100% found this document useful (2 votes)
198 views

Gas Turbine Order Data Sample

The document lists equipment projects with details about gas turbines, including the manufacturer, technology owner, EPC firms involved, execution style, customer, and unit details. There are over 20 gas turbine projects listed with specifications such as turbine class, size, model, fuel type, and configuration.

Uploaded by

sajjad_naghdi241
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
198 views

Gas Turbine Order Data Sample

The document lists equipment projects with details about gas turbines, including the manufacturer, technology owner, EPC firms involved, execution style, customer, and unit details. There are over 20 gas turbine projects listed with specifications such as turbine class, size, model, fuel type, and configuration.

Uploaded by

sajjad_naghdi241
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

PROJECTI EQUIPMENT TYPMANUFACTURER

068345 GAS TURBINE ANSALDO ENERGIA


071702 GAS TURBINE BAKER HUGHES GE
069384 GAS TURBINE GE POWER
071575 GAS TURBINE HUADIAN AERO TURBINES
071596 GAS TURBINE NANJING TURBINE CO.
071644 GAS TURBINE GT ENERGO
071506 GAS TURBINE KAZAN MOTOR PRODUCTION (KMPO)
071694 GAS TURBINE MAN ENERGY SOLUTIONS
071576 GAS TURBINE MAPNA TURBINE (TUGA)
071684 GAS TURBINE DONGFANG TURBINE WKS
071599 GAS TURBINE MITSUBISHI HITACHI PR SYS (MHPS)
071435 GAS TURBINE POWER MACHINES
071473 GAS TURBINE SIEMENS INDUSTRIAL TURBOMACHINE
040480 GAS TURBINE SIEMENS POWER GEN
071581 GAS TURBINE SOLAR
071651 GAS TURBINE NPO SATURN
071658 GAS TURBINE PERM ENGINE
071660 GAS TURBINE UMPO
071650 GAS TURBINE UNITED ENGINE CORPORATION
071643 GAS TURBINE ZORYA-MASHPROEKT
TECHNOLOGY OWNER EPCFIRM1 EPCFIRM2
ANSALDO ENERGIA ANSALDO ENERGIA
GENERAL ELECTRIC MODEC OFFSHORE
GENERAL ELECTRIC GENERAL ELECTRIC ASTRA EVANGELISTA SACI
GENERAL ELECTRIC NINGBO LVYUAN
GENERAL ELECTRIC
GT ENERGO STARK
KMPO
MAN ENERGY SOLUTIONS BONATTI
MAPNA TURBINE (TUGA) NATIONAL IRANIAN GAS (NIGC)
MITSUBISHI HITACHI PR SYS (MHPS) DONGFANG ELECTRIC
MITSUBISHI HITACHI PR SYS (MHPS) MITSUBISHI HITACHI PR SYS (MHPS)
SIEMENS POWER GEN SIEMENS POWER GEN ENKA INSAAT
SIEMENS POWER GEN MODEC OFFSHORE
SIEMENS POWER GEN HUADIAN ENGINEERING
SOLAR PTSC MECHANICAL & CONSTRUCTION
UNITED ENGINE CORPORATION UEC - GAS TURBINES
UNITED ENGINE CORPORATION NOVATEK
UNITED ENGINE CORPORATION UEC - GAS TURBINES
UNITED ENGINE CORPORATION UEC - GAS TURBINES
ZORYA-MASHPROEKT HARBIN GUANHAN GT CO (HGGT)
EPCFIRM3EPCFIRM4 EXECUTION STYLE
GT OEM AS EPC
EPC
ELISTA SACI GT OEM AS EPC / EPC CONSORTIUM
EPC

EPC

EPC
EPC
EPC
GT OEM AS EPC
GT OEM AS EPC / EPC CONSORTIUM
EPC
EPC
EPC
GT OEM AS EPC
EPC
GT OEM AS EPC
GT OEM AS EPC
EPC
CUSTOMER CUSTOMER TYP
SOCIETE TUNISIENNE DE L'ELECTRIC (STEG) UTILITY
PETROBRAS INDUSTRIAL
UGEN (MSU ENERGY) IPP
NINGBO LVYUAN NATURE GAS & POWER IPP
- UTILITY
NADEZHDA METALLURGICAL PLANT (NORILSK NICKEL) INDUSTRIAL
ARCTICGAS (NOVATEK, GAZPROM) IMD
PERTAMINA IMD
NATIONAL IRANIAN GAS (NIGC) IMD
HUADIAN PR INTL UTILITY
- INDUSTRIAL
NIZHNEKAMSKNEFTEKHIM - NKNK (TAIF GROUP) INDUSTRIAL
MODEC OFFSHORE IMD
BEIJING ENERGY INVESTMENT (BEIH) UTILITY
IDEMITSU KOSAN IMD
GAZPROM DOBYCHA YAMBURG INDUSTRIAL
NOVATEK IMD
GAZPROM IMD
GAZPROM IMD
PETROCHINA IMD
INDUSTRY TYPE

OIL & GAS (FPSO)

MINING (NICKEL)
OIL & GAS
OIL & GAS
OIL & GAS (PIPELINE)

OIL & GAS


CHEMICALS PROCESSING (SYNTHETIC RUBBER)
OIL & GAS (PETROBRAS LEASED FPSO)

OIL & GAS (COMPRESSOR TRAIN)


OIL & GAS (OILFIELD)
OIL & GAS (LNG PRO)
OIL & GAS (PIPELINE)
OIL & GAS (UNDERGROUND GAS STORAGE)
OIL & GAS
UNIT NAME/LOCATION
MORNAGUIA 1
LIBRA 2 (PILOT), MERO FIELD
BARKER 1, TANDIL, BENITO JUAREZ
LVYUAN 2, LUYUAN
SHENGZE 1
NADEZHDA 1
YARO YAKHINSKOGO 1, SAMBURGSKIY
MENZEL LEJMAT NORD 1 (MLN), GAS CAPACITY INCREASE PROJECT
DORAHAN CS 1
QINGYUAN 2, YINGDE
MHPS 2018 UNSITED #2 (TO BE DISCLOSED IN AUGUST, 2018)
NIZHNEKAMSK 1, TATARSTAN
SEPIA FIELD 2, SANTOS BASIN, OFFSHORE (PETROBRAS LEASE)
YUHU 3, LONGGANG, SHENZHEN
DAI NGUYET 1, OFFSHORE
KAMENNOMYSSKOYE 1
YAMALNEFTEGAZ 2
NORD STREAM 2, SHEKSNINSKAYA CS
KALININGRADSKOYE UGS 2
YANDUN CS 1, WEPP
STATE/PROVINCE/REGION COUNTRY WORLD REGION TYPE OF UNI
MABOUBA TUNISIA NORTH AFRICA GT
OFFSHORE BRAZIL LATIN AMERICA GT
BUENOS AIRES ARGENTINA LATIN AMERICA GT-CC
ZHEJIANG CHINA NORTH ASIA GT-CC
JIANGSU CHINA NORTH ASIA GT-CC
BASHKORTOSTAN RUSSIA EUROPE GT
ROSTOV RUSSIA EUROPE GT
ALGERIA NORTH AFRICA GT
KOHKILOYEH & BOYER AHM IRAN CENTRAL ASIA GT
SHANDONG CHINA NORTH ASIA GT-CC
CANADA NORTH AMERICA GT
TATARSTAN RUSSIA EUROPE GT-CC
OFFSHORE BRAZIL LATIN AMERICA GT
GUANGDONG CHINA NORTH ASIA GT-CC
OFFSHORE VIETNAM SOUTH ASIA GT
YAMALO-NENETS RUSSIA EUROPE GT
YAMALO-NENETS RUSSIA EUROPE GT
VOLOGDA RUSSIA EUROPE GT
KALININGRAD RUSSIA EUROPE GT
XINJIANG CHINA NORTH ASIA GT
PROJECT TYPE S-C, U S-C FLUID BED FIRING COGEN UNIT CAP QTY
325.0 2
34.0 4
UNFIRED 51.0 1
UNFIRED COGEN 54.0 1
DIST HEAT-CHP UNFIRED COGEN 81.0 2
DIST HEAT-CHP COGEN 3.0 4
16.0 2
6.0 2
25.0 4
DIST HEAT-CHP UNFIRED COGEN 324.0 1
COGEN 400.0 2
UNFIRED 187.0 2
37.4 2
UNFIRED COGEN 329.0 1
13.0 1
6.0 6
25.6 3
16.8 5
4.1 3
25.0 1
TOTAL CAPAWARD DATESHIP DATEOPER DATE FUEL1 FUEL2 FUEL3
650.0 04/01/18 09/01/18 06/01/16 GAS/NATURAL
136.0 06/01/18 06/01/19 03/01/21 GAS/NATURAL LIQUID
51.0 02/01/18 11/01/18 08/01/19 GAS/NATURAL
54.0 03/01/18 12/01/18 11/01/19 GAS/NATURAL
162.0 05/01/18 05/01/19 05/01/20 GAS/NATURAL
12.0 04/01/18 01/01/19 05/01/19 GAS/NATURAL
32.0 01/01/18 09/01/18 05/01/19 GAS/NATURAL
12.0 06/01/18 04/01/19 07/01/19 GAS/NATURAL
100.0 03/01/18 12/01/18 03/01/19 GAS/NATURAL
324.0 06/01/18 06/01/19 06/01/20 GAS/NATURAL
800.0 06/01/18 12/01/19 12/01/22 GAS/NATURAL
374.0 01/01/18 08/01/19 04/01/21 GAS/NATURAL
74.8 01/01/18 01/01/19 07/01/19 GAS/NATURAL
329.0 06/01/18 12/01/19 12/01/20 GAS/NATURAL
13.0 03/01/18 03/01/19 03/01/20 GAS/NATURAL
36.0 05/01/18 02/01/19 11/01/19 GAS/NATURAL
76.8 05/01/18 05/01/19 05/01/20 GAS/NATURAL
84.0 04/01/18 04/01/19 04/01/20 GAS/NATURAL
12.3 05/01/18 03/01/19 09/01/19 GAS/NATURAL
25.0 06/01/18 09/01/18 06/01/19 GAS/NATURAL
TURBINE CLASFRAME/AEROGT SIZE CATEGORYMODEL (FAMILYMODEL (DETAIL)DLE
F CLASS FRAME JUMBO AE94.3A AE94.3A YES
AERO AERO SMALL LM2500 LM2500+G4 SAC NO
AERO AERO SMALL LM6000 LM6000PC SPRINTNO
AERO AERO SMALL LM6000 LM6000PF NO
F CLASS FRAME SMALL 6F.03 6F.03 YES
OTHER FRAME FRAME X SMALL GT-009 GT-009 NO
AERO AERO X SMALL GCU-16 GCU-16, VOLGA NO
OTHER FRAME FRAME X SMALL THM 1304 THM 1304 YES
AERO AERO SMALL MGT30 MGT30 NO
F CLASS FRAME JUMBO M701F M701F YES
J CLASS FRAME JUMBO M501JAC M501JAC YES
E CLASS FRAME MEDIUM SGT5-2000E SGT5-2000E YES
AERO AERO SMALL SGT-A35 RB SGT-A35 RB NO
F CLASS FRAME JUMBO SGT5-4000F SGT5-4000F YES
OTHER FRAME FRAME X SMALL MARS MARS 100S YES
AERO AERO X SMALL GTD-6RM GTD-6RM NO
AERO AERO SMALL PS-90GP-25 PS-90GP-25 NO
AERO AERO X SMALL AL 31ST AL 31ST NO
AERO AERO X SMALL GPA-4RMP GPA-4RMP NO
AERO AERO SMALL UGT 25000 UGT 25000 NO
WET COMPRESSION 50 HZ / 60 HZCC CONFIG (GTXST
CC SHAFTPUBLIC REMARKS
NO 50
NO 60
YES 50 4X1 MULTI
NO 50 1X1 MULTI
NO 50 2X1 MULTI
NO 50
NO
NO
NO RE-SITED AND REDUCED BY ONE UNIT 7/18
NO 50 1X1 MULTI
NO 60
NO 50 2X1 MULTI
NO
NO 50 1X1 MULTI
NO
NO 50
NO
NO
NO
NO
GT LIST CAPACITY LAST MODIFIED DATE
07/13/18
07/25/18
48.4 04/18/18
42.3 04/30/18
81.0 06/15/18
3.0 07/09/18
04/19/18
07/24/18
DUCED BY ONE UNIT 7/18 07/31/18
379.3 07/13/18
370.0 07/25/18
187.0 04/18/18
04/17/18
329.0 07/24/18
04/30/18
07/09/18
07/10/18
07/10/18
07/09/18
07/09/18
COLUMN CAPTION DESCRIPTION
A PROJECT ID MCCOY CREATED IDENCIFICATION NUMBER FOR A DISTINCT PROJECT; A SINGLE PROJECT WILL INCLUDE ALL MAJOR PIECES THAT WE FOLLOW; GT-CC PROJECTS ARE GROUPED BY BLOCK
B EQUIPMENT TYPE/SERVICE TYPE OF EQUIPMENT OR SERVICE EACH COLUMN REPRESENTS
C MANUFACTURER USUALLY THE SAME AS TECHNOLOGY OWNER, BUT WHEN DIFFERENT, IT REPRESENTS THE LICENSEE, JV PARTNER, OR LEGACY MANUFACTURER
D TECHNOLOGY OWNER THE PARENT COMPANY THAT OWNS THE TECHNOLOGY BEING UTILIZED FOR A SPECIFIC EQUIPMENT PIECE
E EPC FIRM 1 UP TO FOUR FIRMS ARE NAMED THAT CONDUCT THE BULK OF THE ENGINEERING, PROCUREMENT, AND CONSTRUCTION OF A PROJECT
F EPC FIRM 2 UP TO FOUR FIRMS ARE NAMED THAT CONDUCT THE BULK OF THE ENGINEERING, PROCUREMENT, AND CONSTRUCTION OF A PROJECT
G EPC FIRM 3 UP TO FOUR FIRMS ARE NAMED THAT CONDUCT THE BULK OF THE ENGINEERING, PROCUREMENT, AND CONSTRUCTION OF A PROJECT
H EPC FIRM 4 UP TO FOUR FIRMS ARE NAMED THAT CONDUCT THE BULK OF THE ENGINEERING, PROCUREMENT, AND CONSTRUCTION OF A PROJECT
I EPC EXECUTION THE WAY NAMED EPC PARTICIPANTS INTERACT WITH THE PROJECT (EPC, EPC CONSORTIUM, GT OEM AS EPC, ETC.)
J CUSTOMER THE OWNER OF THE POWER PLANT ASSET THAT PRODUCES THE POWER GEN
K CUSTOMER TYPE A DESCRIPTION OF THE CUSTOMER (IPP, UTILITY, INDUSTRIAL), OR A DESCRIPTION OF THE APPLICATION (IMD)
L INDUSTRY TYPE (WHEN RELEVANT) THE TYPE OF INDUSTRY OF THAT SPECIFIC PROJECT APPLICATION; NOT NECESSARILY THE GENERAL INDUSTRY OF THE CUSTOMER
M UNIT NAME/LOCATION GEOGRAPHIC LOCATION OR NAME OF PROJECT
N STATE/PROVINCE/REGION GENERAL GEOGRAPHIC LOCATION OF THE PROJECT
O COUNTRY COUNTRY
P WORLD REGION WORLD REGION
Q TYPE OF UNIT FOSSIL (MOSTLY COAL OR OIL), GT (SIMPLE CYCLE), GT-CC (COMBINED CYCLE), BIOMASS, SOLAR (SOLAR THERMAL), GEO (GEOTHERMAL), WTE, WASTE HEAT, MISC
R PROJECT TYPE PROJECT APPLICATION WHEN THE PROJECT IS NOT EXCLUSIVELY FOR POWER GEN (DESAL, CHP, ETC)
S S-C, U S-C BOILER / STEAM TURBINE RELATED: TECHNOLOGY DENOTING CERTAIN STEAM PRESSURE PARAMETERS
T FLUID BED BOILER RELATED: FLUID BED (FB), BUBBLIZING FLUID BED (BFB), CIRCULATING FLUID BED (CFB), ETC.
U FIRING HSRG RELATED: IF A UNIT PULLS ADDITIONAL FUEL IN ORDER TO FIRE AT HIGHER CAPACITIES THAN THEORETICALLY POSSIBLE IN STANDARD COMBINED CYCLE SETTINGS
V COGEN A PROJECT THAT HAS MULTIPLE FUNCTIONS FOR THE USEFUL ENERGY (CHP, DESAL, ETC)
W UNIT CAP CAPACITY OF THE SPECIFIC UNIT; FOR HRSGS, 50% OF GT IN COGEN APPLICATION AND EQUAL TO ST CAPACITY IN CC; CHANGED IN 2015 TO 50% OF MODEL LIST CAPACITY (SEE AR BELOW)
X QTY NUMBER OF UNITS
Y TOTAL CAP COMBINED CAPACITY OF ALL THE UNTS
Z AWARD DATE THE DATE WHEN FULL NOTICE TO PROCEED (FNTP) WAS RECEIVED BY THE MANUFACTURER
AA SHIP DATE ESTAIMED DATE THE UNIT WAS SHIPPED FROM THE FACTORY
AB OPER DATE SURVEYED DATE WHEN THE MANUFACTURER ORGINALLY ANTICIPATED THE COMMERCIAL OPERATION OF THE UNIT
AC FUEL 1 PRIMARY FUEL (AS ANTICIPATED WHEN FNTP DECLAIRED)
AD FUEL 2 SECONDARY FUEL (AS ANTICIPATED WHEN FNTP DECLAIRED)
AE FUEL 3 TERTIARY FUEL (AS ANTICIPATED WHEN FNTP DECLAIRED)
AF TURBINE CLASS GAS TURBINE RELATED: THE FIRING TEMPERATURES ACHIEVED BY GAS TURBINES, AS GENERALLY ACCEPTED BY THE MARKET
AG FRAME/AERO GAS TURBINE RELATED: LEGACY TECHNOLOGY DERIVATION OF THE UNIT
AH GT/HRSG SIZE CATEGORY GAS TURBINE / HRSG RELATED: X SMALL (3-19.9 MWE), SMALL (20-99.9 MWE), MEDIUM (100-214.9 MWE), LARGE (215-299.9 MWE) OR JUMBO (300 MWE +); FOR HRSG, 50% OF THOSE SAME MEASURES
AI MODEL (FAMILY) GAS TURBINE RELATED: THE MOST GENERAL TERM APPLIED TO A CATEGORY OF GAS TURBINE, OR THE NAME OF THE MODEL ORIGINALLY DECLARED TO MCCOY
AJ MODEL (DETAIL) GAS TURBINE RELATED: THE MOST RECENT TERM APPLIED TO A MODEL, WITH AS MUCH DESCRIPTION AS POSSIBLE
AK DLE GAS TURBINE RELATIED: DRY LOW EMISSIONS OR DRY LOW NOX, REDUCED NOX EMSSION STANDARDS
AL WET COMPRESSION GAS TURBIEN RELATED: MISTING OR WATER INTRODUCED INTO THE TUBINE UNIT TO CREATE EFFICIENCIES
AM 50 HZ / 60 HZ ELECTRICITY TRANSMISSION STANDARD FOR THE UNIT
AN CC CONFIG (GTXST) COMBINED CYCLE RELATED: THE NUMBER OF GAS TURBINES X NUMBER OF STEAM TURBINES; NUMBER OF STEAM TURBINES SHOULD BE ONE UNLESS ITS 3X2, 5X2, ETC
AO CC SHAFT COMBINED CYCLE RELATED: EITHER "SINGLE" DENOTING ONE SHAFT OR "MULTIPLE" DENOTING TWO OR MORE SHAFTS
AP PUBLIC REMARKS QUICK STATEMENTS WHEN AN ITEM RISES TO A DISCLOSURE THRESHOLD
AQ GT MODEL LIST CAPACITY THE LIST CAPACITY OF GT UNIT ON WHICH THE HRSG UNIT WILL OPERATE ACCORDING TO THE GTW'S 2015 GAS TURBINE SPECS
AR LAST MODIFIED DATE DATE WHAN PROJECT OR UNIT DATA WAS LASTED ALTERED OR CHANGED FOR ANY REASON

You might also like