Weekly Safety Management Walkthrough Report: Gas Compression Project Department
Weekly Safety Management Walkthrough Report: Gas Compression Project Department
Prepared by
Mohammad Irshad Ali Khan- FCC II
Laydown
Laydown
Need to remove the plastic can Azmeel
Open
April 8 , Found diesel in plastic can from the area and diesel shall April 8 ,
08 2021Lay directly exposed under sun not be filled in plastic can use
light .which can cause fire
2021
down jerry can.
Azmeel
Laydown Found water tape leaking Need to fix the drinking water Open
10 and no proper connection tank and station and check for April 8 ,
in laydown area leakage all the tapes. 2021
Azmeel
Found Diesel tank placed
on uneven surface w/o Need to put the tank on
Laydown
Open
proper positioning can permanent support structure.
12 April 8 ,
cause fall hazard. Provide dip tray to stop the oil
Oil spill from the tank no spill 2021
dip tray available
Azmeel
Found construction waste
Laydown Need to conduct housekeeping Open
and garbage material in
16 and remove unwanted April 8 ,
front of mosque and mess
materials. 2021
hall in laydown area
Azmeel
Found Material without Need to conduct housekeeping
Laydown
Open
barricading and segregate the material. Place
18 April 8 ,
segregation in laydown barricading and provide access
area way between materials. 2021
THANKS
Field Compliance Coord Team
SA Badge#08020807
HD&HW ISD-TCF1
Mobile#0502009207