Time Variance DPWH Field Engineers Training Participant - S
Time Variance DPWH Field Engineers Training Participant - S
30
360 30
Substantial change in the quantity of an item
of work
Non-
acquisition
Shortage of Peace and General
of Permit
Construction Order Labor
Materials
to Enter
Problem Strikes
within the
ROW
Standard Forms
Required Documents
Prescribed Timeframe
Required Documents
Prescribed Timeframe
Required Documents
Prescribed Timeframe
Monthly Time Suspension
Request for Contract Time
Report for May and June has
Extension No. 1 due to
25 suspended days due to
unfavorable weather condition
heavy rain
(May and June)
Instead, prepare a
Monthly Time
Suspension
Report.
To be approved by the
Head of the Implementing
Office
DO 144 S. 2016
Numbering of Work Suspension Order
WSO No. 1 WSO No. 2
DO 144 S. 2016
Numbering of Continuance of Work Suspension Order
60 cd 30 cd
Expiry Da
Effectivity
of contract
PD A/SEC U/SEC
DO 144 S. 2
All Resume Orders shall be approved by
the Head of the Implementing Office
PD
Expiry Date
Effectivity
of contract PD A/SEC U/SEC
Pre-Determined
Month Unworkable Based on the MTSR for the month of
Days June, there are 20 cd which are
June 5 found to be unworkable days. Should
July 5 the PE recommend to the Head of IO
August 5 for a Contract Time Extension
September 5 equivalent to 15 cd due to
October 5 unworkable days? Why Or why not?
November 5
Total 30 cd
60 cd 30 cd
DO 144 S. 2016
Time Variance Work Suspension Order
To be prepared by the
Implementing office
DO 144 S. 2016
Time Variance Work Suspension Order
Contractor Letter Request
The contractor’s
letterhead
The date that the
letter was prepared
The date that the
contractor is
requesting for Work
Suspension
The circumstances
surrounding the request
for Work Suspension
The legal basis for the
request (RA/GCC/SCC/DO)
Time Variance Work Suspension Order
Straight Line Diagram showing the critical
Contractor activities affected (indicate the project
limits/stations)
Pictures should
show:
To be prepared by
the PE of the
contractor and
noted/ checked
by the PE of the
Implementing Office
Time Variance Work Suspension Order
Due to Rainy/ Certified Copy of Project
Contractor Unworkable Logbook (Date of Suspension)
Days
Pictures should
show:
Pictures should
show:
NAME OF OFFICIAL
Time Variance Work Suspension Order
Implementing Executive Summary
Office
Executive Summary Dots.No.: CW-RO-201806-000456
(Request for approval of WSO No. 1)
June 28, 2018
FOR : (Approving Official)
THRU : (Next Ranking Official) Executive Summary
(Request for Approval of WSO No. 1)
1.SUBJECT : (Name of Project)
2.Action Recommended: FOR : Regional Director Juan M. Dela Cruz
3.Implementing Office
4.Reviewing Office THRU : Asst. Regional Director Juana B. Dela Cruz
5.Reason for this Request
6.Contractor 1.SUBJECT : Rehabilitation of Poblacion Road
7.Contractual Data K020+100 – K023+100, Bataan
8.Physical Accomplishment
9.Remarks 2.Action Recommended: For approval
NAME OF OFFICIAL
Time Variance Work Suspension Order
Implementing Project/Consultant Engineer’s Report relative to
Office the request for contract time extension
Letterhead
June 26, 2018
PROJECT ENGINEER’S REPORT
Subject: Request for Work Suspension Order No. 1 for the Rehabilitation of Poblacion Road
K020+100 – K023+100, Bataan
This refers to the request of the contractor for Work Suspension Order No. 1 effective June 25, 2018
due to RROW Problems. Please be informed that there are no more workable area at the project site as
shown in the straight line diagram since the affected stakeholders did not allow the entry of the
contractor in their properties unless payment has been made by the contractor to the said stakeholders.
A Permit to Enter was sent to these affected owners prior to the date of suspension and all of them
refused to sign nor acknowledge receipt thereof due to reasons mentioned earlier. Further, a letter was
already forwarded to the Punong Barangay requesting for assistance in the negotiations thereof for the
resolution of the RROW problem.
In view of the foregoing, this Proposed Work Suspension Order No. 1 is hereby recommended for
approval.
Request of the contractor > findings/observations >
CARDO L. DALISAY action/s taken > recommendation
Project Engineer
Time Variance Work Suspension Order
Implementing Evaluation/Recommendation with justification
Office from the Implementing Office/Consultant of the
requested time extension
Letterhead
Evaluation/Recommendation with Justification
Subject: Request for Work Suspension Order No. 1 for the Rehabilitation of Poblacion Road
K020+100 – K023+100, Bataan
Upon evaluation of the submitted documents pertinent to this request of the contractor, this Office finds
merit on the circumstances surrounding this project considering also the preponderance of evidence
anent thereto and the verification made by our personnel and is hereby recommending for the approval
of this proposed Suspension Order No. 1 effective June 25, 2018.
As provided under Section 9.2.a of the Revised IRR of RA 9184, the contractor has the right to suspend
the construction activities due to Road Right of Way Problem that exists in the project site which
prohibit them in implementing the project.
Result of evaluation > recommendation (with legal basis)
MARIA LOURDES K. EUSEBIO
District Engineer
Time Variance Work Suspension Order
Letters/Communications/Minutes of the Meetings
Implementing made between the Implementing Office,
Office
Contractors and Other Concerned Parties
Time Variance Work Suspension Order
Chronology of Events from the start until the
Resolution of the problem (if any). It should
Implementing contain the efforts made by the Implementing Office
Office in order to resolve the problem and resume the
implementation of the Projects at the soonest
possible time
February 5, 2018 IO and Contractor Forwarded a letter to the utility company requesting for the
relocation of the electrical posts and wires
February 12, 2018 Utility Company Responded to the request and said that the relocation will be made on
March 28, 2018
February 19, 2018 Contractor/IO/ Conducted site inspection and coordination for the scheduled
Utility Company relocation of affected electrical posts and wires
February 20, 2018 Contractor Requested for WSO No. 1 pending the relocation of affected electrical
posts and wires
Time Variance Work Suspension Order
Implementing
Due to Rainy/ Project Weather Chart duly
Office Unworkable signed by the Project/Resident
Days Engineer
Project Weather
Chart should be:
Duly signed by
the PI and the PE
Color coded
Consistent with
the logbook
Time Variance Work Suspension Order
Implementing
Due to Road Copy of approved Parcellary
Office Right-of-Way Survey/ROW Plan showing the
Problem affected lots and improvements
Parcellay/ROW Plan
should show:
Duly acknowledged by
the affected owners
(if signed)
Remarks should be
indicated e.g. did
not receive, if the
affected owners did
not sign
Date of issuance
should be clearly
indicated
Time Variance Work Suspension Order
Due to non- Certification from the
Implementing availability of Implementing Office that non-
Office Construction availability of Construction
Materials Materials has occurred
C E R T I F I C A T I O N
To be signed by the
This is to certify that the non-availability Project Engineer and
of construction materials in our jurisdiction the District
particularly (Cement/Aggregates etc.) Engineer (for DEO)/
to be signed by the
occurred on (Date of non-availability) Project Engineer and
thereby rendering the contractor unable to the Regional
perform the work items that are noted to be Director (for RO)
in the critical path.
C E R T I F I C A T I O N To be signed by the
Project Engineer and
the District
This is to certify that the distance/location Engineer (for DEO)/
of the nearest supplier (Name of Supplier and to be signed by the
address) of aggregates to the project site is Project Engineer and
the Regional
50 kilometers. Director (for RO)
To be submitted by the IO
DO 148 S. 2018
Time Variance Work Resumption Order
Contractor Letter Request
DO 148 S. 2018
Time Variance Work Resumption Order
Implementing Executive Summary
Office
Executive Summary The approval of Executive Summary for Work Resumption
Order is not necessary since the approving official
(Proposed RO No. 1) should only sign the proposed Resume Order should the
approving official finds merit in the submitted request.
FOR : (Approving Official)
THRU : (Next Ranking Official)
It should be signed by the following officials:
Official who should sign the
1.SUBJECT : (Name of Project) Official who will Approve the WRO
Executive Summary
2.Action Recommended: District Engineer Chief, Construction Section
3.Implementing Office Regional Director Chief, Construction Division
4.Reviewing Office
5.Reason for this Request
6.Contractor
7.Contractual Data
8.Physical Accomplishment
9.Remarks
NAME OF OFFICIAL
Time Variance Work Resumption Order
Implementing proposed Resume Order in accordance with the
Office Format per DO 144 S. 2016
Time Variance Work Resumption Order
Implementing Project/Consultant Engineer’s Report relative
Office to the resolution of the problem which caused
the issuance of suspension order
Letterhead
JUANITO L. DALISAY
Project Engineer
Time Variance Contract Time Extension
DO 148 S. 2018
To be prepared by the IO
DO 148 S. 2018
Time Variance Contract Time Extension
Contractor Letter request of the Contractor for Contract
Time Extension
The contractor’s
letterhead
The date that the
letter was prepared
The number of calendar
days being requested
for contract time
extension
The inclusive dates/
covering period of the
said extension
The circumstances
surrounding the request
for Contract Time
Extension
The legal basis for the
request (RA/GCC/SCC/DO)
Time Variance Contract Time Extension
Contractor Sworn Contractor’s Quit Claim
Time Variance Contract Time Extension
Implementing Executive Summary
Office
Executive Summary The Executive Summary for Contract Time Extension should
(Request for approval of CTE No. 1) be approved by the authorized approving official should
it finds merit on the submitted request. This will serve
as the Official Document as a Contract Time Extension.
FOR : (Approving Official)
THRU : (Next Ranking Official) It should be signed by the following officials(Suggestion):
NAME OF OFFICIAL
Time Variance Contract Time Extension
Implementing Executive Summary
Office
Executive Summary DoTS No. CW-CO-201702-00291
January 25, 2018
(Request for approval of CTE No. 1)
EXECUTIVE SUMMARY
[Request for approval of Contract Time Extension No. 1]
FOR : (Approving Official)
THRU : (Next Ranking Official) FOR : Regional Director JUAN C. DALISAY
DPWH-Region VIII
1.SUBJECT : (Name of Project)
THRU : Asst. Regional Director JUANA M. DALISAY
2.Action Recommended:
1. SUBJECT : Request for approval of Contract Time
3.Implementing Office
Extension No. 1 for Rehabilitation/
4.Reviewing Office
Reconstruction of Daang Maharlika,
5.Reason for this Request K480+500 – K495+900, Ormoc, Leyte
6.Contractor
2. Action Recommended : For Approval
7.Contractual Data
3. Implementing Office : DPWH – Leyte II District Engineering
8.Physical Accomplishment
Office, Region VIII
9.Remarks
4. Reviewing Offices : LSDEO
APPROVING OFFICIAL
Time Variance Contract Time Extension
Implementing Executive Summary
Office
Why
Executive Summary 5. Reason for this Request:
(Request for approval of CTE No. 1)
The contractor, MWJ CONSTRUCTION/VIGUZ CONSTRUCTION
FOR : (Approving Official) CORP. (JV) in its letter dated September 3, 2018 requested for
approval of Contract Time Extension No. 1 due to work suspensions
THRU : (Next Ranking Official)
covering the period from July 1, 2018 to August 31, 2018 or
equivalent to thirty (30) calendar days .
1.SUBJECT : (Name of Project)
2.Action Recommended: The Chief of Construction Section, LSDEO, per Memorandum dated
3.Implementing Office September 7, 2018 (Annex “3.8”) addressed to the District
4.Reviewing Office Engineer, forwarded for consideration and approval, the request for
5.Reason for this Request Contract Time Extension No. 1 equivalent to thirty (30) calendar days
6.Contractor covering the period from July 1, 2018 to August 31, 2018 due to
7.Contractual Data intermittent rainy/unworkable days pursuant to DO 106 S. 2018 and
DO 144 S. of 2016.
8.Physical Accomplishment
9.Remarks
What/
APPROVING OFFICIAL Findings
Time Variance Contract Time Extension
Implementing Executive Summary
Office
Executive Summary 5. Reason for this Request:
(Request for approval of CTE No. 1)
Hereunder is the tabulated rainy/unworkable days for the period of
FOR : (Approving Official) July to October 2016 based on the approved Monthly Time
Suspension Reports (Annex “3.11”).
THRU : (Next Ranking Official)
Unworkable Days as requested by
Dates
1.SUBJECT : (Name of Project) the contractor
2.Action Recommended: July 2018 17
August 2018 13
3.Implementing Office
Total 30
4.Reviewing Office
5.Reason for this Request
6.Contractor
7.Contractual Data
8.Physical Accomplishment
9.Remarks
APPROVING OFFICIAL
Time Variance Contract Time Extension
Implementing Executive Summary
Office
Executive Summary 6. Contractor: MWJ CONSTRUCTION/VIGUZ CONSTRUCTION
(Request for approval of CTE No. 1) CORP. (JV)
7. Contractual Data
FOR : (Approving Official) ORIGINAL REVISED
7.1 Original Contract Amount P 35,782,240.02
THRU : (Next Ranking Official) 7.2 Original Contract Duration 180 c.d.
7.3 Effectivity of Contract June 1, 2018
1.SUBJECT : (Name of Project) 7.4 Original Expiry Date November 27, 2018
APPROVING OFFICIAL
Time Variance Contract Time Extension
Implementing Executive Summary
Office
Executive Summary 8. Physical Accomplishment as of August 31, 2018
(Request for approval of CTE No. 1) Scheduled : 50.00 %
Findings of
Actual : 55.0 % the reviewing
FOR : (Approving Official) Slippage : (+) 5.0 % office, Legal
THRU : (Next Ranking Official) Basis
9. Remarks
1.SUBJECT : (Name of Project) On the basis of the submitted documents indicated in the Checklist
2.Action Recommended: (Annex “3.22”), this Office finds this request for Contract Time
3.Implementing Office Extension No. 1, equivalent to thirty (30) calendar days to be
4.Reviewing Office meritorious since the delayed implementation of the project due to
5.Reason for this Request intermittent rainy/unworkable days is not the fault of the contractor
6.Contractor and beyond the control of the Implementing Office. The said request
7.Contractual Data is in accordance with the provision of Sub-Section 10.3 and 10.5 of
Annex “E” of the Revised IRR of R.A. 9184, to quote:
8.Physical Accomplishment
9.Remarks Sub-Section 10.3 – “Extension of contract time may be granted only
when the affected activities fall within the critical path of PERT/CPM
APPROVING OFFICIAL Network Diagram”
Time Variance Contract Time Extension
Implementing Executive Summary
Office
Executive Summary 9. Remarks: (Continuation)
(Request for approval of CTE No. 1)
Sub-Section 10.5 – “Extension of contract time shall be granted for
FOR : (Approving Official) rainy/unworkable days considered unfavorable for the prosecution of
THRU : (Next Ranking Official) the works at the site, based on the actual conditions obtained at the
site … and other meritorious causes as determined by the
Government’s authorized Engineer and approved by the procuring
1.SUBJECT : (Name of Project) entity … among others … The written consent of bondsmen must be
2.Action Recommended: attached to any request of the contract time and submitted to the
3.Implementing Office procuring entity for consideration and the validity of the performance
4.Reviewing Office security shall be correspondingly extended.”
5.Reason for this Request
6.Contractor Although, this Office finds the request for Contract Time Extension
7.Contractual Data No. 1 to be meritorious, the rainfall data gathered from Pag-Asa
Weather Chart is inconsistent with the Monthly Time Suspension
8.Physical Accomplishment
Reports, Weather Chart, and Project Logbook. Likewise, per undated
9.Remarks Certification of the Project Engineer, the distance from the project site
to PAGASA Station is approximately 80 kilometers away, which
APPROVING OFFICIAL appears to be far from the project site.
Time Variance Contract Time Extension
Implementing Executive Summary
Office Critical
Activities
Executive Summary 9. Remarks: (Continuation)
Affected
(Request for approval of CTE No. 1)
Based on the latest approved PERT/CPM Network Diagram (Annex
FOR : (Approving Official) “3.15”), the critical activities affected which fall along the critical
path, i.e. Item 101(2) Removal of Existing Bridge, Items
THRU : (Next Ranking Official)
400(17)c,400(24)c-Bored Piles, 1.2 dia. Items 400(24)d,400(24)d-
Bored Piles, 1.5 dia., Item 405(a)-Structural Concrete Class “A” (Minor
1.SUBJECT : (Name of Project) Structures), Item 405(b)-Structural Concrete,fc’=27 Mpa, Spcl II-
2.Action Recommended: Coco Craneway, Item 311(1)a.5-PCCP, 0.28m (Plain Conventional
3.Implementing Office Method), Item 311(2)-PCCP, 0.28m (Reinforced) and Item 505(5)-
4.Reviewing Office Grouted Riprap.
5.Reason for this Request
6.Contractor With this proposed Contract Time Extension No. 1, the contractor has
7.Contractual Data executed an Affidavit of Quit Claim (Annex “3.16”) that they will not
file any monetary/financial claim.
8.Physical Accomplishment
9.Remarks
APPROVING OFFICIAL
Time Variance Contract Time Extension
Implementing Executive Summary
Office
Executive Summary 9. Remarks: (Continuation)
(Request for approval of CTE No. 1)
In view of the above premises, the request for Contract Time
FOR : (Approving Official) Extension No. 1 equivalent to thirty (30) calendar days is respectfully
recommended pursuant to D.O. No. 144, Series of 2016 and DO 106
THRU : (Next Ranking Official)
Series of 2018, for the Regional Director’s consideration and
approval, subject however to the condition that the written
1.SUBJECT : (Name of Project) consent of bondsmen must be submitted and the validity of
2.Action Recommended: the performance security shall be correspondingly extended
3.Implementing Office in accordance with the above mentioned provision of Sub-
4.Reviewing Office Section 10.5 of Annex E of the Revise IRR of R.A . 9184
5.Reason for this Request
6.Contractor RICARDO P. DALISAY
7.Contractual Data District Engineer
8.Physical Accomplishment Recommendation of
APPROVED:
9.Remarks the official
recommending the
RAMONITO C. SANTOS request
APPROVING OFFICIAL Regional Director
Time Variance Contract Time Extension
Certification from the
Implementing Office/Consultant
Implementing
Due to Rainy/ stating the balance of pre-
Office Unworkable determined rainy/unworkable
Days days as provided in the
original contract or same has
been exhausted
Time Variance Contract Time Extension
Certification from the
Implementing Office stating
Implementing
Due to Rainy/ the distance of the PAGASA
Office Unworkable weather station from
Days
the Project site (signed by
the Project Engineer)
End of Presentation!