Test #2
Test #2
DATE AND TIME: 14th July 2018; 13:00 hrs DURATION: 90 mins
(3 marks)
A generating station has a peak demand of 120 MW and its connected load
is 200 MW. The energy produced annually is 4x106 MWhr. Determine:
(i) Load factor
(ii) Demand factor
EMD 3202