0% found this document useful (0 votes)
53 views

Concrete Formwork Removal Time, Specifications and Calculations

concrete

Uploaded by

dhan singh
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views

Concrete Formwork Removal Time, Specifications and Calculations

concrete

Uploaded by

dhan singh
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

☰ 🔒

🔍 Search 📰 VIP Dashboard

Concrete Formwork Removal Time, Speci cations and


Calculations
📖 Popular A
⌂ Home / Building Technology Guide
Types of F
Go Buildings
Mi
Compress
Go Concrete
Mi Procedure

Methods o
[PDF]: Com
and Stora

16 Types o
Sa Used in C
An
Standard
Residenti
Locations

📖 Recent Ar
The removal of concrete formwork also called as strike-o or stripping of formwork should be carried out only after the time when
concrete has gained su cient strength, at least twice the stress to which the concrete may be subjected to when the formworks are Qinghai–T
removed. It is also necessary to ensure the stability of the remaining formwork during formwork removal. Longest a
Railway in

Importan
Treatmen

Gotthard
Construct
World’s L

San Marco
Foundatio
Tallest Str

Concrete Formwork Removal Time What is Bi

The rate of hardening of concrete or the concrete strength depends on temperature and a ects the formwork removal time. For
example, time required for removal of concrete in winter will be more than time required during summer. 📖 Recent Qu

Special attention is required for formwork removal of exural members such as beams and slabs. As these members are subjected toIn what ca
provided
self-load as well as live load even during construction, they may de ect if the strength gained is not su cient to handle to loads.
 0 Answ

To estimate the strength of concrete before formwork removal, the tests on concrete cubes or cylinders should be carried out. The
What is pi
concrete cubes or cylinders should be prepared from the same mix as that of the structural members and cured under same termite tr
circumstances of temperature and moisture as that of structural member.  0 Answ


Which ins
×
Get Noti cations
for survey
When it is ensured that the concrete in the structural members has gained su cient strength to withstand the design load, only then  1 Answ
formworks should be removed. If possible, the formworks should be left for longer time as it helps in curing.
Which typ
used in pr
 0 Answ

How can w
levitation
engineeri
 0 Answ

📖 Popular A

Types of F
Go Buildings
Removal of formwork from the concrete section should not make the structural element to: Mi
Collapse under self load or under design load Compress
Go Concrete
de ect the structural member excessively in short or the long term Mi Procedure
physically damage the structural member when formwork is removed.
Methods o
The following points must be kept in mind during formwork removal whether the structure will be prone to: [PDF]: Com
and Stora
freeze thaw damage
cracks formation due to thermal contraction of concreteafter formwork striking. 16 Types o
Sa Used in C
If there is a signi cant risk of any of the above damages, it is better to delay  the removal time of formwork. If formwork have to An
removed for optimising the concrete construction activities, then these structures must be insulated well to prevent such damages.
Standard
Residenti
Locations

📖 Recent Ar

Qinghai–T
Longest a
Railway in

Importan
Treatmen

Gotthard
Construct
World’s L

San Marco
Foundatio
Tallest Str

What is Bi

📖 Recent Qu

In what ca
Calculation of Safe Formwork Striking Times: provided
 0 Answ

What is pi
termite tr
 0 Answ


Which ins
×
Get Noti cations
for survey
 1 Answ

Which typ
used in pr
 0 Answ

How can w
levitation
engineeri
 0 Answ

Structural members are constructed based on designed load. But before a structure is complete and subjected to all loads assumed 📖 Popular A
during structural design, the structural members are subjected to its self weight and construction loads during construction process. Types of F
Go Buildings
So, to proceed with construction activities at a quicker rate, it is essential to calculate the behaviour of structure under is self loadMi
and
construction load. If this can be done and structural member is found to be safe, formwork can be stripped-o .
Compress
If these calculations are not possible, then following formula can be used for calculation of safe formwork striking times: Go Concrete
Mi Procedure
Characteristic strength of cube of equal of maturity to the structure required at time of formwork removal
Methods o
[PDF]: Com
and Stora

This formula was given by Harrison (1995) which describes in detail the background of determination of formwork removal times. 16 Types o
Sa Used in C
An
Standard
Residenti
Locations

📖 Recent Ar

Qinghai–T
Longest a
Railway in
Other method to determine the strength of concrete structure is to conduct the non-destructive tests on structural member.
Importan
Factors A ecting Concrete Formwork Striking Times Treatmen

The striking time of concrete formwork depends on the strength of structural member. The strength development of concrete member
Gotthard
depends on: Construct
World’s L

Grade of concrete – higher the grade of concrete, the rate of development of strength is higher and thus concrete achieves the strength in shorter
San Marco
time. Foundatio
Grade of cement – Higher cement grade makes the concrete achieve higher strength in shorter time. Tallest Str

Type of Cement – Type of cement a ects the strength development of concrete. For example, rapid hardening cement have higher strength gain in
What is Bi
shorter period than the Ordinary Portland Cement. Low heat cement takes more time to gain su cient strength than OPC.
Temperature – The higher temperature of concrete during placement makes it achieve higher strength in shorter times. During winter, the concrete
strength gain time gets prolonged. 📖 Recent Qu
A higher ambient temperature makes the concrete gain strength faster. In what ca
provided
Formwork helps the concrete to insulate it from surrounding, so longer the formwork remain with concrete, the less is the loss of heat of hydration
 0 Answ
and rate of strength gain is high.
Size of the concrete member also a ects the gain of concrete strength. Larger concrete section members gain strength in shorter time than smaller
What is pi
sections. termite tr
 0 Answ
Accelerated curing is also a method to increase the strength gain rate with the application of heat.

Which ins
×
Get Noti cations
for survey
 1 Answ

Which typ
used in pr
 0 Answ

How can w
levitation
engineeri
 0 Answ

Generally following values of concrete strength is considered for removal of formwork for various types of concrete structural 📖 Popular A
members. Types of F
Go Buildings
Table – 1: Strength of concrete vs. Structural Member Type & Span for Formwork Removal Mi

Concrete Strength Structural Member Type and Span Compress


Go Concrete
Mi Procedure
2.5 N/mm2 Lateral parts of the formwork for all structural members can be removed
Methods o
70% of design strength Interior parts of formwork of slabs and beams with a span of up to 6m can be removed [PDF]: Com
and Stora
85% of design strength Interior parts of formwork of slabs and beams with a span of more than 6m can be removed
16 Types o
Sa Used in C
Table – 2: Formwork Stripping Time (When Ordinary Portland Cement is used): An

Type of Formwork Formwork Removal Time Standard


Residenti
Locations
Sides of Walls, Columns and Vertical faces of beam 24 hours to 48 hours (as per engineer’s decision)

Slabs (props left under) 3 days


📖 Recent Ar
Beam so ts (props left under) 7 days
Qinghai–T
Longest a
Removal of Props of Slabs: Railway in

i) Slabs spanning up to 4.5m 14 days Importan


Treatmen
ii) Slabs spanning over 4.5m 14 days
Gotthard
Removal of props for beams and arches Construct
World’s L
i) Span up to 6m 14 days
San Marco
ii) Span over 6m 21 days Foundatio
Tallest Str

Important Note: What is Bi

It is important to note that the time for formwork removal shown above in Table -2 is only when Ordinary Portland Cement is used. In
normal construction process Portland Pozzolana cement is used. So, the time shown in Table-2 should be modi ed. 📖 Recent Qu

For cements other than Ordinary Portland cement, the time required for formwork removal should be as: In what ca
provided
Portland Pozzolana Cement – stripping time will be 10/7 of the time stated above (Table-2)  0 Answ

Low heat cement – stripping time will be 10/7 of the time stated above (Table-2)
What is pi
Rapid Hardening Cement – stripping time of 3/7 of the time stated above (Table-2) will be su cient in all cases except for vertical sides of slabs, termite tr
beams and columns which should be retained at least for 24 hours.  0 Answ

Concrete Formwork Removal Speci cation 


Which ins
×
Get Noti cations
for survey
 1 Answ

Which typ
used in pr
 0 Answ

How can w
levitation
engineeri
 0 Answ

📖 Popular A

During stripping of formwork, following points must be remembered: Types of F


Go Buildings
Formwork should not be removed until the concrete has developed su ciently strength to support all loads placed upon it. The time requiredMi
before
formwork removal depends on the structural function of the member and the rate of strength gain of the concrete. The grade of concrete, type of
Compress
cement, water/cement ratio, temperature during curing etc. in uence the rate of strength gain of concrete. Go Concrete
Mi Procedure
The formwork parts and connections should be arranged in a way that makes formwork removal easy and simple, prevents damage to concrete and
formwork panels so that it can be reused without extensive repair.
Methods o
The formwork removal procedure should be supervised by the engineer to ensure that quality of hardened concrete in structural member, i.e. it [PDF]: Com
should be free from or has minimum casting defects such as honeycombing, size and shape defects etc. These defects in concrete in uence the and Stora
strength and stability of structure. Thus immediate repair works can be done or the members can be rejected.
16 Types o
The separation of forms should not be done by forcing crowbars against the concrete. It may damage the hardened concrete. This should be Sa Used in C
achieved by using wooden wedges. An
Beam and joist bottoms should remain in place until nal removal of all shoring under them are done. Standard
Residenti
Joist forms should be designed and removed so that the shores may be removed temporarily to permit removal of joist forms but must be replaced
Locations
at once. The shores and joists will be dismantled beginning from the middle of the member’s span, continuing symmetrically up the supports.
The approval from the engineer should be obtained for the sequence and pattern of formwork removal.
📖 Recent Ar
Reference:
Qinghai–T
ACI (1995) In-place methods to estimate concrete strength. ACI 228.1R-95. Longest a
Railway in
ASTM (1987) Standard practice for estimating concrete strength by the maturity method. ASTM C1074–87
BS 8110 – code of practice for the structural use of concrete Importan
Treatmen
IS-456 – Plain and Reinforced Concrete – Code of Practice

FAQs Gotthard
Construct
World’s L
When should formwork be removed?
The removal of concrete formwork also called as strike-o or stripping of formwork should be carried out only after the time when San Marco
Foundatio
concrete has gained su cient strength, at least twice the stress to which the concrete may be subjected to when the formworks are Tallest Str
removed. It is also necessary to ensure the stability of the remaining formwork during formwork removal.
What is Bi
What are the factors a ecting concrete striking time?
The striking time of concrete formwork depends on the strength of the structural members. The strength development of concrete
📖 Recent Qu
member depends on:
1. Grade of concrete In what ca
2. Grade of cement provided
 0 Answ
3. Type of Cement
3. Temperature
What is pi
4. Size of the concrete member termite tr
5. Accelerated curing  0 Answ

Read More: 
Which ins
Get Noti cations ×
for survey
Types of Formwork (Shuttering) for Concrete Construction  1 Answ

Plastic Formworks for Concrete – Applications and Advantages in Construction Which typ
used in pr
Concrete Formwork Design Considerations – Basis for Concrete Formwork Design  0 Answ

Wooden Concrete Formwork Design Criteria with Calculation Formulas


How can w
levitation
Concrete Formwork Loads and Pressure Calculations engineeri
 0 Answ
Concrete Formwork Removal Time, Speci cations and Calculations
📖 Popular A
Measurement of Formworks
Types of F
Formwork (Shuttering) for Di erent Structural Members -Beams, Slabs etc Go Buildings
Mi
Formwork Safe Practices Checklist
Compress
Go Concrete
Mi Procedure
 Share This Article  Facebook   
Methods o
[PDF]: Com
and Stora
← Previous article
16 Types o
Waterproo ng Admixtures for Concrete – Requirement, Functions, Dosage and Mechanism Sa Used in C
An
Next article →
Standard
Curing of Cement Concrete – Time and Duration
Residenti
Locations

📖 Recent Ar

Qinghai–T
Longest a
Railway in

Importan
Treatmen

Gotthard
Construct
World’s L
Gopal Mishra
San Marco
Foundatio
Gopal Mishra ✓
Tallest Str

What is Bi

Related Posts
📖 Recent Qu

In what ca
provided
 0 Answ

What is pi
termite tr
 0 Answ


Which ins
×
5 Popular Types of Door Locks 4 Types of Cracks in Concrete Columns and their Causes:
Get Noti... cations
for survey
 1 Answ

Which typ
used in pr
 0 Answ

How can w
levitation
engineeri
 0 Answ

📖 Popular A

Types of F
Go Buildings
Mi
Compress
Go Concrete
Mi Procedure

Methods o
[PDF]: Com
and Stora

16 Types o
Sa Used in C
An
Standard
Residenti
Locations

📖 Recent Ar

Qinghai–T
Longest a
Railway in

Importan
Treatmen

Gotthard
Construct
World’s L

San Marco
Foundatio
Tallest Str

What is Bi

📖 Recent Qu

In what ca
provided
 0 Answ

What is pi
termite tr
 0 Answ


Which ins
×
Get Noti cations
for survey
 1 Answ

Which typ
used in pr
 0 Answ

How can w
levitation
engineeri
 0 Answ

📖 Popular A

Types of F
Go Buildings
Mi
Compress
Go Concrete
Mi Procedure

Methods o
[PDF]: Com
and Stora

16 Types o
Sa Used in C
An
Standard
Residenti
Locations

📖 Recent Ar

Qinghai–T
Longest a
Railway in

Importan
Treatmen

Gotthard
Construct
World’s L

San Marco
Foundatio
Tallest Str

What is Bi

📖 Recent Qu

In what ca
provided
 0 Answ

What is pi
termite tr
 0 Answ


Which ins
×
Get Noti cations
for survey
 1 Answ

Which typ
used in pr
 0 Answ

How can w
levitation
engineeri
 0 Answ

📖 Popular A

Types of F
Go Buildings
Mi
📁 Know More Compress
Go Concrete
⌂ Home Mi Procedure
 About Us
Methods o
 Contact Us [PDF]: Com
 Privacy Policy and Stora

 Terms & Conditions


16 Types o
Sa Used in C
📁 Connect With Us
An

 Ask Question Standard


Residenti
✎ Write Article Locations
 VIP Membership
 Popular Questions
📖 Recent Ar

Qinghai–T
Search ...
Longest a
Railway in
Articles 

Importan
Treatmen
Search

Gotthard
Construct
World’s L
© 2009-2021 The Constructor. All Rights Reserved.
San Marco
Foundatio
Tallest Str

What is Bi

📖 Recent Qu

In what ca
provided
 0 Answ

What is pi
termite tr
 0 Answ


Which ins
×
Get Noti cations
for survey

You might also like