MST-120A: Fiber Optic Multiplexer Installation and Operation Manual

The document provides an installation and operation manual for the MST-120A Fiber Optic Multiplexer. It includes sections on unpacking and examining the equipment, installation, indicator lights and interfaces, testing and maintenance procedures, technical specifications, safety precautions, and appendices with wiring diagrams. The manual guides the user on properly setting up and using the multiplexer to transmit fiber optic and electrical signals.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
561 views26 pages

MST-120A: Fiber Optic Multiplexer Installation and Operation Manual

The document provides an installation and operation manual for the MST-120A Fiber Optic Multiplexer. It includes sections on unpacking and examining the equipment, installation, indicator lights and interfaces, testing and maintenance procedures, technical specifications, safety precautions, and appendices with wiring diagrams. The manual guides the user on properly setting up and using the multiplexer to transmit fiber optic and electrical signals.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 26

MST-120A

Fiber Optic Multiplexer

Installation and Operation Manual

Version: v1.1
MST-120A Installation and Operation Manual

Limitation of Warranty
The foregoing warranty shall not apply to defects resulting from improper or inadequate maintenance
by Buyer, Buyer-supplied firmware or interfacing, unauthorized modification or misuse, operation
outside of the environmental specifications for the product, or improper site preparation or
maintenance.

General Safety Precautions


Transportation, Installation and Operation
Avoid excessive vibration and shocks.
Avoid contact with water, dust, and dirt.
Avoid excessive direct sunlight.
Ensure sufficient cooling.
Prevent loose items from falling into the device.
Main Powers
Disconnect the power cord before opening the device.
Use exclusively the supplied power supply the approved power cord.
The power plug must be plugged into a properly grounded receptacle. An improperly wired
receptacle could place hazardous voltage on accessible metal parts of the device.
The mains supply must match the power specification of the device.
Replace blown fuses exclusively with fuses of the same ratings.
Do not work on the equipment during periods of lightning activity.

Technical Support
Before contacting with your support representative, please prepare to provide the complete serial
number of the affected unit (refer to the according unit label).

Version Number
DATE Ver Describe
2005-8-25 V1.0 Issuance of The Manual
2009-3-1 V.1.1 Modified

Beijing Easy Broadband Technology Co.,Ltd.


www.ebbnetwork.com Page 2 of 26
MST-120A Installation and Operation Manual

Content
1 OUTLINE ............................................................................................................................5
2 FEATURES ..........................................................................................................................6
3 EQUIPMENT PRINCIPLE ......................................................................................................6
4 INSTALLATION ...................................................................................................................7
4.1 Unpacking ..............................................................................................................7
4.2 Equipment Examination.........................................................................................8
4.3 Equipment installation ...........................................................................................8
4.4 Equipment Test ......................................................................................................8
5 INDICATOR AND INTERFACE ...............................................................................................9
6 TEST FOR MAINTENANCE ................................................................................................14
7 DATA EXCHANGE CHANNEL OF E1/V.35..........................................................................16
8 PROTECTION AND REPLACEMENT NORM FOR DUAL OPTICAL PATH................................16
8.1 Replacement Mechanism .....................................................................................16
8.2 Reset Mechanism .................................................................................................17
8.3 Network Management Function...........................................................................17
9 SOLUTION TO COMMON MALFUNCTION ..........................................................................17
10 TECHNICAL SPECIFICATIONS ...........................................................................................18
10.1 E1 .........................................................................................................................18
10.2 Optical Interface Feature:.....................................................................................19
10.3 V.35 Feature .........................................................................................................19
10.4 Management Port and Extended Series Port Feature ...........................................22
10.5 Orderwire .............................................................................................................22
10.6 Power Supply .......................................................................................................23
10.7 Operation Environment........................................................................................23
10.8 Size of Figure .......................................................................................................23
11 PRODUCT APPLICATION ...................................................................................................24
12 APPENDIX ........................................................................................................................25
1) The way of Making Joining Line for Management Port ..............................................25
2) Making Cable for E1....................................................................................................25
3) The Connecting Way of Direction Current ..................................................................26

Beijing Easy Broadband Technology Co.,Ltd.


www.ebbnetwork.com Page 3 of 26
MST-120A Installation and Operation Manual

INSTRUCTION FOR SAFTY USE


MST120A SERIES OPTICAL MODEM WITHIN THE SCOPE OF DESIGN AND USE ARE
CHARACTERIZED BY WELL-RELIABLE FUNCTION, HOWEVER, WHICH SHOULD BE
AVOIDED DAMAGING AND DESTORYING OPTICAL MODEM THROUGH HUMAN
ACTIVITY.
TO READ THROUGH THE MANUAL CAREFULLY AND PREVERSE THE MANUAL WELL TO
GIVE A GUIDE AND HELP IN THE FUTURE;
TO PREVENT THE EQUIPMENT FROM CLOSE TO WATER OR WET GND;
TO BAN FROM LAYING ANY THINGS ON POWER OR CABLE OR MAKING THE CABLE
TYING OR COVERING ,AND THEN LAY DOWN THE PLACE BEING NOT VULNERABLE TO
TOUCH;
POWER PLUG AND OTHER EQUIPMENT JOINT PARTS OUGHT TO CONNECT STABLY
EACH OTHER AND KEEP REGULAR EXAMINATION.
TO BE SURE TO TAKE CAREFULLY TO CONNECT THE LINES UNDER THE MARK OF
CONNECTING POLE WHEN THE POWER LINE IS LINKED . THE USING POWER MUST BE
COMPLY WITH THE BELOW PRINCIPLES:
1. DIRECT CURRENT -48V TYPE: -36 ---- -72V
2.ALTERNATING CURRENT 220V TYPE: 220V±20%,50 HZ
TO KEEP PAYING ATTENTION TO CLEARITY EQUIPMENT AND MAY USE
SOFT-AND-COTTON CLOTH TO BRUSH AT NECESSARY TIME;

AVOID WALLING UP INTAKE;

In these cases, please turn off the power immediately and timely keep in touch with our company:

1. Water invades equipment.

2. Equipment with damage or the damage of shell;

3. Equipment with working failure function or the quality for show with complete change;

4. Equipment to come out scent, smoke or noise.

Please don’t to fix equipment in personal, unless with the exception of definite indication in manual.

Beijing Easy Broadband Technology Co.,Ltd.


www.ebbnetwork.com Page 4 of 26
MST-120A Installation and Operation Manual

1 Outline
MST120A series Optical modem is a series of optical and electrical transmission equipment
manufactured by Beijing Easy Broadband Technology Co., Ltd. With the ASIC as its core, it
supports mutilple E1 and 1-2 n×64k V.35 channel, support dual optical port provide 1+1 service
protection, very suitable for small-capacity switch networking, user loop network, mobile
communications (base station), private network, DDN, etc.

MST120A comprises of 120 mixed optical and electric lines with VLSIC as its core. Its E1 and V35
channel provide integrated BERT(Bit Error Rate Test)for user testing and maintenance.
In addition, MST120A series of optical modem can also provide rack mount for easy maintenance,
plug and play, and provide complete network management.

TYPE Optical Basic service Additional Orderwire Management Dimension

MST120A 1 4×E1 1×RS232 YES YES 19”×1U

MST120MA 1 4×E1 1×RS232 YES YES Desktop Mini

MST120AV1 1 4×E1+1×V.35 1×RS232 YES YES 19”×1U

MST120AV2 1 4×E1+2×V.35 1×RS232 YES YES 19”×1U

KMST120A 1 4×E1 1×RS232 YES YES Card

MST120A-D 2 4×E1 1×RS232 YES YES 19”×1U

MST120AV1-D 2 4×E+1×V.35 1×RS232 YES YES 19”×1U

MST120AV2-D 2 4×E1+2×V.35 1×RS232 YES YES 19”×1U

KMST120A-D 2 4×E1 1×RS232 YES YES Card

Beijing Easy Broadband Technology Co.,Ltd.


www.ebbnetwork.com Page 5 of 26
MST-120A Installation and Operation Manual

2 Features
 Provide 4 E1 digital ports, 75Ω~120Ω impedance options;
 E1 & V35 channel support BERT(Bit Error Rate Test)
 Provide an order line port;
 Provide a RS232 asynchronous data port;
 Provide a management port for centralized monitoring and supporting system upgrade;
 Provide a set of control switch for device testing and maintenance;
 Based on ASIC, simple circuit, low power consumption and high reliability;
 Being suitable for multiple power environment –48VDC or 220VAC;
 Standard 1U rack with the characteristics of small size, light height, high reliability and
easy for installation;
 MST120A-D、MST120AV1/2-D provide dual optical port to reach 1+1 service protection;
 MST120AV1/2(-D) provide 4*E1 and 1-2 n×64k V.35 channel
 Support channel switch of E1 and V.35
 V.35 support 7 clock mode (DCE: location, restoration, external input; DTE: send RC
receive TC, send RC receive RC, send TC receive TC, send TC receive RC) is suitable for
all V.35 request for port clock mode on the market at present;
 V.35 port clock mode, phase, optional function for time slot and E1/V.35 exchange
function for data channel can have access to Network Software Arrangement;
 MST120A and MST120A-D can provide centralized shelf cards structure.

3 Equipment Principle
2048Kb/s (E1) data signal is conveyed to transmission equipment, which type of code is HDB3 code.
After uni-polar and bi-polar change, HDB3 code becomes bipolar code. Then special integrated chip
pick up clock, decode the signal code through adjustment of code and multiplex to code of driving
optical signal.

Beijing Easy Broadband Technology Co.,Ltd.


www.ebbnetwork.com Page 6 of 26
MST-120A Installation and Operation Manual

Figure 3.1 Principle Frame

Received optical signal into optical receiver through balanced amplification and NRZ signal of
circuit and transmitting special integrated chip to draw clock and decode. Through code rate resetting
circuit and lock phase loop with inner figure restore and become 2.048Mb/s. Then by the output
driving circuit send out HDB3 Signal conforming to its request.

4 Installation

4.1 Unpacking
1) After making sure installing location of the optical modem and make clear
of the place, you will transfer the box with optical modem to installing
location;
2) Please pay attention to direction of box and make sure its front upward;
3) Opening up box, then take out equipment and accessories.

Beijing Easy Broadband Technology Co.,Ltd.


www.ebbnetwork.com Page 7 of 26
MST-120A Installation and Operation Manual

4.2 Equipment Examination


To check whether or not the optical modem is perfect and out of use and the
condition of power.

4.3 Equipment installation


1) Taking out the equipment and checking outlook, then fixing on the frame or another
equipment to ensure the sound installation;
2) Making choice of power (AC220V or DC-48) based upon the structure of equipment,
which abides by the connection of line of power correctly. To test whether or not the
power is well function through electricity. Indicator light is on (POWER, GREEN)
with proper work; Whether or not working condition is well-function or System
working dictator light flashes (RUN, GREEN); Without connecting fiber, optical
module system working indicator light (WORK, GREEN) is off but optical
synchronization loss indicator light (SYLOS, RED) is on;
3) Connecting with remote equipment linking to fiber, optical module indicator light
under the proper working condition (WORK, GREEN) is on and optical
synchronization loss indicator light (SYLOS, RED) is off; Provided in the case of
working improperly, relative staff need to check whether or not light channel is
working properly and fiber at the bottom have the sound function for sending and
receiving and remote equipment is electrified; Connecting with fiber with dual optical
channel and 1+1 working indicator light of optical channel (SAT ,YELLOW) under
defaulting condition is off indicates working channel is 0 in optical channel; Being on ,
indicates working channel is 1 in optical channel and can make stimulating optical
channel of optical fiber observe optical protection switch and STA indicator light.
4) Connecting with signal line— E1, if users’equipment have worked properly, signal E1
(LLOS, RED) related to light is off. The way of making E1‘s joining lines refer to
appendix.
4.4 Equipment Test
1) Power: To make sure to connect power line in connection, to switch on power switch.
If the power indicator light (POWER, GREEN) is on, it shows power is working
properly;
2) Equipment Operation: having been electrified, equipment enters into operation. When
system working indicator light (RUN, GREEN) is flashing, it indicates proper
operation for equipment;
3) Optical Interface: When equipment works properly, fiber at the bottom will put optical
interface loopback and optical module working indicator light (WOEK, GREEN) is on.
If optical synchronization loss indicator light (SYLOS, RED) is off, it indicates the
optical interface is perfect;
4) Optical Interface Switch: When equipment is working properly, optical path 1+1
Beijing Easy Broadband Technology Co.,Ltd.
www.ebbnetwork.com Page 8 of 26
MST-120A Installation and Operation Manual

working indicator light (STA, YELLOW) is off, which indicates that working channel
is 0 in the optical channel (tacitly accepted working channel). If taking out link0 with
fiber in optical interface, stimulating optical path will result in failure. Then optical
path 1+1 working indictor light (SAT, YELLOW) is on, indicating the service have
been switched to channel one.
5) E1, V35 Interface: When equipment operates properly, technological staff will optical
loop automatically and use error code instrument to test error code. If nothing, it is
perfect;
6) RS232 Interface: When equipment operates properly, technological staff will loop
optical interface automatically and connect RS232 interface with PC’ s series interface.
“Super Terminal”(baud rate is 9600bit/s) operates on PC, which prevents from
re-showing option of local character. Then keying into testing character and displaying
character that is received in windows. It is the same with inserted character to indicate
that RS232 interface is working properly.

5 Indicator and Interface


Optical modem with series of MST120A provides integrated warning direction and condition
direction. Red light shows serious warning and system cannot work properly; Green light
shows the existence of warning and system works well basically; Green light shows system is
working perfectly. Specific definition to equipment with each model between its front and back
and direction light is as follow:

Fiugre5.1 MST120A front

Fiugre5.2 MST120A back

Beijing Easy Broadband Technology Co.,Ltd.


www.ebbnetwork.com Page 9 of 26
MST-120A Installation and Operation Manual

Fiugre5.3 MST120AV1 front

Fiugre5.4 MST120AV1 back

Fiugre5.5 MST120AV2 front

Fiugre5.6 MST120AV2 back

Fiugre5.7 MST120A -D front

Fiugre5.8 MST120A-D back

Fiugre5.9 MST120AV1-D front

Beijing Easy Broadband Technology Co.,Ltd.


www.ebbnetwork.com Page 10 of 26
MST-120A Installation and Operation Manual

Fiugre5.10 MST120AV1-D back

Fiugre5.11 MST120AV2-D front

Fiugre5.12 MST120AV2-D back

Fiugre5.13 MST120MA front

Fiugre5.14 MST120MA back

Indicators

Definition Sound operation loopback BERT


Beijing Easy Broadband Technology Co.,Ltd.
www.ebbnetwork.com Page 11 of 26
MST-120A Installation and Operation Manual

RUN、Green Sound operation; under the condition of


dipswitch, on (on 1/4 second + off 3/4
seconds, then cycle); under the condition
of network management, off (on 3/4
seconds + 1/4 second, then cycle)
STA、Yellow If under the model of dual optical If condition of
interface, operation is off on the main non-synchronization
optical interface meanwhile operation is flashes, condition of
on the spare optical interface; The model synchronization with
of single optical interface is off usually. non-error code is off and
error code <10-3 on, error
code>10-3 flashes, keeping
the same step with the
condition of the most
serious error code.
SYLOS/1E-3 、 Optical interface data is off naturally.
RED Optical synchronization loss or 10-3 error
code is on.
1E-6、YELLOW Optical interface data is off naturally.10-6
error code is on.
WORK 、 Optical take-over power is on when
GREEN performed well or it is off.
RA、YELLOW If remote optical loss or
synchronization loss, warning is on,
remote call (press down the switch
of CALL) is on.
LLOS(1~4) 、 Local interface related to E1 that has a When Flash show it received
RED connection is off. Without connection, it E1 has testing code for local E1
is on. loopback, port.
RLOS(1~4) 、 Remote interface related to E1 that has a Flash show the
RED connection is off. Without connection, it transmission of testing
is on. code for local E1 port.
FSL、RED V.35is is working for the way of framed
E1. And 2M data’ s frame synchronization
loss.
TD、GREEN When V.35 is sent (optical direction), its
result comes out the changing flash.
RD、GREEN After V.35 data is received from optical
interface ,its result come out the changing
flash.
Beijing Easy Broadband Technology Co.,Ltd.
www.ebbnetwork.com Page 12 of 26
MST-120A Installation and Operation Manual

ULK 、 The send of V35 and the set of clock Flash Flash show the
YELLOW model don’t come out the signal. transmission of testing
code for local port.
 Orderwire(HANDSET) Interface: relative staff will insert special handset of orderwire into

interface then and communicate through the orderwire; When staff press down the CALL

button of local port , remote interface set will come out buzz ,which indicates the other side

may communicate;

 Buzzing Warning: When optical loss-that is- optical synchronization loss

indicator light (SYLOS, RED) is on, system provide serious warning and
buzzer of equipment begins to sound; At this time staff press the button of
CALL, which shut down the buzz.; If staff press the button of CALL again , the
buzz will sound once again;
 Management Interface(CONSOLE): it connects with main computer, which result in the

recognition of function of management;

 E1 interface locates the back side of equiment;

 Dip switch:

1 2 3 4 5 6 7 8
OFF
ON
Figure 5.7 definition of dip switch

Dip Switch1、2: to maintain the option of testing model(OFF=1、ON=0);


00=engineering BERT test;
01=the loopback of remote equipment and to control remote equipment E1、V35
interface to switch to loopback of counter-direction and the max time of
loopback is limited to an hour;
10=company preservation;
11=normal model;
Dip Switch 3、4、5、6、7、8: to maintain option of test channel
corresponding to E1 interface 1、2、3、4、V35 interface 1、2

OFF=normal , ON=maintain test model;

Beijing Easy Broadband Technology Co.,Ltd.


www.ebbnetwork.com Page 13 of 26
MST-120A Installation and Operation Manual

Dip switch setting of ex-factory all are “OFF”. Having been finished maintaining

and checking, staff should place dipswitch in the place of ex-factory.

6 Test for Maintenance

MST120 series of Optical modem support test for maintenance by network


management or dipswitch with loopback, BERT and so on.

Controlling Way of Maintaining Test

 Equipment with ex-factory is under the condition of default. Under the condition,

switch of dip switch is available.

 The equipment is characterized by the choice of between “maintain operation

controlled by switch of dip switch ”or “maintain operation controlled by network

management” and it possesses the function of protection when cut down

electricity.

 “Maintaining operation controlled by network management” must be setted in

advanced to make test for maintenance through network management.

 To operate the clear out cut-off electricity is through maintenance to network

setting.

 BERT Test Principle

The inner of equipment is laid simple error code instrument that may through dip switch or

inner error code instrument to reach data channel of receive and send. Panel indicator light

3 3
may direct the synchronous condition , the class of error code (non-error code , < 10 、> 10 ).

And network management may memory time of coming out error code and the number of error

code. BERT need loopback of E1 interface, local E1 in series and other assisted way, etc.

Beijing Easy Broadband Technology Co.,Ltd.


www.ebbnetwork.com Page 14 of 26
MST-120A Installation and Operation Manual

Measuring Method for BERT in Project

Project detect is designed for transferring and receiving the data in regular condition. Take
the first E1channel for example. The process of detect is as follow:

To connect optical fiber rightly and ensure the proper operation of transmitting and
receiving data in two-side equipment;

To set remote equipment corresponding with E1 interface toward optical interface direction
to loopback, the switch of dip switch move from

To make sure the start of loopback by indicator light— RLOS-1 in local interface is off;

To set channel EERT of local interface E1, the switch of dip switch move from

to
;

Beijing Easy Broadband Technology Co.,Ltd.


www.ebbnetwork.com Page 15 of 26
MST-120A Installation and Operation Manual

7 Data Exchange Channel of E1/V.35

 MST120AV1-D/MST120AV2-D、MST120AV1/MST120AV2 support data channel optional


exchange of E1/V.35 so that V.35 channel is easily corresponding to E1channel of remote
equipment. (Our company ‘s other 4E1, 8E1 optical transfer equipment);
 Network management may choose V.35 data, which take up original channel model or
choose regular E1 channel model to reach data channel exchange of E1/V.35

MST120AV1、MST120AV1-D
 channel exchange(default <ex-factory>)
CH1 CH2 CH3 CH4 CH5
E1 ch1 E1 ch2 E1 ch3 V35 E1 ch4
 take up original channel
CH1 CH2 CH3 CH4 CH5
E1 ch1 E1 ch2 E1 ch3 E1 ch4 V35

MST120AV2、MST120AV2-D
 channel exchange(default<ex-factory>)
CH1 CH2 CH3 CH4 CH5 CH6
E1 ch1 E1 ch2 V35ch2 V35ch1 E1 ch4 E1 ch3
 take up original channel
CH1 CH2 CH3 CH4 CH5 CH6
E1 ch1 E1 ch2 E1 ch3 E1 ch4 V35ch1 V35ch2

8 Protection and Replacement Norm for Dual Optical Path


Optical transmission equipment with dual port can realize H1 service protection. Protection for

operation mechanism is divided into two parts –replacement and reset. The former one is that

working channel is switched to spare channel when working channel happens to malfunction;

The latter one is that spare channel is switched to original working channel because of

replacement and solution to malfunction of original working channel.

8.1 Replacement Mechanism

Taking the mechanism of dual send and sound receive is that send port will be sent

simultaneously in the same service in two optical fiber; Main channel based upon fixed

(ex-factory---default is 0.) when send port is normal. When main channel happens to
Beijing Easy Broadband Technology Co.,Ltd.
www.ebbnetwork.com Page 16 of 26
MST-120A Installation and Operation Manual

malfunction and spare channel is normal, the main channel within 50ms can switch to spare

channel to receive data and give out warning for network management.

Malfunction of Optical Channel Include:

Optical signal disappear;

Frame with malfunction loss;

Channel error code surpass the limitation;

8.2 Reset Mechanism

Network management can configure can decide whether or not to reset and reset wait

time after reset. Main channel may be on-and-off phenomenon in the course of

malfunction rewetted. Please refer to SDH technological standard. Resetting wait time is

5-12 minuets in usual condition.

8.3 Network Management Function

Network management may decide working channel and protection channel;

Network management may compulsorily switch to certain channel;

Network management may set after replacement whether or not to reset wait time;

9 Solution to Common Malfunction

a) Optical Lost Warning:

optical synchronization loss indicator light (SYLOS, RED) is on to check connection

optical fiber with optical modem, whether or not, is perfect;

Whether or not optical fiber with receives and send is connected each other in the opposite

direction;

To check optical interface of equipment, whether or not , is well-function;

To check whether or not optical link is good to test optical receive power.

b) E1 Warning

Beijing Easy Broadband Technology Co.,Ltd.


www.ebbnetwork.com Page 17 of 26
MST-120A Installation and Operation Manual

LLOS is warning light for local port E1.

RLOS is warning light for remote E1 port.

When LLOS light is on, relative staff should check joining line of E1 local interface to

connect availably or not, examine quality and extension of joining line and test

operation of all users is well-function or not;

When RLOS light is on, relative staff should check joining line of E1 remote interface

to connect availably or not, examine quality and extension of joining line and test

operation of all users is well-function or not;

c) Remote Interface Warning

If remote interface does not call local interface, local interface RA light is on, which

indicates the remote interface optical receive signal or synchronization loss with the

remote interface. Relative staff should check send optical signal with local interface and

receive optical signal with remote interface and optical link.

d) The High Rate of Error Code

To check interface impedance is set rightly or not. If interface impedance is right,

relative staff examine segment by segment through error code instrument,


taking removing way to check the cause of malfunction coming from local
optical path or the equipment itself.

10 Technical Specifications
10.1 E1

 Line rate: 2048Kbps,±50ppm


 Line code: HDB3
 Impedance: 75Ω (unbalanced) or 120Ω (balanced)
 Jitter transfer function: ITU-T G.823
 Input jitter tolerance: ITU-T G.823
 Output jitter: ITU-T G.823
 Level: ±2.37V±10% or ±3.00V±10%
 Interface connector: RJ45, CC4 coaxial or BNC coaxial
 E1 local Loopback: Per channel
Beijing Easy Broadband Technology Co.,Ltd.
www.ebbnetwork.com Page 18 of 26
MST-120A Installation and Operation Manual

 Remote Loopback: Per channel

Figure 8.1 line code


10.2 Optical Interface Feature:

o Output Power:-3dBm~-8dBm
o Receiving Sensitivity: -33dBm~- 40dBm
o Fiber Interface: dual SC/ dual FC/single SC;
o Applicable Fiber: single mode, multi-mode optical;

Definition of Optical Interface:

TX RX
Figure8.2 Definition of Optical Interface

10.3 V.35 Feature

o Port rate: n×64K;


o Without traffic control, transparent transmission;
o Connector: DB25 slot;
o DCE or DTE optional;

Definition of V.35 Port(DCE Mode: E1 Main Clock/E1 Subordinate Clock/V.35 Exterior



Clock)

Beijing Easy Broadband Technology Co.,Ltd.


www.ebbnetwork.com Page 19 of 26
MST-120A Installation and Operation Manual

Pin M/34 I/O Definition Function


1 A GND Signal GND
2 P I TDA Transmit data line A
3 R O RDA Receive data line A
4 C I RTS Transmit requestment
5 D O CTS Transmit permission
Prepared data
6 E O DSR
equipment
7 B GND Protection GND
8 F O DCD Data carrier detect
9 X O RCPB Receive clock line B
10 I Reserved
11 W I ETCB Exterior clock line B
12 AA O TCPB Transmit clock line B
13 NC
14 S I TDB Transmit data line B
15 Y O TCPA Transmit clock line A
16 T O RDB Transmit data line B
17 V O RCPA Receive clock line A
18 NC
19 NC
20 H I DTR Data transport ready
21 NC
22 NC
23 I Reserved
24 U I ETCA Exterior clock line A
25 NC

Beijing Easy Broadband Technology Co.,Ltd.


www.ebbnetwork.com Page 20 of 26
MST-120A Installation and Operation Manual


Definition of V.35 Port(DTE Mode)

pin F/34 I/O Definition Function


1 A GND Signal grand
2 R I RDA Receive data line A
3 P O TDA Transmit data line A
4 D I CTS Transmit permission
5 C O RTS Transmit requestment
6 H O DTR Data transport ready
7 B GND Protection GND
8 O Reserved
9 W O ETCB Exterior clock line B
10 AA I TCPB Transmit clock line B
11 X I RCPB Receive clock line B
12 O Reserved
13 NC
14 T I RDB Receive data line B
15 O Reserved
16 S O TDB Transmit data line B
17 U O ETCA
18 NC
19 NC
20 E I DSR
21 NC
22 NC
23 Y I TCPA Transmit clock line A
24 V I RCPA Receive clock line A
25 NC

Beijing Easy Broadband Technology Co.,Ltd.


www.ebbnetwork.com Page 21 of 26
MST-120A Installation and Operation Manual

10.4 Management Port and Extended Series Port Feature

o Interface: RS232 port;


o Connector: RJ45 slot;
o Date rate: 57600bps;
o Extension port: Up to 19200bps.

Management Port Re-232:

Figure8.3 Management Port RE-232Port

Extended Series Port: 1234 5 678

RTS
CD CTS
DTR
GND TX RX
Fingure8.4 Extended Series Port

10.5 Orderwire

Connector: RJ11
Definition of orderwire Port:

TX RX TX RX
Beijing Easy Broadband Technology Co.,Ltd.
www.ebbnetwork.com Page 22 of 26
MST-120A Installation and Operation Manual

Figure8.5 Orderwire Port

10.6 Power Supply

o DC voltage: -48VDC: -36V~-72V


o Power supply ripple: ≤240mVp-p
o AC voltage: 220VAC±15% 50Hz
o Power consumption: ≤10W

10.7 Operation Environment

o Environment Temperature:0℃~45℃;
o ;
Relative Moisture:≤90%(35℃)
o Atmospheric Pressure:86~106Kpa.

10.8 Size of Figure

o 483×175×45 mm

Beijing Easy Broadband Technology Co.,Ltd.


www.ebbnetwork.com Page 23 of 26
MST-120A Installation and Operation Manual

11 Product Application

Optical modem with MST120A-D/MST120AV1-D/MST120AV2-D may carry any E1 signal


transmission service and provide 1+1 protection service through optical fiber. Typical application
example show as follow (Figure 11.1):

Figure 11.1 MST120A-D/MST120AV1-D/MST120AV2-D Applications

Optical modem with MST120A/MST120AV1/MST120AV2 may carry any E1 signal


transmission service through optical fiber. Typical application example show as follow (Figure 9.2):

Figure9.2 MST120A/MST120AV1/MST120AV2 Application

Beijing Easy Broadband Technology Co.,Ltd.


www.ebbnetwork.com Page 24 of 26
MST-120A Installation and Operation Manual

12 Appendix
1) The way of Making Joining Line for Management Port
Management port take combination of between RS232 interface and PC series port , only connecting
RXD,TXD,GND of three lines ,etc. Specification figure is as follow:

5
Management 2 PC port
PC
Port RJ45 3 DB9

Attached figure 1: joining line of management port

2) Making Cable for E1


E1 interface impedance of optical modem with series of MST120 support 75Ω/120Ω
(user optional). When users choose 75Ω, plug is BNC (Q9) coaxial. So interface joining line
conform to the request of Q9 coaxial cable of coaxial connector. The figure is as follow.

Q9 coaxial connector 75Ωcoaxial cable Remote coaxial connector

Attached figure 2: E1 cable

Above all kind of joining line request for using special tools before making, doing regular test
for quality and extension after making.
Beijing Easy Broadband Technology Co.,Ltd.
www.ebbnetwork.com Page 25 of 26
MST-120A Installation and Operation Manual

3) The Connecting Way of Direction Current


Panel power at the back of DC Supply Equipment shows as follow:

Attached figure 3: back panel power

For DC-48V, -Vin connects –48V, +Vin connect power.


Because of the connector on the equipment shell, installing staff should under the request of
installation that connect with GND.

Beijing Easy Broadband Technology Co.,Ltd.


www.ebbnetwork.com Page 26 of 26