The document provides a worksheet for sizing a grid-intertie photovoltaic system for a project in Haryana, India. It includes historical electrical consumption data, estimates the project's daily and monthly power needs. It then determines the average sun hours per day and calculates an initial PV array size. Factoring in system inefficiencies, it derives a final PV array size of 1001 kW that meets the project's power needs within the available roof space and grid connection limits.

Uploaded by

SAEL SOLAR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
256 views

Design Sheet BPS UNIVERSITY

The document provides a worksheet for sizing a grid-intertie photovoltaic system for a project in Haryana, India. It includes historical electrical consumption data, estimates the project's daily and monthly power needs. It then determines the average sun hours per day and calculates an initial PV array size. Factoring in system inefficiencies, it derives a final PV array size of 1001 kW that meets the project's power needs within the available roof space and grid connection limits.

Uploaded by

SAEL SOLAR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Grid-Intertie Photovoltaic System Sizing Worksheet

Electric Load Estimation & System Sizing

Project Name BPSMV, Sonipat, Haryana. - ACNO : S32BS020102 4/10/2021 8:50


ENTER HISTORICAL ELECTRICAL CONSUMPTION ver. SAEL06012020-R0
Ref. Solar Ginc 1871.2 KWh/sq.m
Annual Usage (kWh) 2857368.0 kWh / year Enter Data Into Yellow Shaded Cells
*Monthly
No. of Solar Gen. Green Cells are Write Protected
Monthly Usage(kWh) Billing kWh
Days
1-Jan-19 200424 31 92300
1-Feb-19 194544 28 117400 State Haryana Roof Space. 13000 Sq.meter
1-Mar-19 31 Connected load/sanctioned
232800 154300 90.0% % of power to be generated from PV system load (kWp). 2107 kW
1-Apr-19 169488 30 151400
1-May-19 240624 31 142800 7828.4 Kilowatt-hrs/day 90% of prower from PV
1-Jun-19 308304 30 86600
1-Jul-19 191520 31 110000 Yearly Consumption 2857368 kWh / year
1-Aug-19 270912 31 120500 Avg Monthly 238114.0 kWh / month
1-Sep-19 286392 30 129000 Avg Daily 7828.4 kWh / day
1-Oct-19 357432 31 133500
1-Nov-19 223704 30 109800
1-Dec-19 181224 31 98200 = 7045.6 (kWh) PV System Kilowatt-hrs/day
TOTAL 2857368 365 1445800
% Energy Consumption full fill by Solar Plant 50.6

Array Sizing

2 Determine average sun hours per day. 4.0 sun-hours/day

3 Calculate initial PV array size assuming 100% efficiency.

7045.6 PV System Kilowatt-hrs/day ÷ 4.0 average peak sun hours/day

= 1778.7 PV System Design Capacity (kW)


4 Calculate system inefficiencies / derating factor.
Derating Factors Input Values Typ. Range
Overall DC to AC derate factor 0.880 .60 - .75

5 Calculate array sizing factoring in derating factor. 1001.0 PV System Design Capacity (kW)

6 Confirm array sizing as per roof Space. 1083.3 System is ok

7 %age of power to be generated sanctioned load(kW) 100% System is ok


8 Final System size 1001 PV Array In Kilowatts (DC)
15% Grid penetration % of distribution transformer capacity
System is OK