Problem (Main Particulars.) : Freeboard Calculation Above 100m in Length

This document calculates the freeboard for a 120m dry cargo ship. It determines the tabular freeboard is 1.70872m based on linear interpolation in the freeboard table. Corrections are made for block coefficient, depth, superstructure, and sheer profile. The minimum summer freeboard is determined to be 1965.48601mm and minimum bow height is 4981.22mm for ships under 250m in length.

Uploaded by

Md. Omar Faruk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
117 views10 pages

Problem (Main Particulars.) : Freeboard Calculation Above 100m in Length

This document calculates the freeboard for a 120m dry cargo ship. It determines the tabular freeboard is 1.70872m based on linear interpolation in the freeboard table. Corrections are made for block coefficient, depth, superstructure, and sheer profile. The minimum summer freeboard is determined to be 1965.48601mm and minimum bow height is 4981.22mm for ships under 250m in length.

Uploaded by

Md. Omar Faruk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Freeboard calculation above 100m in length.

Problem (Main Particulars.)

Ship type Dry cargo, B


𝐿_𝑏 120
𝑝
B 19.5
D 10
Lwl @ 0.85D 126
Thickness of deck plating 0.025
Cb @ 0.85D 0.722
TPC 9
Density 1.025

Superstructure
Name Length Height
Poop deck 23.16 2.6
Raised quarter deck 21.4 1.5
Forecastle deck 13 2.8

Sheer profile in meter


AP L/6 L/3 L/2 2L/3 5L/6 FP
0.75 0.34 0.085 0 0.3 1.2 2.5

Solution:

Freeboard Length, 𝑳_𝒇


𝐿_𝑓 = 96% of Lwl 120.96 m 0.12096 mm

Freeboard depth, 𝑫_𝒇


𝐷_𝑓 10.025 m 0.010025 mm

Tabular Freeboard value, 𝑻_𝒇


The tabular freeboard value can be calculated by linear Interpolation from freeboard table for type B ships.

Freeboard in
Ship's meter
Length in
meter
120 1.69 (𝑋−𝑋1)/(𝑋1−𝑋2)=
𝑻_𝒇 (𝑇𝑓−𝑌1)/(𝑌1−𝑌2)
120.96
122 1.729 𝑻_𝒇 1.70872

Correction for length


The ship is greater than 100m so, there is no need for correction.
Therefore,
𝒇_𝟏𝑻_𝒇
= 1.70872 m
Correction for block coeffient
Since, the ship's𝑪_𝒃 is 0.722 > 0.68, so correction is need in freeboard.
𝒇_𝟐 = 1.76149 m

Correction for depth


When𝐷_𝑓 exccds L/15, then the freeboard will be increased by ( 𝐷_(𝑓
- L/15)R in mm, where R=L/0.48 for less than 120m ship
and R=250 for above 120m ships. )
If𝐷_𝑓 < L/15, then no correction will be made.
𝒇_𝟑 = 2.251739 m

Correction for superstructure


The standard heigth of a superstructure is given below.

Ship's Raised All other


Length, m quarter decks, m
Deck, m
≤30 0.9 1.8
75 1.2 1.8
≥125 1.8 2.3
Since the length of the ship is 120.96m so, the standard heigth of the superstructures will be obtained by linear interpolati
For raised quarter deck
(𝑋−𝑋1)/(𝑋1−𝑋2)=
(𝑅𝑑−𝑌1)/(𝑌1−𝑌2)
𝑯_𝒒𝒅 1.7515 m
=
For all other decks
𝑯_𝒐𝒅 2.2596 m
=

The effective length is the length modified by the ratio of b/B and h/H
Where, b is breadth of the superstructure at middle length of it, h is the heigth of the superstructure.
B is the breadth of the ship at middle length of superstr., H is the standard heigth of superstructure.
Poop deck
Enclosed length S, l= 23.16 b/B= 1 Taken
Effective length, E= l*(b/B)*(h/H) 23.16 m h/H= 1 Taken

Raised Quarter deck


Enclosed length S, l= 21.4 b/B= 1 Taken
Effective length, E= l*(b/B)*(h/H) 18.33 m h/H= 0.856399

Forecastle deck
Enclosed length S, l= 13 b/B= 1 Taken
Effective length, E= l*(b/B)*(h/H) 13 m h/H= 1 Taken

Enclosed Effective
Decks length, S in length, E
m in m
Poop 23.16 23.16
Raised
quarter 21.4 18.33
Forecastle 13 13
57.56 54.49

The following table is used to deduction in percentage for the ratio of effective length to ship length.
Total effective length of
superstructure & trunk.
0.0L 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L

ships with forecastle &


without detached
bridge. 0 5 10 15 23.5 32 46

ships with forecastle &


with detached bridge.
0 6.3 12.7 19 27.5 36 46

The ratio of effective length to ship length is = 0.4504795


1 Where the effective length of forecastle bridge is less than 0.2L then the % will be obtained by linear inte
rows I and II.
2 Where the effective length of forecastle bridge is more than 0.4L then the % will be obtained by linear int
rows I and III.
3 Where the effective length of forecastle bridge is less than 0.07L then the % will be obtained by:

5* (0.07L - f)/0.07L

f is the effective length of forecastle deck

(𝑋−𝑋1)/(𝑋1−𝑋2)=
(𝑃𝑑−𝑌1)/(𝑌1−𝑌2)
% of deduction= 27.79076
0.277908

Deduction for superstructure and trunk


The deduction from freeboard will be as follows:
Ship's L, m
Freeboard deduction, fe mm
(𝑋−𝑋1)/(𝑋1−𝑋2)=
24 350 (𝐹𝑒−𝑌1)/(𝑌1−𝑌2)
85 860
≥122 1070 Fe= 1064.097 mm
1.064097 m
𝒇_𝟒 = 1.9560186 m

Correction for sheer


St. Standard, mm SM product current,mm SM product
AP (L/3 +10)*25 1 1258 750 1 750
1/6 L (L/3 +10)*11.1 3 1675.656 340 3 1020
1/3 L (L/3 +10)*2.8 3 422.688 85 3 255
1/2 L 0 1 0 0 1 0
Total Σ1 3356.344 Σ2 2025 50 - 75
1/2 L 0 1 0 0 1 0
2/3 L (L/3 +10)*5.6 3 845.376 300 3 900
5/6 L (L/3 +10)*22.2 3 3351.312 1200 3 3600
FP (L/3 +10)*50 1 2516 2500 1 2500
Total Σ3 6712.688 Σ4 7000 exceed
The difference between the sums of the respective product standard divided by eigth measures the deficiency of sheer in

𝑺_𝑨 = (Σ1 - Σ2)/8 166.418 mm


𝑺_𝑭 = (Σ3 - Σ4)/8 -35.914 mm

The height of the poop or forecastle deck is greater than the standard height, so the freeboard deck will be made in th

𝑦/3∗(𝐿' Where, s= sheer credit, y= difference between current and standard he


s=
)/𝐿 L'= length of poop or forecastle deck, L= length of ship.

Decks current height, mm standard height,mm difference s


Poop 2600 2260 340 21.69974
Forecastle 2800 2260 540 19.34524

The modified aft and forward sheer are:


𝑺_𝑨 = 144.718265 mm
𝑺_𝑭 = -55.259238 mm

The excess or deficiancy of sheer is :


𝑺_𝒅 = 44.7295132 mm
The forward sheer exceeds the standard and the aft sheer is between 50-75 of the standard.
Aft sheer= 0.603335
The deficiancy is = 18.48851 mm
The correction for sheer will be the deficiancy of multiplied by, 0.75 - (S/2L) S is the total enclosed len
The increase in freeboard due to the excess of sheer is = 9.467412 mm
0.009467 m
The freeboard after sheer correction is:
𝒇_𝟓 = 1.96548601 m
1965.48601 mm

The maximum draft in summer is, T = 8.059514 m


8059.514 mm

Summary Minimum Freeboard

Summer freeboard, 𝒇_𝒔 =1965.48601 mm


Tropical freeboard, 𝒇_𝑻 =1797.57947 mm
Winter freeboard, 𝒇_𝑾 =2133.39255 mm
W N A freeboard, 𝒇_𝒘𝒏𝒂 2183.39255 mm
= 𝒇_𝑭 =
Fresh water freeboard, 1926.71713 mm

Minimum Bow Height


For ships below 250 m in length

56 L*(1 - (L/500))*((1.36/(Cb+0.68)) mm 4981.22 mm

For ships above 250 m in length


7000*((1.36/(Cb+0.68)) mm
r type B ships.
L/0.48 for less than 120m ships

obtained by linear interpolation between 75-125

ructure.
ucture.
length.

0.7L 0.8L 0.9L 1.0L I

63 75.3 87.7 100 II

63 75.3 87.7 100 III

will be obtained by linear interpolation between

% will be obtained by linear interpolation between

be obtained by:
res the deficiency of sheer in the aft and forward.

board deck will be made in the following formula.

ween current and standard height of superstructure.


th of ship.

S is the total enclosed length of superstructure.


s