0% found this document useful (0 votes)
138 views

CT2 Total Engineering Quality Management - 18MBO401T

Svabaj bdshaj hdhaja hdhsaj hdhsjs hdshjs hdhssj hdhsjs dhshsj dhsjsj dhshsj sjsjao skakxovjdj dhsj z jsiskshz xhsjai hxjsja hsjaja

Uploaded by

Madhav Chablani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
138 views

CT2 Total Engineering Quality Management - 18MBO401T

Svabaj bdshaj hdhaja hdhsaj hdhsjs hdshjs hdhssj hdhsjs dhshsj dhsjsj dhshsj sjsjao skakxovjdj dhsj z jsiskshz xhsjai hxjsja hsjaja

Uploaded by

Madhav Chablani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

4/10/2021 CT2 Total Engineering Quality Management/18MBO401T

CT2 Total Engineering Quality


Management/18MBO401T

PART A : 20 *1= 20 marks

……………………..is a series of actions by which quality products are delivered 1 point

to the customers.

Valuestream

JIT

Lean Management

Six Sigma

Clear selection

………………………is manufacturing of an item before its demand 1 point

Inventory

Overproduction

Value stream

Over processing

Clear selection

https://docs.google.com/forms/d/e/1FAIpQLSd1ddXht4_9k3bY56cMk1WTPKp36J6Sf8plcLWf6p-1Mp3naQ/formResponse 1/8
4/10/2021 CT2 Total Engineering Quality Management/18MBO401T

…………………………..are the mistakes and errors in a process that requires 1 point

working

Defectives

Conformance

Defects

Rejects

Clear selection

“Takt” means…………………….. 1 point

Heart beat

Pulse

Sweep

Sort

Clear selection

Kanban is a …………………….system 1 point

Operating

Production

Routing
https://docs.google.com/forms/d/e/1FAIpQLSd1ddXht4_9k3bY56cMk1WTPKp36J6Sf8plcLWf6p-1Mp3naQ/formResponse 2/8
4/10/2021 CT2 Total Engineering Quality Management/18MBO401T

Scheduling

Clear selection

…………………………….maintenance implies that repairs are made after the 1 point


failure of machine or equipment

Corrective or breakdown

Scheduled

Preventive

Predictive

Clear selection

………………………….pillar focuses on zero accidents, zero fires in TPM 1 point

Jishu Hozen

Safety, Health and environment

Planned maintenance

Development management

Clear selection

…………………………….TPM focuses on improving productivity and infusing 1 point

efficiency in the administration

Kobetsu Kaizen

Education and training

https://docs.google.com/forms/d/e/1FAIpQLSd1ddXht4_9k3bY56cMk1WTPKp36J6Sf8plcLWf6p-1Mp3naQ/formResponse 3/8
4/10/2021 CT2 Total Engineering Quality Management/18MBO401T

Office

Development management

Clear selection

…………………….means automation with Human Intervention 1 point

5S

Jidoka

SMED

Heijunka

Clear selection

…………………………………..reduces change over and start-up time by eliminating 1 point


non-valued activities

5S

Jidoka

SMED

Heijunka

Clear selection

...………….are what customer sees and feels 1 point

Defective

Variations

Error
https://docs.google.com/forms/d/e/1FAIpQLSd1ddXht4_9k3bY56cMk1WTPKp36J6Sf8plcLWf6p-1Mp3naQ/formResponse 4/8
4/10/2021 CT2 Total Engineering Quality Management/18MBO401T

Defect

Clear selection

……………………………is a data-driven approach 1 point

SixSigma

TPM

Lean Manufacturing

JIT

Clear selection

………………………….sigma level is 33 DPMO 1 point

6.5

5.50

Clear selection

………………….is an introductory training in the fundamentals of six sigma 1 point

Master black belt

Black belt

Green belt

Yellow belt
https://docs.google.com/forms/d/e/1FAIpQLSd1ddXht4_9k3bY56cMk1WTPKp36J6Sf8plcLWf6p-1Mp3naQ/formResponse 5/8
4/10/2021 CT2 Total Engineering Quality Management/18MBO401T
Yellow belt

Clear selection

……………………..are project leaders capable of forming and facilitating six 1 point

sigma teams

Black belt

Sponsors

Green belt

Yellow belt

Clear selection

………………….. Is the assessment of the seriousness of the failure effect? 1 point

Severity

Detection

Occurrence

RPN

Clear selection

…………………………..is an assessment of the likelihood that the current controls 1 point

will detect the cause of failure

Occurrence

Detection

RPN
https://docs.google.com/forms/d/e/1FAIpQLSd1ddXht4_9k3bY56cMk1WTPKp36J6Sf8plcLWf6p-1Mp3naQ/formResponse 6/8
4/10/2021 CT2 Total Engineering Quality Management/18MBO401T
RPN

Severity

Clear selection

……………………………. Is the amount of cost included in the product to enhance 1 point


its customers' appeal?

Exchange value

Esteem Value

Fast technique

Cost value

Clear selection

…………………. Is a set of procedure for reducing the number of parts in a 1 point

component?

Design for assembly

Modular design

Design for manufacturer

Design of experiment

Clear selection

………………….. Aims at determining specification setting for a product and 1 point


process parameter

Design assurance

Design of experiments
https://docs.google.com/forms/d/e/1FAIpQLSd1ddXht4_9k3bY56cMk1WTPKp36J6Sf8plcLWf6p-1Mp3naQ/formResponse 7/8
4/10/2021 CT2 Total Engineering Quality Management/18MBO401T
Design of experiments

Design validity

Degree of robustness

Clear selection

Back Next

Never submit passwords through Google Forms.

This form was created inside of SRM Institute of Science and Technology. Report Abuse

 Forms

https://docs.google.com/forms/d/e/1FAIpQLSd1ddXht4_9k3bY56cMk1WTPKp36J6Sf8plcLWf6p-1Mp3naQ/formResponse 8/8

You might also like