The document outlines an escalation process for identifying and resolving safety deviations (SDs) observed at work locations for the Haradh Hawiyah Field Gas Compression Project. SDs identified by safety staff or during management walkthroughs are reported daily from contractors to subcontractors. If the subcontractor cannot resolve an SD, it is escalated to the contractor, then to project management if needed, to ensure the SD is rectified and the issue is closed out.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
92 views1 page
TR Safety Deviation ESCALATION PROCESS
The document outlines an escalation process for identifying and resolving safety deviations (SDs) observed at work locations for the Haradh Hawiyah Field Gas Compression Project. SDs identified by safety staff or during management walkthroughs are reported daily from contractors to subcontractors. If the subcontractor cannot resolve an SD, it is escalated to the contractor, then to project management if needed, to ensure the SD is rectified and the issue is closed out.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1
Haradh Hawiyah Field Gas Compression Project (HHFGCP)
ESCALATION PROCESS
SD being reporing by means of Daily Safety
Observation I Identification of Safety Deviation Photografy & Observation Report (SD) at Work Location. (By Safety from Contractor to Subcontractor. N Staff, either Contractor and (it’s applicable for Daily Safety Contractor to SAPMT to Managemetn Subcontractor Contractor P Subcontractor, PMT & other staff) Observation and Management Walkthrought Walkthrought). U T
Contractor to notify to SAPMT Notify to
SAPMT, Contractor & Subcontractor Contractor to verify & acknowledge No Subcontractor Contractor to Conduct Management Close Our Report Walkthrought yes P Subcontractor to Contractor & SAPMT, Contractor & Subcontractor Contractor to Notify to SAPMT by Rectify and Subcontractor to R to identify Safety Deviation at the spot means of Mail Notification Subcontractor to notify Rectify O by Closed Out report to Contractor. C Contractor to consolidate Safety Contractor to verify SAPMT to verify No and Confirm the No E Deviation Report and notify by means No of Mail to Subcontractor and to Contractor to verify Acceptance of S SAPMT (it’s for Information) and Confirm the Subcontractor Close Acceptance of Out Report S yes Subcontractor Close Subcontractor to rectify and Out Report SAPMT to Verify Consolidate a Closed Out report, Subcontracotr to notify to Contractor yes yes by means of Mail.