New Developments and Applications of Direct Pipe & E-Power Pipe

This document discusses new developments and applications of Direct Pipe® and E-Power Pipe® trenchless technologies. It provides details on several tunneling and pipe jacking projects around the world, highlighting the increasing size and complexity of projects and innovations in equipment and methods to accommodate changing conditions and applications.

Uploaded by

wheyfrappe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
273 views34 pages

New Developments and Applications of Direct Pipe & E-Power Pipe

This document discusses new developments and applications of Direct Pipe® and E-Power Pipe® trenchless technologies. It provides details on several tunneling and pipe jacking projects around the world, highlighting the increasing size and complexity of projects and innovations in equipment and methods to accommodate changing conditions and applications.

Uploaded by

wheyfrappe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 34

New developments and applications of Direct Pipe® &

E-Power Pipe®.
No-dig infra yearly gatherring, Thursday 28th of March 2019

NoDig Infra Konference og Årsmøde 2019 Gl. Avernæs, Sydfyn

Lutz zur Linde


Trends in Pipe Jacking.

Lower overburdens
Higher hydrostatic pressures (inner-city)
(river crossings / outfalls)

Larger
tunnel
profiles

More heterogeneous ground conditions

Herrenknecht. Pioneering Underground Technologies


Tuen Mun – Chek Lap Kok Link, Hong Kong.
The world‘s largest tunnel boring machine.

 Mixshield, Ø17.63m
 2 x 4,2km Road Tunnel

Herrenknecht. Pioneering Underground Technologies


Tuen Mun - Chek Lap Kok Link.
Herrenknecht technology involved.
 2 road tunnels (Traffic Tunnelling)
 3 x Mixshields supplied by Herrenknecht
 S-880 Ø 17.6m, world´s largest TBM
 S-881 Ø 14m
 S-882 Ø 14m
 46 cross passages built by Mini-TBM
 2 x AVN 3000 with special equipment

Herrenknecht. Pioneering Underground Technologies


Tuen Mun - Chek Lap Kok Link.
Cross passage technology.
 M-2001M + M-2003M, 2 x AVN 3000, OD 3605
 46 Cross passages built by Mini-TBM
 Length of cross passages: up to 13m
 Max. confinement pressure: 5,5 bar
 Geology: sand, silt, clay, gravel, granite

Herrenknecht. Pioneering Underground Technologies


Tuen Mun - Chek Lap Kok Link.
Cross passage technology.
 46 CPs finished by Mini-TBM
 Performance: Ø 20 days per CP
 Advance cycle: including
assembly, advance, disassembly
and transport in tunnel

TSA – Tunnel South Approach Subsea Tunnels TNA – Tunnel North Approach

Herrenknecht. Pioneering Underground Technologies


Curved Pipe Jacking.
Rainwater collector.
 M-1909M, AVN2000, OD2425
 Location: Livry-Gargan, France
 Bassin du Rouailler - Rainwater collector
 Drive length: 412m
 Curve drive: radius = 110m
 Total tunnel length: 620m
 Geology: clay
 Contractor: Bessac, Sade

Herrenknecht. Pioneering Underground Technologies


Inclined Pipe Jacking.
Uphill pipe jacked sewage tunnel Bad Liebenzell, Germany.
 M-576M, AVN1200, OD1505.
 Tunnel length: 126m
 Slope: up to 52%
 Geology: cohesive ground, boulders, claystone,
sandstone, quartzite

Herrenknecht. Pioneering Underground Technologies


Long-distance Pipe Jacking.
Altamira Landfall, Sur de Texas – Tuxpan Pipeline.
 M-1275M, AVND2000, OD3200 (Pipe ID 2600)
 Location: Altamira, Mexico
 Tunnel length: 2,246m Sea Outfall
 Geology: sand, silt, clay
 Best daily performance: 25.5 m

Herrenknecht. Pioneering Underground Technologies


AVNS TECHNOLOGY
& E-POWER PIPE

Welcome in Schwanau for

Produkt Launch of AVNS-Technology & E-Power PipeTM


method.

Dr. Marc Peters, Herrenknecht AG, 15. December 2016


Long-distance Pipe Jacking for small diameters.

 Development of AVNS microtunnelling machine (for ID 400 – 1200)


 Drive length: 1,000m – 1,500m
 Special requirement for underground cable installation
 Depth/ low coverage: 1,5m to 4m, constant
 High precision: constant distance between lines 1m – 2m

Herrenknecht. Pioneering Underground Technologies


Direct Pipe®. Small Diameter Trenchless Technology.
Newly-developed Jet Pump.

Mixing Chamber
Venturi Nozzle Mixer

Booster Line Slurry Line

Suction Nozzle

Suction Line

Booster Line – High Pressure


Booster Line – High Flow Speed
Suction Side – Low Pressure

Mixing of Boost Flow & Suction Stream


Build-Up of Slurry Pressure

Herrenknecht. Pioneering Underground Technologies


Underground cable construction.
Steel jacking pipes & coupling system.

Herrenknecht. Pioneering Underground Technologies


E-Power Pipe®
Animation.

14

Herrenknecht. Pioneering Underground Technologies


Underground cable construction.
New E-PowerPipe® push & pull unit.

 Rack & Pinion system


 6 electric drives, total. 66KW
 High performance in both directions: max. 5m/min
 Max. thrust & pull force: 340to
Advantages:
 All couplings of lines and cables in one process step
 Combination of new push & pull unit and new steel pipes:

Reduction coupling times 30min >>> 5 -10min !!!

Herrenknecht. Pioneering Underground Technologies


E-Power Pipe®
Rack and pinion jacking frame: Main parts

Jacking pipe magazine

Frequency converter
Cooling unit

E- motor Carriage

Pressure ring

Front frame Energy chain

Rear frame

Clamping cylinder 16

Herrenknecht. Pioneering Underground Technologies


E-Power Pipe®
Amprion Project in Bacharach: Key facts
 6 drillings of 688 m length each (total: 4.128 m)
 Average coverage of approx. 2 m
 Curve with a radius of 500 m
 Drilling downwards with a height difference of 17 m

Source: Amprion GmbH 17

Herrenknecht. Pioneering Underground Technologies


E-Power Pipe®
Project in Bacharach: Achievements

Best daily Average advance Days per drive


performance m/day rate mm/min [in total: Pilot Bore and
[Pilot Bore] [Pilot Bore]
175 37 pull-in of casing]
144

127 151

108

95
17

12

Bore 1 Bore 2 Bore 3 Bore 1 Bore 2 Bore 3 Bore 1 Bore 2 Bore 3


18

Herrenknecht. Pioneering Underground Technologies


Direct Pipe®. Animation.
Trenchless pipeline crossings and landfalls.

Herrenknecht. Pioneering Underground Technologies


Direct Pipe® Shore approach. Leviathan Gas Field, Israel.
32“ Gas Pipeline with 56” Direct Pipe®.
 M-2246M, AVN1200DP + 2 x HK750PT Pipe Thruster (one standby)
 Location: Dor, Israel
 Drilling length: 1,123m | 3,690ft
 Pipe section length: 60m
 Geology: sands, clays, Kurkar
 Client: Noble Energy
 Contractor: A. Hak Drillcon B.V.
 Best daily performance: 61,8m

Herrenknecht. Pioneering Underground Technologies


Direct Pipe® Shore approach. Leviathan Gas Field, Israel.
32“ Gas Pipeline with 56” Direct Pipe®.

Remote-controlled subsea recovery

Herrenknecht. Pioneering Underground Technologies


World Record Direct Pipe® Project.
48“ Shore Approach with wet recovery.
 M-2170M, AVN1000DP + 1 x HK500PT & 1x HK750PT Pipe Thruster
 Use of Pipeline: Army Bay Wastewater Treatment Plant Outfall Replacement
 Location: Auckland, New Zealand
 Drilling length: 1,930m World Record
 Geology: sandstone, mudstone
 End position reached: August 02, 2018
 Client: Water Care
 Contractor: McConnell Dowell

Performance:
 Best daily performance: 42.5m
 Best monthly performance: 210.7m

Herrenknecht. Pioneering Underground Technologies


Microtunnelling in hard rock.
New AVN800 | OD975.
 For rock with high compressive strengths: up to 200MPa
 High wear-resistance of TCI cutter discs
 Extended drive length: up to 200m
 Torque equal to current machine AVN800B (55kNm)
 Increased rotation speed of cutting head: up to 36rpm @
360l/min

 Compact jacking frame to achieve


a small launch shaft of Ø 3,2m

 Operation by standard control


container C20 possible

 Flushing ring: fine rock particles


to be kept away from annulus

Herrenknecht. Pioneering Underground Technologies


Microtunnelling in hard rock.
New AVN800 | OD975.

Herrenknecht. Pioneering Underground Technologies


Microtunnelling in hard rock.
New AVN800 | OD975.
 Implementation of the requirements
 Machine still fits in the small Ø3,2m round start shaft in combination with
the compact jacking frame and adapted new thrust ring

Herrenknecht. Pioneering Underground Technologies


Direct Pipe®. Small Diameter Trenchless Technology.
New Design from 20” to 36” (up to 42” and 48”).

 Higher RPM for harder ground


 rock capabilities 130-200 MPa (depends on diameter)

 Jet pump integration


 Combination of gyro & walkover guidance system
 Interchangeable power packs (for smaller diameters)

Herrenknecht. Pioneering Underground Technologies


Direct Pipe®. Trenchless Technology.
Operating Range. DP-MTBM DP-MTBM
“classic” “Jet Pump & Rock”

Geology 1
Pipeline Direct Pipe® Drilling
Diameter System Distance 1 Clay Sand Gravel Cobbles Boulders Rock Hardrock
< 2mm <63mm <256mm >256mm <100MPa <200MPa

400 – 500 m__


20“ AVN 400 DP
1,300 – 1,650 ft__
500 – 650 m__
24“ AVN 500 DP
1,650 – 2,150 ft__
600 – 800 m__
28“ AVN 600 DP
1,950 – 2,600 ft__
700 – 900 m__
32“ AVN 700 DP
2,300 – 2,950 ft__
800 – 1,000 m__
36“ AVN 800B DP
2,600 – 3,300 ft__
1,000 – 1,200 m__
42“ AVN 800A DP
3,300 – 3,900 ft__
1,500 – 2,000 m__
48“ AVN 1000 DP
4,900 – 6,550 ft__
1,500 – 2,000 m__
56“ – 60“ AVN 1200 DP
4,900 – 6,550 ft__
onshore only onshore & offshore
1 best case scenario – no distinction between
DP-MTBM “classic” and DP-MTBM “Jet Pump & Rock”

Herrenknecht. Pioneering Underground Technologies


Horizontal Directional Drilling.
Complete HDD system is electrified – one power source
HDD RIG

Mud Transfer Tank


Mud Mixing

Separation Plant

Generators or – directliy MudPit Pump


from the grid / STATTNET
Break Out-Unit

High Pressure Mud Pump

Herrenknecht. Pioneering Underground Technologies


Hybrid HDD Rig.
First use of Hybrid-Rig in France.
 H-348, HK80CK-Hybrid
 Developed for inncer-city operation
 Quiet operation and minimal size ratio
 250m River Crossing, nearby Paris, longtime client HDI

Herrenknecht. Pioneering Underground Technologies


Horizontal Directional Drilling.
HDD is getting electrified

CAT 328 kW Engine  250 kW E-Motor


+ add. small Motor to move Rig

Herrenknecht. Pioneering Underground Technologies


Horizontal Directional Drilling.
HDD is getting electrified

High Pressure
Mud Pumps

Herrenknecht. Pioneering Underground Technologies


Horizontal Directional Drilling.
HDD is getting electrified

Power Packs

Herrenknecht. Pioneering Underground Technologies


PIONEERING
UNDERGROUND
TECHNOLOGIES

 Thank you very much for your attention.

Herrenknecht. Pioneering Underground Technologies


PIONEERING
UNDERGROUND
TOGETHER

THE FUTURE IS UNDERGROUND.

Herrenknecht. Pioneering Underground Technologies