RIZHLE CONSTRUCTION & DEVELOPMENT CORP.
DESIGNER. PROJECT MANAGER. CONTRACTOR
10632-5221989
Bie [email protected]
SUBCONTRACT AGREEMENT
THIS AGREEMENT, made this 9h day of November, 2020, by and between RIZHLE
CONSTRUCTION AND DEV'T CORP. of Cavite City hereinafter called the Contractor and Mr. Amor
‘Chaver of Block $5 Everlasting St, Brgy. Sta, Ana, Tavtay, Rizal hereinafter called the Subcontractor,
Witnessed, That for the consideration hereinafter named, the said Subcontractor agrees with said
Contractor, as follows:
SECTION |: The Subcontractor agrees to furnish all labor, material, necessary to perform and complete
all the work for Project Description)
[As described in Section 2 hereof, and in accordance with the drawings, General Conditions of the Contract,
Supplementary General Conditions, specifications and submitted Cost Proposal including area and
breakdown, prepared by Mr. Amor Chavez
(2-3-3070
SECTION 2: Scope of Work:
‘The Subcontractor agrees to promptly begin said work a day after RCDC’s notification by said
Contractor, and complete all work as follows: Complete installation of Ceiling frames and board-up works
of Hallway, Toilet & Bath, Foyer and Daily Hauling of Materials & Debris from 14* to 19" floor of Symfoni
‘Kamias 1 Project in accordance with this Agreement, (Work Description)
SECTION 3: The Subcontractor shall take out and pey for Employers’ Liability Insurance and Public
Liability and Property Damage Insurance, certificates of same tobe deposited with the Contractor_before any work
is started; also pay forall state and/or taxes, assessments, Unemployment Compensation Contributions of other
charges, and acquire and pay for necessary permits and/or licenses to do business as required by law.
&
SECTION 4: No eo we a charges changes uel contast wil bo scoped ot pl oe,
unless age ht ating byte RIZHLE CONSTRUCTION AND DEVELOPMENT. CORP. (Conran)
da na ras Chtonnatny afore work ie onset ange made Veil wate Will
‘Sets boned ty ite pay S
SECTION 5: This contract shall not be assigned by the Subcontractor without first obtaining
permission in writing from the Contractor. The Subcontractor shal be responsible for performance of work by
his employees, agenis or his Subcontractors, and the Subcontractor agrees to bind his Subcontractors to al
provisions of this agreement.
SECTION 6: Mr. Amor Chavez (Subcontractor) agrees to be bound by all terms and conditions of
all provisions of the General Conditions of the contract.
Insofar as the provisions of the General Contract do not conflict with specific provisions herein contained,
they, and each of them, are hereby incorporated into this Subcontract as fully as if completely rewritten herein,
“The Mr. Amor Chaver (Subcontractor) agrees to be bound to the RIZHLE CONSTRUCTION AND DEV CORP.
(Contractor) by all terms of the General Contract applicable to this Subcontract, and to assume toward Contractor,
‘with respect to the work and all operations of Subcontractor on this construction project, all the obligations and
responsibilities that Contractor by the General Contract assumes toward Owner, The Subcontractor agrees that
it will so perform this subcontract as not to violate any terms, covenants or conditions of the General
Contract. The relationships of the Subcontractor hereunder toward Contractor shall be the same as that of
Contractor toward the Owner under the General Contract, and the relationship of the Contractor hereunder to
‘the Subcontractor shall be the same as that of the Contractor under the General Contract,SECTION 7: The Subcontractor and Contractor agree to observe and comply with all applicable, local
laws, ordinances, rules, and regulations, including but not limited to the Occupational Safety and Health Act of
2018 / RA 11058 effective where the work under this Subcontract is to be performed,
SECTION 8: The Subcontractor agrees to indemnify and save harmless the Contractor from any and
all loss or damage (including, without limiting the generality of the foregoing, legal fees, and disbursements
paid or incurred by the Contractor to enforce the provisions of this peragraph), occasioned wholly or in part
by any negligent act or omissions of the Subcontractor or that of anyone directly or indirectly employed by
‘them or performing the work of this Subcontract under the ditection of the Subcontractor or anyone for whom
tacts any of them may be liable in carrying out the provisions of the general contract and ofthis Subcontract
regardless of whether or not itis caused in part by @ party indemnified hereunder,
SECTION 9; Special Conditions: (Insert the word “None” OR the Special Conditions.) Note: All Special
Conditions must be INITIALED by both parties.
IN CONSIDERATION WHEREOF, the said Contractor agrees that they will pay to the said Subcontractor, in
Five (5) weekly payments, the sum of Seventy Thousand Pesos (P 60,000.00) for the said labor
only contract, 10 percent (10%) will be deducted as retention fee for every weekly billing on the
labor incorporated by Subcontractor in the work on the job site in an acceptable manner pertaining to
MKCPDCC's Functionality Test approval/s and retention will be released once RCDC obtained TPVDC (TOA) FCO
approval for every floor, Weekly payment which the said Contractor shall pay to the said Subcontractor within
fourteen (14) days after the final acceptance of the Subcontractors work by the Architect-Engineer-
Contractor-Owner (circle which one is applicable) and said Subcontractor shall have submitted satisfactory
evidence that all obligations have been paid, and said Subcontractor has filed all necessary Sales and Use Tax
report forms and any other required documents.
‘The Contractor and the Subcontractor for themselves, their successors, executors, administrators and assigns,
hereby agree to the full performance of the covenants of this agreement,
IN WITNESS WHEREOF, they have executed this agreement the day and date written above.
DATE. SIGNED:
CONTRACTOR: Rizhle Construction and Dev't Corp.
‘Name:_/f
Signature:
SUBCONTRACTK
Name:_Amge Craver
aI 70 BEFORE Bs Mey
Peet 142000 auEzow OFF leet eEEEE
fi THE i
ATTY. JOSE Fi P.CRISOLOGO
Ngtasf Pubic,
‘Until Décéimber 31, 2024
Aam, Maner Mo. NF-023,
goo aw # PTR No, 827 0iIma-C0%-02-2020 0.0,
PAGE NO 1BP Litesime No, LRN03608
: —— Fell No, sda
So NG, = MCLE VI-0017262 Vaio Until 4-14-202%
SPRIES o>