0% found this document useful (0 votes)
238 views

POW NEW Add Mooe

The document contains two program of works proposals from Catalino G. Tampipi Elementary School. The first is for a construction of a pathway and landscaping near the administrative building with a total cost of 11,874 pesos. The second is for improvements to the school's water system, including repiping, with a total cost of 4,540 pesos. Both projects provide itemized lists of materials, labor costs, and totals. They were prepared by the school's facilities coordinator and approved by the division engineer.

Uploaded by

December Cool
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
238 views

POW NEW Add Mooe

The document contains two program of works proposals from Catalino G. Tampipi Elementary School. The first is for a construction of a pathway and landscaping near the administrative building with a total cost of 11,874 pesos. The second is for improvements to the school's water system, including repiping, with a total cost of 4,540 pesos. Both projects provide itemized lists of materials, labor costs, and totals. They were prepared by the school's facilities coordinator and approved by the division engineer.

Uploaded by

December Cool
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Republic of the Philippines

Department of Education
REGION XI
Division of Davao del Sur
Matanao 1 District

PROGRAM OF WORKS
Detailed Estimate

Project: Construction of Pathway/Landscaping (Front of Administrative Bldg.)


School: Catalino G. Tampipi ES
Location: Sinaragan , Matanao, Davao del Sur
Source of Fund: MOOE Additional Amount FY 2020
For the Month of: April & May 2020

ITEM DESCRIPTION UNIT QTY. UNIT COST TOAL COST Grand Rem.
NO. Total
MATERIAL LABOR LABOR
MATERIAL
A. MATERIALS
1. COARSE SAND CU. M. 3 600 1800
2. CEMENT BAG 10 213.70 2137.00
3. CONCRETE HOLLOW PC. 200 10.00 2000.00
BLOCKS
4. ORNAMENTAL AND PAKYA 1,437.00 1437.00
FLOWERING PLANTS W
5. GARDEN SOIL BAG 100 100.00 2,000.00

MATERIAL COST 9,374.00


B. LABOR COST PAKYAW SYSTEM 2,500.0
0
C. TOTAL COST 11,874.00

Prepared by: NOTED BY:

JERSON A. SALE DAHLIA V. RELAMPAGO


School Facilities Coor. ESP 1

Checked and Reviewed by: APPROVED:

JIMMY M. ALCONERA ARIEL D. DUCO


MT 1/Asst. to the Div. Engineer E-III/ Division Engineer
Republic of the Philippines
Department of Education
REGION XI
Division of Davao del Sur
Matanao 1 District

PROGRAM OF WORKS
Detailed Estimate

Project: Repiping/Improvement of Water System


School: Catalino G. Tampipi ES
Location: Sinaragan , Matanao, Davao del Sur
Source of Fund: MOOE Additional Amount FY 2020
For the Month of: July, 2020

ITEM DESCRIPTION UNIT QTY. UNIT COST TOAL COST Grand Rem.
NO. MATERIAL LABOR LABOR Total
MATERIAL
A. MATERIALS
1. P.E Pipe SDR 11 roll 1 2300.00 2300.00
2. P.E. Tee 1/2 pc 2 150.00 300.00
3. Gate valve 1/2 pc 3 250.00 750.00
4. P.E. coupling1/2 Pc. 3 75.00 225.00
5. G.I. nipple 1/2x 3 pc 3 20.00 60.00
6. G.I. faucet Pc. 3 135.00 405.00

MATERIAL COST
B. LABOR COST PAKYAW SYSTEM 500.00
C. TOTAL COST 4,540.00 4,540.00

Prepared by: NOTED BY:

JERSON A. SALE DAHLIA V. RELAMPAGO


School Facilities Coor. ESP 1

Checked and Reviewed by: APPROVED:

JIMMY M. ALCONERA ARIEL D. DUCO


MT 1/Asst. to the Div. Engineer E-III/ Division Engineer

You might also like