This document is a bidding proposal sheet for package II of rate contract projects for OPTCL in 2011-12. It contains rates to be quoted for conducting surveys, soil investigations, preliminary designs, cost estimates, and detailed project reports for upcoming transmission line and substation projects. Services include route alignment surveys, tower schedules, soil boring up to 30 meters depth, preliminary foundation designs, single line diagrams, cost estimates, and detailed project reports per kilometer of transmission line or per substation.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
175 views
Bidding Proposal Sheet For Package-Ii
This document is a bidding proposal sheet for package II of rate contract projects for OPTCL in 2011-12. It contains rates to be quoted for conducting surveys, soil investigations, preliminary designs, cost estimates, and detailed project reports for upcoming transmission line and substation projects. Services include route alignment surveys, tower schedules, soil boring up to 30 meters depth, preliminary foundation designs, single line diagrams, cost estimates, and detailed project reports per kilometer of transmission line or per substation.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1
BIDDING PROPOSAL SHEET FOR PACKAGE- II
RATE CONTRACT YEAR 2011-12
PREPARATION OF ESTIMATE & DETAILED PROJECT REPORT FOR UPCOMING PROJECTS OF OPTCL
ITEM DESCRIPTION UNIT RATE TO BE QUOTED IN
NO INDIAN RUPEES FOR EXECUTION OF WORK ANNEXURE – I, TRANSMISSION LINE 1 Conduct preliminary survey for the proposed line, prepare route alignment for three alternate routes Per Km 2 Conduct detailed survey of the approved route, prepare tower profile plotting, tower schedule and land schedule for the approved route. Per Km 3 Soil investigation per location of transmission line as per specification. i) Normal foundation(boring up to 3.0m, 5.0m, 7.0m depth) Per Loc. ii) under ream plie foundation( boring to 15.0m depth) Per Loc. Iii) river bed pile foundation( boring to 30.0m depth) Per Loc. 4 Preliminary design of the line foundation ot determine the detailed Bill of Quantity(BOQ) for the line i) 132kV SC / DC line Per Km ii) 220kV SC / DC line Per Km Iii) 400kV SC / DC line Per Km 5 Preparation of the cost estimate of the Transmission line project. Per EHT line
Preparation of Detailed project report for transmission line
6 project as per technical specification Per EHT line ANNEXURE - II. SUBSTATION 1 Contour route survey of the substation land, propose the finished level of substation, determine cutting and filling required for land development. 2 Soil investigation Per location i) Normal foundation(boring up to 3.0m, 5.0m, 7.0m depth) Per Loc. ii) under ream plie foundation( boring to 15.0m depth) Per Loc. Iii) river bed pile foundation( boring to 30.0m depth) Per Loc. 3 Finalise provision to be made in the substation in consultation with OPTCL, Preparation of Single line diagram, Layout plan, elevation, preliminary design of the substation to determine the Bill of Quantity(BOQ) for the substation. Per Substation 4 Preparation of the cost estimate of the substation project. Per Substation Preparation of Detailed project report for substation project 5 as per technical specification Per Substation
Sustainability in the Hospitality Industry Principles of Sustainable Operations 4th Edition Willy Legrand - Quickly download the ebook in PDF format for unlimited reading