100% found this document useful (2 votes)
3K views

Sample Boq For Fit Out Works

This document contains a bill of quantities for fit-out works for an OWNER at an unspecified Location. It includes 10 sections detailing items like general requirements, walls, flooring, ceilings, railings, doors/windows, painting, cabinetry, electrical works, and miscellaneous items. Quantities and units are provided for each item along with sub-totals for each section and an overall total.

Uploaded by

Romeo Cojan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
3K views

Sample Boq For Fit Out Works

This document contains a bill of quantities for fit-out works for an OWNER at an unspecified Location. It includes 10 sections detailing items like general requirements, walls, flooring, ceilings, railings, doors/windows, painting, cabinetry, electrical works, and miscellaneous items. Quantities and units are provided for each item along with sub-totals for each section and an overall total.

Uploaded by

Romeo Cojan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Date :

Project :
Location :
OWNER :
Subject : Quotation for Fit-out Works

BILL OF QUANTITIES
ITEMS. PARTICULARS QTY UNIT
I GENERAL REQUIREMENTS
Mobilization 1.00 lot
Temporary Utilities and Consumption 1.00 lot
Temporary Facilities 1.00 lot
Housekeeping 1.00 lot
Demobilization 1.00 lot
Material Handling 1.00 lot
Hauling 1.00 lot
Sub-total

II WALLS
12mm thk gypsum board on metal frame 15.77 sqm
Baseboard (painted finish) 11.21 lm
Sub-total
III FLOOR
Supply and installation 600mm x 600mm Homogenous floor tiles 16.00 sqm
Sub-total

IV CEILING
Track provision for hospital curtain 2.00 sets
Repair of ceiling (relocation of lighting fixture) 1.00 lot
Sub-total

V RAILINGS / LEDGE
Handrail in stainless steel finish 3.00 lm
Ledge type 1 1.71 lm
Ledge type 2 4.00 lm
Sub-total

VI DOORS AND WINDOWS


D-1 Sliding Door in Heavy Duty Gliding Mechanism 2.00 sets
Sub-total

VII PAINTING WORKS


Walls (semi-gloss) 71.42 sqm
Ceiling (flat latex) 19.00 sqm
Doors (ducco finish) 2.00 sets
Ledge type 1 (semi-gloss) 1.71 lm
Ledge type 2 (ducco finish) 4.00 lm
Sub-total

VIII CABINETRIES
1.0 Cabinet Storage in ducco stain finish (receiving area) 1.00 set
2.0 Overhead Cabinets in high gloss ducco finish 2.00 sets
3.0 Overhead Cabinets (Open) 200mm x 200mm (ducco) 4.00 set
4.0 Cabinet with door in mirror clad finish 2.00 set
5.0 Base Cabinet in high gloss ducco finish 2.00 sets
6.0 Drawers in high gloss ducco finish 12.00 set
7.0 Cabinet Storage in ducco stain finish (behind main door) 1.00 set
8.0 Cabinet Storage in ducco stain finish (pantry) 1.00 set
IX ELECTRICAL WORKS
Relocation of Outlets 1.00 lot
Relocation of lighting fixtures 1.00 lot
Check circuits and panel board 1.00 lot
Sub-total

X MISCELLANEOUS ITEMS
Office Chair 3.00 units
Ordinary Chair 4.00 units
Office table 2.00 units
Examining Bed 2.00 units
Sub-total