Rekapitulasi Rincian Anggaran Biaya: NO Uraian Pekerjaan Jumlah Harga (RP)

This document provides a budget breakdown for a water pipe relocation project in Bogor, West Java, Indonesia in 2018 and 2019. It lists the various work items, quantities, unit prices and total costs. However, the total costs are left blank, presumably because the project was still in the planning stages. The work includes pipe installation, fittings, valves, mobilization and documentation.

Uploaded by

Slamet Suntoro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
97 views

Rekapitulasi Rincian Anggaran Biaya: NO Uraian Pekerjaan Jumlah Harga (RP)

This document provides a budget breakdown for a water pipe relocation project in Bogor, West Java, Indonesia in 2018 and 2019. It lists the various work items, quantities, unit prices and total costs. However, the total costs are left blank, presumably because the project was still in the planning stages. The work includes pipe installation, fittings, valves, mobilization and documentation.

Uploaded by

Slamet Suntoro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

REKAPITULASI RINCIAN ANGGARAN BIAYA

PEKERJAAN : PEMINDAHAN PIPA DISTRIBUSI


LOKASI : JALAN RAYA NAROGONG
PDAM TIRTA KAHURIPAN KABUPATEN BOGOR
TAHUN : 2018

JUMLAH HARGA
NO URAIAN PEKERJAAN
(RP)

I PEKERJAAN PERSIAPAN -

II PENGADAAN PIPA,FITTING & ACCESSORIES -

III PEMASANGAN PIPA ,FITTING DAN ACCESSORIES -

IV PEKERJAAN TAPPING -

V PEKERJAAN PEMBUATAN DUDUKAN PIPA -

VI BIAYA SUPERVISI -

JUMLAH -
BIAYA SCF -
SUB TOTAL -
PPN 10% -
TOTAL -
DIBULATKAN -

Terbilang :
HARGA PERKIRAAN SENDIRI (HPS)
PEKERJAAN : RELOKASI PIPA DISTRIBUSI AKIBAT PEMBANGUNAN TOL CIMANGGIS-CIBITUNG
LOKASI : JALAN RAYA NAROGONG
PDAM TIRTA KAHURIPAN KABUPATEN BOGOR
TAHUN : 2019

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN SAT VOLUME
(RP) (RP)
I PEKERJAAN PERSIAPAN
a Pengukuran ulang dan Pembersihan Lapangan hok 60.00 -
b Pembuatan Direksi Keet & Gudang sementara m2 55.00 -
c Pembuatan papan nama proyek & rambu jalan ls 1.00 -
d Mobilisasi dan Demobilisasi ls 1.00 -
e Laporan dan Dokumentasi set 1.00 -
f As Build drawing,dokumentasi dan pelaporan ls 1.00 -
g Biaya perencanaan awal ls 1.00 -
h Redesign biaya perencanaan ls 1.00 -
Sub Total I -
II PENGADAAN PIPA,FITTING & ACCESSORIES
II.1 PENGADAAN PIPA
a Pipa HDPE 100 PN-10 SDR17 315mm(12")SNI m' 700.00 -
b Pipa HDPE 100 PN-10 SDR17 200mm(8")SNI m' 850.00 -
c Pipa HDPE 100 PN-10 SDR17 160mm(6")SNI m' 2,150.00 -

II.2 PENGADAAN ASESORIS


a Tee Segmented
- Tee Y 200mm x 200mm Segmented bh 2.00 -
- Reducer Tee 150mm x 100mm Segmented bh 1.00 -
- Tee 150mm x 50mm Segmented bh 2.00 -
b Bend Segmented 90° -
- Bend 315mm segmented 90° bh 1.00 -
- Bend 200mm segmented 90° bh 1.00 -
- Bend 160mm segmented 90° bh 2.00 -
c Bend Segmented 45° -
- Bend 300mm segmented 45° bh 4.00 -
- Bend 200mm segmented 45° bh 4.00 -
- Bend 160mm segmented 45° bh 4.00 -
d Reducer segmented 45° -
- reducing 200mm x 150mm segmented bh 2.00 -
e Gate Valve -
- Gate Valve Dia 300mm bh 1.00 -
- Gate Valve Dia 200mm bh 2.00 -
- Gate Valve Dia 150mm bh 3.00 -
Gate Valve Dia 100mm bh 1.00 -
Gate Valve Dia 50mm bh 3.00 -
f Stub Flange Segmented -
- Stub Flange 315mm Segmented bh 2.00 -
- Stub Flange 200mm Segmented bh 4.00 -
- Stub Flange 160mm Segmented bh 6.00 -
Stub Flange 100mm Segmented bh 1.00 -
Stub Flange 50mm Segmented bh 3.00 -
g Flange Spigot -
- Flange Spigot 315mm bh 1.00 -
- Flange Spigot 200mm bh 2.00 -
- Flange Spigot 160mm bh 3.00 -
Flange Adaptor 100mm bh 1.00 -
Flange Adaptor 50mm bh 3.00 -
h Dresser Joint -
- Dresser Joint 12" 315mm bh 2.00 -
- Dresser Joint 8" 200mm bh 2.00 -
- Dresser Joint 6" 160mm bh 2.00 -
i Street Poth -
- Street Poth Large bh 6.00 -
i Pelengkap -
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SAT VOLUME
(RP) (RP)
- Karet Packing m2 6.00 -
- Mur baut bh 176.00 -

II.3 PENGADAAN PERANGKAT WASH OUT


II.3.1 PENGADAAN PERANGKAT WASH OUT DIA 150MM
- Reducing Tee 300mmx150 mm Segmented bh 1.00 -
- Gate Valve Dia 150 mm bh 1.00 -
- Pipa HDPE 100PN-10SDR 17 150mm(6")SNI m 3.00 -
- Street Poth Large bh 1.00 -
- Stub Flange 150mm Segmented bh 2.00 -

II.3.2 PENGADAAN PERANGKAT WASH OUT DIA 100MM


- Reducing Tee 200mmx100 mm Segmented bh 1.00 -
Reducing Tee 150mmx100 mm Segmented bh 3.00 -
- Gate Valve Dia 100 mm bh 4.00 -
- Pipa HDPE 100PN-10SDR 17 dia.100mm(4")SNI m 6.00 -
- Street Poth Medium bh 4.00 -
- Stub Flange 100mm Segmented bh 8.00 -

Sub Total II -
III PEMASANGAN PIPA ,FITTING DAN ACCESSORIES
III.1 Pemasangan Pipa PVC (terdiri dari,galian tanah,urugan
tanah,pemadatan,urugan pasir,pemasangan pipa & Pembuangan
- Tanah)
- Pekerjaan pemasangan pipa HDPE Dia 300mm dengan metode boring m¹ 620.00 -
- Pekerjaan pemasangan pipa HDPE Dia 200mm dengan metode boring m¹ 770.00 -
- Pekerjaan pemasangan pipa HDPE Dia 150mm dengan metode boring m¹ 2,070.00 -
- Peletakan dan penyambungan Pipa HDPE dia 300mm m¹ 80.00 -
- Peletakan dan penyambungan Pipa HDPE dia 200mm m¹ 80.00 -
- Peletakan dan penyambungan Pipa HDPE dia 150mm m¹ 80.00 -
Pekerjaan Crossing Jalan Bina Marga Dia 150mm m¹ 40.00 -
III.2 Pekerjaan dan Pengetesan Pipa dan Pencucian Jaringan
- Pekerjaan Pengetesan Dia 300 mm m¹ 620.00 -
- Pekerjaan Pengetesan Dia 200 mm m¹ 770.00 -
- Pekerjaan Pengetesan Dia 150 mm m¹ 2,070.00 -
- Pencucian Jaringan Pipa Dia 300 mm m¹ 620.00 -
- Pencucian Jaringan Pipa Dia 200 mm m¹ 770.00 -
- Pencucian Jaringan Pipa Dia 150 mm m¹ 2,070.00 -

III.3 Pemasangan Asessories


a Reducing Tee segmented
- reducing tee Y 200mmx160mm segmented bh 3.00 -
- reducing tee 160mmx110mm segmented bh 3.00 -
b Bend Segmented 90°
- Bend 315mm segmented 90° bh 1.00 -
- Bend 200mm segmented 90° bh 1.00 -
- Bend 160mm segmented 90° bh 2.00 -
c Bend Segmented 45°
- Bend 300mm segmented 45° bh 4.00 -
- Bend 200mm segmented 45° bh 4.00 -
- Bend 160mm segmented 45° bh 4.00 -
d Reducer Segmented
- Reducing 200m x 150mm segmented bh 2.00 -
e Gate Valve
- Gate Valve Dia 300mm bh 1.00 -
- Gate Valve Dia 200mm bh 2.00 -
- Gate Valve Dia 150mm bh 3.00 -
- Gate Valve Dia 100mm bh 1.00 -
- Gate Valve Dia 50mm bh 3.00 -
f Stub Flange Segmented
- Stub Flange 315mm Segmented bh 2.00 -
- Stub Flange 200mm Segmented bh 4.00 -
- Stub Flange 160mm Segmented bh 6.00 -
- Stub Flange 100mm Segmented bh 1.00 -
- Stub Flange 50mm Segmented bh 3.00 -
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SAT VOLUME
(RP) (RP)
f Flange Spigot
- Flange Spigot 315mm bh 1.00 -
- Flange Spigot 200mm bh 2.00 -
- Flange Spigot 160mm bh 3.00 -
- Flange Adaptor 100mm bh 1.00 -
- Flange Adaptor 50mm bh 3.00 -
g Dresser Joint
- Dresser Joint 12" 315mm bh 2.00 -
- Dresser Joint 8" 200mm bh 2.00 -
- Dresser Joint 6" 160mm bh 2.00 -
h Street Poth
- Street Poth Large bh 6.00 -
III.4 PEMASANGAN PERANGKAT WASH OUT
III.4.1 PENGADAAN PERANGKAT WASH OUT DIA 150MM
- Reducing Tee 300mmx150 mm Segmented bh 1.00 -
- Gate Valve Dia 150 mm bh 1.00 -
- Pipa HDPE 100PN-10SDR 17 150mm(6")SNI m 3.00 -
- Street Poth Large bh 1.00 -
- Stub Flange 150mm Segmented bh 2.00 -
III.4.2 PENGADAAN PERANGKAT WASH OUT DIA 100MM
- Reducing Tee 200mmx100 mm Segmented bh 1.00 -
- Gate Valve Dia 100 mm bh 1.00 -
- Pipa HDPE 100PN-10SDR 17 dia.100mm(4")SNI m 3.00 -
- Street Poth Medium bh 1.00 -
- Stub Flange 100mm Segmented bh 2.00 -
Sub Total III -
IV PEKERJAAN TAPPING
1- Galian Tanah Keras m3 45.00 -
- Urugan Tanah Kembali m3 45.00 -
- Pasang Pagar Pengaman Jalan Titik 5.00 -
- Dewatering dan Penerangan Ls 1.00 -
- Pemotongan dan penyambungan Pipa Unit 10.00 -
- Kehilangan air m3 2,511.61 -
Sub Total III -
V PEKERJAAN PEMBUATAN DUDUKAN PIPA
1 Dudukan Pipa Lengkap dia 300 mm dan dia 200 mm unit 54.00 -
2 Dudukan Pipa Lengkap dia 150 mm unit 54.00 -
Sub Total IV -
VI BIAYA SUPERVISI
1 Pekerjaan Supervisi Ls 1.00 -
sub Total V -