Daily Progress Report-R

The daily progress report summarizes the work completed on the Panorama Hills housing project in Vishakapatnam. It provides details on excavation and concrete work completed for the underground sump and overhead water tank. Staffing information is also included, listing the number of project managers, engineers, supervisors and other staff currently working on site, as well as manpower details and work allocation. The report was generated to provide a status update on the construction project's daily activities.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
2K views1 page

Daily Progress Report-R

The daily progress report summarizes the work completed on the Panorama Hills housing project in Vishakapatnam. It provides details on excavation and concrete work completed for the underground sump and overhead water tank. Staffing information is also included, listing the number of project managers, engineers, supervisors and other staff currently working on site, as well as manpower details and work allocation. The report was generated to provide a status update on the construction project's daily activities.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Project : Panorama Hills, Vishakapatnam Client : M/s.

GLOBAL ENTROPOLIS ASIA PVT LTD


DAILY PROGRESS REPORT

PROJECT : Panorama Hills, Vishakapatnam


DAILY PROGRESS REPORT OF : Dt.
WEATHER CONDITIONS :
DATE OF COMMENCEMENT :
DATE OF COMPLETION (REVISED) :
TOTAL DAYS :
DAYS COMPLETED :
DAYS LEFT : 0
A. DAY'S ACTIVITIES Upto Today previous day Today
Sl. Planned Achieve Planned
Description Unit Total scope Completed Balance Location Remarks
No Qty d Qty Qty
A. U G SUMP:
1 Excavation Cum
2 PCC Cum
B OVER HEAD TANK:
1 Excavation Cum
2 PCC Cum
3 Reinforcement fixing MT
4 RCC Raft Cum
5 RCC WALL Cum
6
7
D GROUND LEVEL SUMPS
1 Excavation Cum
2 PCC Cum 0 0

B. STAFF STATUS AS ON Today


S.No Description
1 Project Manager
2 Senior Engineers
3 Junior Engineers & Asst.Engg
4 Supervisors/Accounts/Stores
8 Others
Total

C. MANPOWER DETAILS AND ALLOCATION AS


Today
ON
.
WORK SS CONST.
MASO
UNSKILLED OTHERS
N
1 EXCAVATION
2 PCC & RCC
3 REINFORCEMENT
4 SHUTTERING
8 OTHERS
TOTAL ON SITE 0 0 0

Site Engineer Project Manager