Annex A Report of The Project EngineerCPAF NOV 16 2020
Annex A Report of The Project EngineerCPAF NOV 16 2020
Manpower 9 - Workers
1 - Foreman
4 -Skilled
4 - Laborers
Previous Activities:
On-going Activities:
- Tile works
- Electrical roughing-ins
Projected Activities:
- Installation of ACU
- Installation of dry wall partition
Submitted by: