Pile Cap Design: Salient Features

This document provides the design details for a pile cap, including its dimensions, pile arrangement and spacing, levels, and material properties. The pile cap is 5.2m long, 1.8m thick, and supports 8 piles arranged in 4 rows with 2 columns spaced 3.6m apart. The cap is 24.5m above normal scour level and supports a pier/abutment 2.4m by 8.4m that is offset 0.55m from the cap's centerline. Reinforcement grade is Fe-500 and concrete grade is M-35.

Uploaded by

Debanjan Majhi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
345 views

Pile Cap Design: Salient Features

This document provides the design details for a pile cap, including its dimensions, pile arrangement and spacing, levels, and material properties. The pile cap is 5.2m long, 1.8m thick, and supports 8 piles arranged in 4 rows with 2 columns spaced 3.6m apart. The cap is 24.5m above normal scour level and supports a pier/abutment 2.4m by 8.4m that is offset 0.55m from the cap's centerline. Reinforcement grade is Fe-500 and concrete grade is M-35.

Uploaded by

Debanjan Majhi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

PILE CAP DESIGN

Salient features:

Length of Pile Cap Along the Longitudinal direction = 5.20 m


Length of Pile Cap Along the Transverse direction = 12.30 m
Thickness of Pile Cap = 1.80 m
Diameter of Pile = 1.20 m
Pile Arrangement
(A) Nos. of Rows: = 4.00 Nos.
(B) Nos. of Column: = 2.00 Nos.
Spacing of Row of Pile = 3.60 m
Spacing of Column of Pile = 3.60 m
Distance of edge of pile cap to the center of end pile = 0.75 m
Nos. of Pile = 8.00 Nos.

Salient dimentions:

Effective length of Pier/Abutment along the traffic direction = 2.40 m


Effective length of Pier/Abutment across the traffic direction = 8.40 m
Distance of C/L of Pier/Abutment to the C/L of Pile Cap (Long Direction) = 0.55 m
Distance of C/L of Pier/Abutment to the C/L of Pile Cap (Transv. Direction) = 0.00 m

Salient Levels:

T = 4.79 m
Top of Pile cap level = 24.50 m
pile cutoff level = 22.75 m
Bottom of Pile Cap Level = 22.700 m
Normal Scour Level = 22.70 m
L1 = 0.00 m
L1/T = 0.00 m
Lf/T = 2.20 m
Lf = 10.54 m
Le = 19.141 m

Level at depth of Fixity = 12.222 m


Founding Level = 3.609 m
Considering pile founding level at = 0.000 m
Other Salient Design Data:
Total length of pile (from below pile cap) = 22.70 m
(22.7 m-0 m)
length of pile (upto fixity level from top) = 10.48 m
(22.7 m-12.222 m)
Unit weight of concrete = 24.00 KN/m3
Self weight of one pile = 590.18 KN
(3.14159*1.2^2*22.7*(24-1))/4
Self weight of one pile upto depth of fixity from top 272.55 KN
(3.14159*1.2^2*10.478*(24-1))/4

Material Data:

Grade of concrete for pile cap = M- 35

Grade of reinforcement = Fe- 500

scbc = 11.6667 K = 0.3271028


sst = 240 J = 0.8909657
m = 10 R = 1.7000514
1
2
3
4
5

M- 20 240 125
M- 25 415 200
M- 30 500 240
M- 35
M- 40
M- 45

M- 50