiap orang mendapatkan hak
untuk menghentikan pekerjaan
jika dapat membahayakan
pekerja
2) Preparation of Tools, and Equipment and  Burner  Use Standard PPE (Safety  Ensure all the equipment has
Safety Sign  Miscommunication Helm,safety glasses,coverall, been inspected and check by PCI
 Misunderstanding safety shoes) and ready for use
 Failure  Be careful when pick up tools
 Watch body position
 Everyone must pay attention at
3) Connect hose between compressor and all times
blind flange with connector  Stay focused
 Ensure tools ready to use
 Ensure all document for already
accepted and reviewed by PCI
 Proper Safety Sign and barricade
will be install prior execution
2) Mempersiapkan Izin Kerja dan alat-alat  Terbakar  Gunakan PPE standard  Pastikan semua peralatan yang
 Miskomunikasi (Helm,Kacamata, coverall, dipergunakan untuk pekerjaan
 Kesalahpahaman sepatu) sudah lulus inspeksi dan siap
 Terjadi kegagalan untuk digunakan.
 Berhati-hati ketika mengambil
peralatan
 Memperhatikan posisi tubuh
 Setiap orang harus
memperhatikan pekerjaannya
dan lingkungannya setiap waktu
3) Hubungkan selang antara kompresor dan  Tetap focus
blind flange dengan konektor  Memastikan semua peralatan siap
untuk digunakan
 Memastikan semua dokumen
telah disetujui dan ditinjau
kembali oleh pihak PCI
 Tanda Tanda Keselamatan dan
barricade terpasang sebelum
aktivitas dimulai.
4) Line check to ensure air inlet and outlet  Obstruction material or equipment  Use Standard PPE (Safety  Ensure all the air inlet and outlet
has clear Helm,safety glasses,coverall, clear before start
safety shoes)  Protection from tarpaulin to be
install at the outlet of the line for
protect against foreign body
protection
 Quick opening valve to be used for
the operational testing
 Before start or allow the air to
enter to the network, ensure all
valve or outlet connection has
been closed
4) Pemeriksaan sistem untuk memastikan  Material atau peralatan yang Gunakan PPE standard  Pastikan semua jalan masuk dan
saluran masuk dan keluar sudah bersih terjepit (Helm,Kacamata, coverall, keluar udara bersih sebelum
sepatu) dimulai.
 Pasang pelindung dari terpal atau
bahan sejenis untuk melindungi
dari benda benda asing yang
keluar.
 Gunakan valve pada saat
melakukan test
 Sebelum mulai mengisi angin,
pastikan semua valve atau saluran
keluar sudah ditutup.
5) Start Pressurizing with air compressor  High pressure hose bursting  Use Standard PPE (Safety  Only authorized personnel working
carefully as required and continue to  Blind flange loose from flange or Helm ,safety glasses ,coverall, at the work area
open the outlet until the line cleanest. welding safety shoes)  All material and tools shall be
 Hose connection loosing from check during activity.
connector  Ensure that all venting point are
 Flying plug from coupling or other open to avoid entrapped air until
connection the system is fully filled
 Install barricade tape and warning
sign
 Tightening the bolt at blind flange
properly
 No tightening bolt during pressure
test
 Use anti whip check at hose
connection compressor.
 Make sure there is no damage on
plug or welding
 Ensure during pressure test no
other activity inside.
 Visual check shall be made at exit
point to ensure inside of pipe
already cleanest.
 Disconnect all line connection after
job completion and CPY sign report
of test for evidence and
documentation.
5) Menaikkan tekanan secara perlahan  Tekanan selang yang tinggi  Gunakan PPE standard  Hanya pekerja yang sudah
sesuai yang diperlukan dan buka saluran mengakibatkan selang pecah (Helm,Kacamata, coverall, diotorisasi yang bekerja.
keluar perlahan juga.  Sambungan flange atau pengelasan sepatu)  Pastikan semua peralatan yang
lepas dipergunakan untuk pekerjaan
 Sambungan selang lepas sudah lulus inspeksi dan siap
 Plug yang terbang dari coupling untuk digunakan.
atau ada sambungan  Pastikan semua vent point dalam
posisi terbuka untuk mencegah
udara terjebak sampai sytem pipa
terisi penuh.
 Pasang barricade dan rambu
rambu keselamatan.
 Kencangkan baut di blind flange
dengan benar.
 Ketika sudah tekanan dinaikan,
jangan ada pengencangan baut.
 Gunakan anti whip pada
sambungan selang di
compressor.
 Pastikan tidak ada yang bocor
pada flange, sambungan
pengelasan.
 Pastikan tidak ada aktivitas lain
ketika penaikan tekanan
dilakukan.
 Lakukan visual check pada point
keluar untuk memastikan didalam
pipa sudah bersih.
 Lepaskan semua sambungan
setelah selesai kerja dan CPY
menandatangi berita acara atas
pekerjaan yang sudah selesai
dilakukan.

6) Working at Night  Poor illumination  Use Additional Lamp, Use  Ensure Additional lights are
Standard PPE (Safety available
 Injury person
Helm,safety glasses,coverall, • Ensure availability of drinking
 Tripping water
safety shoes), Enough Rest.
 Animal attack Availability Mineral Water • Ensure replacement of shift
workers for night shifts

6) Pekerjan Pada Malam Hari  Penerangan yang buruk  Gunakan Lampu Tambahan,  Pastikan lampu tambahan tersedia
 Orang yang cedera Gunakan PPE standard • Pastikan ketersediaan air minum
 Tersandung (Helm,Kacamata, coverall, • Pastikan penggantian pekerja shift
 Serangan binatang sepatu), istirahat yang cukup, untuk shift malam
Tersedianya Air Mineral
7) Housekeeping  Bad housekeeping  Use Standard PPE (Safety  Ensure housekeeping implemented
Helm,safety glasses,coverall, before and after working hours.
safety shoes)  Ensure waste segregation
according criteria

7) Kebersihan  Housekeeping yang buruk  Gunakan PPE standard  Pastikan housekeeping dilakukan
(Helm,Kacamata, coverall, sebelum dan sesudah jam kerja
sepatu)  Pastikan sampah dipisah sesuai
kriteria
Note : Stop jobs, if found irregularities or changed from the JSA to further discuse with all departments involved.
Catatan : Stop pekerjaan, jika didapati penyimpangan atau perubahan dari JSA untuk di diskusikan lebih lanjut dengan semua departemen yang terlibat.