CHECK SHEET
SL Content
1 Does the organization have OH & S policy?
2 Who has signed the OH & S policy?
3 Whether the OH & S policy is per guidelines of the statutory provisions?
4 When was the OH & S policy declared and adopted?
5 Whether the OH & S policy reviewed periodically?
6 Whether the OH & S policy is available in local language and made known to all?
7 What was the last date of updation?
8 Does the policy find a place in the annual report?
C-2.1 Safety Department
9 Does the factory have a safety department and what is strength of safety department?
10 Whether the strength and qualifications of Safety Officers are as per the statutes?
11 Does the head of safety department report to the Chief Executive?
12 How often are the safety officers retrained in the latest techniques of total safety
management? What is the frequency of retraining?
13 What additional duties the safety officer is required to do?
14 What is the power of safety officer vis-a-vis unsafe condition or unsafe act?
C-2.2 Safety Committee(s)
15 Does the factory has a safety committee(s)? What are the types, structures and terms
of reference of the committees?
16 Is the constitution of the safety committee(s) as per the statute?
17 How are the members of safety committee(s) selected? (elected / nominated)
18 How often are the meetings of safety committee(s) held?
19 Are the recommendations of the committees(s) implemented?
20 Are the minutes of the safety committee(s) meetings circulated among the members?
21 Are the minutes forwarded to the trade union(s) and chief executive and occupier?
22 Whether the management and trade union play their active roles in supporting and
accepting the committee(s) recommendations?
23 How are the safety committee(s) members apprised of the latest development in
safety, health and environment?
25 Are written Standard / safe operating procedures available for all operations and
processes?
26 Whether the written Standard / safe operating procedures are displayed or made
available and explained in the local language to the workers?
27 c) Whether concerned section and safety department prepares standard / safe
operating procedure jointly?
28 d) Are standard / safe operating procedures reviewed and updated?
29 e) Have the workers been informed of the consequences of failure to observe the
standard / safe operating procedures?
C-5 PLANT MODIFICATION PROCEDURES
30 What is the system for effecting any change in the existing plant, equipment or
process?
31 Whether the P & I diagrams and other related documents are updated accordingly?
32 Whether hazard assessment done before implementation of modification?
C-6 WORK PERMIT SYSTEM
66 Whether the plant layout has taken care of the movement of fire fighting equipment
and emergency exits?
67 Are medical facilities available with trained first aid staff and equipment in round the
clock shift for all including contractors?
68 Is the ambulance van available for round the clock basis with the dedicated driver?
69 Is there any mutual aid scheme available with the nearest hospitals to manage and
treat injuries during emergency?
70 Are the workers / contractor workers aware of emergency medical facilities?
109 Whether hazards arising from use of the products are identified?
110 Whether material safety data sheet prepared for the products?
111 Are all the products labelled and packed appropriately?
112 Whether safety instructions are given along with products?
113 Whether policy exists for recall of products?
136 Does the mechanical integrity program include for all mechanical equipment
including pressure vessels and storage tanks, piping and components, relief devices
and vent systems, emergency shutdown systems, pumps, control systems?
137 Are there written procedures to maintain the on-going integrity of process
equipment?
138 Whether training been provided to each employee involved in maintaining the on-
going integrity of process equipment?
139 Are inspections and tests performed on each item of process equipment included in
the program?
140 Does the inspection and test frequencies meet the manufacturer’s recommendation
and good engineering practice?
141 Are inspections and tests performed more frequently if determined necessary by
operating experience?
142 Are deficiencies in equipment that are outside limits corrected before further use so
as to assure safe operation?
143 In the construction of new plants and equipment, whether quality assurance
programme is implemented to ensure that equipment fabricated is suitable for the
process?
144 Are appropriate checks and inspections made during equipment installation stage?
145 Are the suitability of maintenance materials, spare parts and equipment ensured
during maintenance?
C-19 PHYSICAL HAZARD
C-19.1 Housekeeping
157 Whether machinery and equipment which can cause physical injuries to operator
have been identified?
158 Are all moving parts and point of operation of machinery adequately guarded?
159 Are all fixed guards securely bolted in position and in good condition?
160 Are all interlock guards for prevention of physical injury in good condition?
160 Are all emergency stop buttons effective and clearly labeled?
162 Are the operators for machines having moving parts aware of the danger of working
with loose clothing?
163 Are the openings where there is free fall hazard covered or fenced securely?
186 Whether the Material Safety Data Sheet for all chemicals is available?
187 Are the chemicals stored as per their hazardous properties including the
incompatibility?
188 Are all containers clearly, indelibly labelled? Are all chemicals stored as per safety
regulations?
189 Whether all racks and steel cages have sufficient load bearing capacity?
190 Is adequate natural ventilation provided to storeroom? Is there any emergency exit?
191 Whether adequate fire fighting arrangement existing in flammable chemical storage?
192 Whether methodology for handling spillages of hazardous chemical available along
with the equipment required handling the spillage?
193 Whether aisles are marked and emergency exits displayed?
194 What is the system for effecting any change in the existing plant, equipment?
195 Is there system for evaluating hazards from new equipment?
196 Whether the P and I diagrams and other related documents are updated accordingly?
197 Is any Job Hazard Analysis (JHA) carried out after installation of new equipment?
198 Whether licences have been obtained for storage / handling of radioactive material?
199 Whether approved Radiological Safety Officer appointed?
200 Whether appropriate PPEs are used against radiation hazards?
201 Is the flooring of the radioactive material handling area amenable for proper
decontamination?
202 Is the storage room of radiation source as per the licence condition?
203 Are all persons working in the facility have radiation safety training?
204 Is the operators handling devices using radioactive materials qualified and possess
the necessary certificate?
205 Is the periodical radiation monitoring carried out?
206 Are the records of inventory of radioactive material maintained in the standard
format and submitted to the competent authority as per the period specified?
207 Are emergency handling tools available?
208 Are the personnel monitoring badges (TLD, Pocket dosimeter etc.) assigned and
worn by each radiation worker?
209 Are the radiation symbol and red light displayed as required?
C-20 CHEMICAL HAZARD
210 What potentially hazardous materials are transported to or from the site (including
wastes)
211 What mode of transport are used? 1) Road,2) Rail, and 3) Pipelines
1) Road
i) Does the company employ licenced vehicle of its own / outside sources?
ii) Are the loading / unloading procedures in place and safety precautions displayed?
iii) Is there a provision to check the healthiness of road tanker with respect to
explosives rules?
iv) Are loaded tankers or trucks parked in a specific area on-site?
v) Do all truck and tanker drivers carry transport emergency (TREM) card or
instruction booklet?
vi) Do all truck and tanker drivers get training in handling emergencies during
transport?
vii) Are all the tankers marked for proper Hazchem code?
212 2)Rail
i) What hazardous materials are transported by rail?
ii) Does the company have a direct siding on site?
iii) Are tankers or other wagons used in transportation
213 3) Pipelines
i) What materials are transported to and from the site by pipelines?
ii) Are the pipelines underground or over ground?
iii) Are corrosion protection measures employed in pipelines?
iv) Whether intermediate booster pumps are used?
v) What is the maximum, minimum and average transfer rates?
vi) Are the pipelines extended in the public domain?
vii) Are the pipelines dedicated for each type of chemicals?
viii) Are the pipelines fitted with safety equipment such as leak detectors,
automatic shut-off valves etc.?
ix) What is the frequency and method of testing of the pipeline?
x) Is there written procedure for tackling leakages in pipeline?
217 Are the employees aware of the hazards arising from hazardous substances and safety
precautions to be taken during handling of these?
218 Are the material safety data sheets available for all the chemicals handled, used and
manufactured in the factory? INCLUDING IN LOCAL LANGUAGE
219 Whether the latest MSDS are displayed at strategic locations?
223 Whether storage vessels are identified with the capacity as required under MSIHC,
Rules 1989.
224 What are the storage pressure and temperature?
225 Whether vessels are above ground / underground?
226 If any of the tanks storing flammable material, whether electrical equipment and
fittings are as per electrical area classification?
227 Is the bunded area takes into account the total quantity of the largest tank?
228 Whether the bund perimeter takes into consideration of trajectory of leak from tank?
229 Are the vessels properly bonded and earthed and whether periodically checked and
record maintained?
230 Are the vessels fitted with remotely controlled isolation valves?
231 Are vessels provided with emergency vent, relief valve, bursting disc, level
indicator, pressure gauge, overflow line?
232 Where do such vents discharge?
233 Are the vessels provided with alarms for high level, high temperature and high
pressure?
234 Are standby empty tanks or any other alternate systems provided for emptying /
transfer in case of emergencies?
235 What are the provisions made for fire fighting /tackling emergency situations around
the storage vessels?
236 Has any consequence analysis for loss of containment been carried out?
237 Whether the vessels are tested as per statute?
238 Whether log sheets are filled up on daily basis for recording the parameters of these
vessels?
239 Whether monitors for detection of leakage of flammable / toxic material installed?
240 Whether the chemicals stored are as per their compatibility?
241 What are the various gas cylinders used in the plant?
242 Are valid licenses available for storing all these cylinders?
243 Are the cylinders stored and segregated as per their compatibility?
244 What are the measures taken for combating any emergency in the cylinders storage
area?
245 Whether integrity test certificates are obtained from the suppliers of the cylinders
246 Are the cylinders chained and secured properly along with the valve caps and proper
identification colour code?
247 Are the cylinders protected from heat or sun and rain?
248 Whether monitors for detection of leakage of flammable / toxic gas installed?
249 Are all the containers, vessels and storage tanks labeled for its content and capacity?
250 Whether the pipelines are colour coded as per IS 2379?
251 Is any plant specific colour code followed?
252 Whether the colour codes are displayed conspicuously in the working areas?
258 What is the total strength of fire station and fire crew?
259 How many fire crews are available in each shift?
260 Is there fire squad identified in each shift?
261 Standing fire order is available with latest revision
262 How is the communication with fire station?
263 Does fire safety inspections carried out?
264 Does emergency procedure available for leakage or combustion of flammables?
265 What measures are available to control the fire load in the plant area?
266 Whether technical knowledge and skills of the manager and staff responsible for
overall fire safety of the plant is adequate?
267 How many major and minor incidents / fires were there in the factory during the last
five years? Give department / plant wise.
268 Have all the fires / incidents been investigated and corrective actions taken? Give
break-up.
269 Resources: Adequacy of protective clothing (coat, trouser, gloves, boots and helmets)
270 Resources: Availability of SCBA for fire fighting operations and spare cylinders (at
least 2 for each SCBA);
271 Resources :Adequacy of hose, nozzles, ladders, lighting equipment and pumps;
272 Resources : Communication facility at fire station, walkie talkie sets during fire
fighting.
273 Whether the two safe means of escape available? Are they in separate directions?
274 Is emergency exits provided to the building handling flammables?
275 Whether emergency lights are provided?
276 Whether fire / smoke detectors are installed in fire prone areas?
277 Whether fire call points are provided in different areas?
278 Whether Fire hydrants are provided near the buildings?
279 Is ventilation system in plant handling flammables is adequate to prevent formation
of flammable mixtures?
280 Is adequate separation is provided between combustible / flammable materials and
other material to restrict the fire growth?
281 Access routes for fire fighting operations is available for areas having high fire load
282 Whether building changes interferes with fire detection and / or fire suppression
systems?
283 Whether building changes cause unreasonable fire loading / openings in the fire rated
walls?
284 Are the electrical equipment in areas where flammables mixture is likely to be
present of flame-proof type?
285 Are lightning arrestors are provided to the buildings / structures storing flammable
materials?
286 Whether adequate bonding and grounding of electrical equipment / pipelines
provided?
287 Whether necessary license / approval taken from concerned statutory bodies?
288 Whether systems for explosion suppression, high speed fire detection with deluge,
sprinklers, explosion venting etc. are provided?
289 Whether explosion resistant walls or barricades are provided around explosive
storage?
290 Whether explosive substance storage areas are restricted for entry?
291 Whether only trained persons are handling explosive substances?
292 Whether explosive substances are stored and transported in approved containers
only?
293 Whether electrical fixtures in areas handling explosives are explosion proof type?
294 Whether adequate measures are taken to prevent any sources of ignition where
explosive substances are handled?
311 What are the passive fire protection measures available? (barriers, doors, dampers
etc.)
312 Are the areas requiring fire barriers identified?
313 Whether the fire barrier provided is of adequate ratings?
314 Whether ventilation ducts in flammable areas have been provided with isolation
dampers of suitable fire rating?
315 Whether sprinklers / deluge are installed wherever necessary?
316 Whether regular inspection / maintenance / testing of fire protection system carried
out and records maintained?
317 What are the sources of firewater and whether they are dedicated to the fire
extinguishing system?
318 Whether the capacity of dedicated water reservoir is adequate to supply to hydrants
for minimum 2 hours?
319 Whether un-interrupted power supply is provided to the firewater pumps?
320 Whether the extinguishing medium selected is appropriate to the class of fire (water,
gaseous, foam, dry powder)?
321 Whether fire hydrants layout is available?
323 Whether additional (over minimum requirement) fire hoses, nozzles are available?
324 Whether the hydrants lines are kept pressurized?
325 Whether regular inspection / maintenance / testing of fixed fire extinguishing systems
carried out and records maintained?
339 Whether mock fire drills are conducted? What is the frequency of drills?
340 Whether fire drills are also performed in night shift
341 Whether feedback of fire drill is documented?
342 What is the system of mutual-aid scheme?
343 Whether there is a system of providing fire fighting training to plant personnel
344 What is the frequency and duration of such training? Whether training records are
maintained?
345 Whether fire squads are identified for different areas for first-aid fire fighting and
rescue, and suitably trained?
346 Are all personnel conversant with the fire prevention and protection measures?
347 Whether the fire staff are sent for refresher / advanced training courses?
348 Whether all vessels and pipes are provided with suitable bonding and grounding?
349 Whether arrangement has been made for grounding the tanker containing flammable
liquid during loading / unloading?
350 Whether spark resistant tools are provided?
351 Whether lightning protection is provided and is adequate?
352 Whether antistatic clothing, hand gloves and footwear are provided?
C-21.14 Pressure Relief System
353 Whether the listing of all ‘pressure plants’ [as defined under Factories Act] has been
done?
C-22.1 Ventilation, Illumination, Noise, Vibration, Heat stress and Non-ionizing Radiations
390 Whether the dust, fumes, smoke aerosols and mist are monitored as per statute and
records maintained?
391 What are the types of detectors used for monitoring concentration of hazardous
chemicals?
392 Is any alarm system installed for any leakage of hazardous chemicals?
393 Are antidotes available for toxic chemicals?
394 Are control measures initiated whenever deviation from permissible values is
observed?
395 Are adequate numbers of first aid boxes provided? Give location details?
396 b) Are qualified / trained first aiders available in each shift?
397 c) How many qualified / trained first aiders are available at each plant / department?
398 How many persons are trained / given refreshers training in first aid in a year?
400 Whether occupational health center is provided?
401 Does OHC conform to the provisions of the existing statutes?
402 Are the Medical Attendants / Doctors available in each shift?
403 What facilities are available for transportation of the injured to hospital?
404 Are the names of the trained first aiders displayed?
405 Are the name of nearest hospitals and its telephone number available in OHC?
406 Does the plant have any special preventive medicine program?
408 Is ambulance posted in proper place and is it available whenever required?
409 Are sufficient numbers of anti-dotes available in case of any emergency?
410 Are fire safety measures provided in first aid centre?
411 Are emergency lighting arrangements available at first aid centre?
412 Whether the periodical medical examination of employees, required under relevant
statute is carried out?
413 Whether it is ensured that contractors employee are medically examined during pre-
employment as well as during the course of employment?
414 During the periodical medical examination of the workers, are they examined as per
the hazardous process in which they work? (First schedule of The Factories Act,
1948)
415 Are the records of all such examination maintained?
416 Whether list of required PPE for each hazardous activity is available
417 Whether feedback from workers obtained during selection of PPE?
418 Have the workers been trained in proper use of PPE including BA sets?
419 What is the system of procurement, inspection, issue, maintenance and replacement
of PPE?
420 What are the arrangements for safe custody and storage of PPE?
421 Whether qualitative and quantitative fit-check for respirators is ensured prior to use?
422 Are the contractor’s workers provided with the required PPE?
423 Do the PPE conform to any standard?
424 Are sufficient eye wash fountains and safety showers available?
425 Whether appropriate respiratory protective devices are available in accordance to the
hazard potential?
426 Are the staff members trained in the right uses of respiratory protective devices?
429 Whether the medical practitioner informed the Chief Inspector of Factories about the
occurrence of the occupational disease?
430 What is the procedure for accident / incident / dangerous occurrence reporting?
431 Whether the accident data for the last five years for reportable and non-reportable
accidents are available?
440 How does the management ensure implementation of the recommendations to avoid
recurrence of accidents and incidents?
443 Are the site area maps (including layout, access roads and assembly points) available
in control room / emergency control centre?
444 Is the hierarchy of emergency response personnel right from site emergency
controller downward, and alternative officials identified?
445 Are the duties and responsibilities assigned to the designated officials during
emergency, both during and outside normal working hours clearly identified and
understood by them?
448 Is the list of designated officials who are to be communicated about declaration and
termination of emergency available in the control room /
emergency control centre?
449 Are the methods of communication (siren, public address system etc.) for declaration
and termination of an emergency known to all the workers?
450 Are the following resources (equipment, personnel and procedures) required to
handle emergency available?
1) Communications,
2) Public announcement systems
3) Monitoring of hazardous releases into the environment,
4) Emergency shelters at the facility,
5) Emergency exits with proper illumination, with uninterrupted power supply ,
6) Direction for emergency exit / escape route marked in haulage / Alleyways,
7) Transport for evacuation of plant personnel,
8) Medical care including administration of antidotes, and
9) Security / maintenance of law and order.
451 Does the emergency control centre have direct communication links with the fire
station and the plant control room?
452 Are there adequate alarm points from which an emergency alarm can be raised?
453 Is there infrastructure available for ensuring backup electric power supply for
communication links where required
457 Is the emergency plan updated based on the feedback from the periodic drills /
exercises?
458 Are the contact details of all concerned officials kept updated in the emergency plan?
460 Are the scenarios varied in the mock-exercises to ensure that all possible factors
including meteorological conditions, affected plant personnel covered?
461 Whether emergency preparedness Plans have been tested and reviewed at regular
frequency through mock drill for its adequacy
464 Are the types of accidents where external organizations would be involved in
remedial actions identified? Are their responsibilities defined?
465 Is the plant responsible for rendering mutual aid assistance to any other external
organizations? Does this assistance effect the plant’s emergency
preparedness?
466 Whether the communication channels for mutual assistance identified and known
with and between two organizations?
467 Is the emergency control center located beyond the effective distances of identified
emergency scenarios?
468 If the emergency control center is located within the effect distance, is it suitably
protected that it will be available in case of emergency?