SUN2000-(175KTL-H0, 185KTL-INH0, 185KTL-H1)

Quick Guide

Issue: 07
Part Number: 31500AQK
Date: 2019-08-30

HUAWEI TECHNOLOGIES CO., LTD.


The information in this document is subject to change without notice. Every effort has been
made in the preparation of this document to ensure accuracy of the contents, but all statements,
information, and recommendations in this document do not constitute a warranty of any kind,
express or implied.
Only qualified and trained electrical technicians are allowed to operate the device. Operators
should understand the composition and working principles of the grid-tied PV power system and
local standards.
Before installing the device, read the user manual carefully to get familiar with product
information and safety precautions. Huawei shall not be liable for any consequences caused by
the violation of the storage, transportation, installation, and operation regulations specified in this
document and the user manual.
Use insulated tools when installing the device. For personal safety, wear proper personal
protective equipment (PPE).

1 Product Overview
Front View
(1) PV connection indicator
(2) Grid-tied indicator
(3) Communication indicator
(4) Alarm/Maintenance
indicator
(5) Host panel cover
(6) Maintenance
compartment

Port Description

(1) DC input terminals (controlled by DC SWITCH 1) (2) DC switch 1 (DC SWITCH 1)


(3) DC input terminals (controlled by DC SWITCH 2) (4) DC switch 2 (DC SWITCH 2)
(5) DC input terminals (controlled by DC SWITCH 3) (6) DC switch 3 (DC SWITCH 3)
(7) Ventilation valve (8) USB port (USB)
(9) Communications port (COM) (10) Hole for the AC output power cable
(11) Hole for the tracking system power cable

1 Copyright © Huawei Technologies Co., Ltd.


2019. All rights reserved.
SUN2000 Dimensions

Mounting Bracket Dimensions

2 Installation Requirements
2.1 Installation Angle

2
2.2 Installation Space

For ease of installing the SUN2000


on the mounting bracket, connecting
cables to the bottom of the
SUN2000, and maintaining the
SUN2000 in future, it is
recommended that the bottom
clearance be between 600 mm and
730 mm.

3 Installing the SUN2000

The M12x40 bolt assemblies are delivered with


the SUN2000. If the bolt assembly length does
not meet the installation requirements, prepare
M12 bolt assemblies by yourself and use them
together with the delivered M12 nuts. Position for saving a
Before installing the mounting bracket, remove security torx
the security Torx wrench from the mounting wrench
bracket and save it for later use.
This document introduces how to install the
SUN2000 on a support as an example. For
details about wall-mounted installation, see the
user manual.

1. Install the mounting bracket.

3
2. Unpack the inverter and move it to the specified position.

Handles are packed in a fitting bag and are not delivered with the SUN2000

3. Adjust the installation positions of the handles, and install the SUN2000 on the mounting
bracket.

4
4 Installing Cables
4.1 Installation Preparations

If outdoor copper-core cables are used, select copper wiring terminals. For details about the
requirements for cables and terminals of other materials, see the user manual.

No. Item Type Specifications Description

1 PE cable Single-core outdoor Conductor cross- If you choose the


copper cable a (S ground point on the
is the conductor cross- chassis shell for
sectional area of the AC connecting a PE
output power cable.) cable, prepare the PE
cable.
If you choose the
ground point in the
maintenance
compartment for
connecting a PE
cable, use a four-core
AC output power
cable and do not have
to prepare a PE cable.

2 AC output Outdoor copper Conductor cross- If you choose the ground


power cableb cable sectional area: 50 point in the maintenance
185 mm2 compartment for
Cable outer diameter: connecting a PE cable,
24 66 mm (multi- use a four-core cable.
core); 14 35 mm Otherwise, use a three-
(single-core) core cable or three
single-core cables.
Outdoor aluminum- Conductor cross-
core cable sectional area: 70
185 mm2 (multi-core);
70 240 mm2 (single-
core)
Cable outer diameter:
24 66 mm (multi-
core); 14 35 mm
(single-core)

3 DC input power PV cable that Conductor cross- -


cable meets the 1500 V sectional area: 4 6
standard mm2
Cable outer diameter:
4.7 6.4 mm

5
No. Item Type Specifications Description

4 RS485 Outdoor shielded Conductor cross- When three


communication twisted pair cable sectional area: 0.25 1 communications cables
s cable mm2 connect to the signal
Cable outer diameter: cable connector, the
4 11 mm outer diameter of the
cables should be 4 8
mm.

5 (Optional) Three-core outdoor Conductor cross- -


Power cable of copper cable with sectional area: 10
the tracking dual-layer mm2
system protection Cable outer diameter:
15 18 mm

Note a: The value is valid only if the conductors of the PE cable and AC power cable use the same
material. If the materials are different, ensure that the conductor cross-sectional area of the PE
cable produces a conductance equivalent to that of the area S/2.
Note b: You are advised to use a soft cable to prevent poor terminal contact due to the bending
stress of the cable.

4.2 Installing the PE Cable

It is recommended that the PE cable


be connected to a nearby PE point.
Connect the PE points of all
SUN2000s in the same PV array to
ensure equipotential connections to PE
cables.
To enhance the corrosion resistance of
a ground terminal, you are advised to
apply silica gel or paint on it after
connecting the PE cable.

6
4.3 Opening the Maintenance Compartment Door

Do not open the host panel of the SUN2000.


Before opening the SUN2000 maintenance compartment door, turn off the downstream AC
output switch and three DC switches at the bottom.
Do not open the maintenance compartment door in rainy or snowy days. If you must, take
protective measures to prevent rain or snow from entering the maintenance compartment.
Do not leave unused screws in the maintenance compartment.

1. Loosen the screws on the maintenance 2. Open the maintenance compartment door
compartment door. and adjust the support bar.

7
3. Remove the crimping modules and three-hole rubber plug that are bound in the maintenance
compartment for future use.

Crimping
module
Three-hole
rubber plug

4.4 (Optional) Replacing the Crimping Module

If the AC output power cable has a single core, replace the crimping module.

8
4.5 Removing the Rubber Rings from the Crimping Module

Use scissors to cut off the joints of the rubber rings to remove them. All rubber rings are removed in
the same way.

4.6 (Optional) Installing the Solar Tracker Power Cable

1. A switch-disconnector-fuse or fuse-switch-disconnector with a voltage of no less than 800 V,


current of 16 A, and protection type of gM needs to be installed between the SUN2000 and the
tracker controller for protection.
2. The cable between the wiring terminal on the power cable and the switch-disconnector-fuse or
fuse-switch-disconnector should be less than or equal to 2.5 meters.

9
4.7 Installing AC Output Power Cables

Remove the corresponding rubber rings in strict accordance with the cable diameter, and ensure
that the crimping module is not damaged. Otherwise the protection level of the solar inverter will
be affected.
Ensure that AC terminations provide firm and solid electrical connections. Failing to do so may
cause SUN2000 malfunction and damage to its terminal block, even starting thermal events.
If the AC output power cables are subject to a pulling force because the inverter is not installed
stably, ensure that the last cable that bears the stress is the PE cable.
Multi-core Cable (Four-Core Cable Is Used as an Example)
(six rings)
(five rings)
(four rings)
(three rings)
(two rings)
(one ring)

10
Single-core Cable
(four rings)
(three rings)
(two rings)
(one ring)

11
4.8 Closing the Maintenance Compartment Door

4.9 Installing DC Input Power Cables


Wiring Description of Y-branch Connectors

When connecting cables using Y-branch connectors, ensure that all connectors are of the
same model provided by the same vendor.
If connectors of different vendors are connected to each other or different types of connectors
of the same vendor are connected to each other without permission, the contact resistance of
the connectors will exceed the allowed value. As a result, the connectors will be heated and
oxidized continuously, which is prone to faults.
Wiring rules:
1. A maximum of one set of Y-branch connectors can be used for each MPPT.
2. The PV+ on the inverter side must be connected to the PV+ on the PV string side, and the PV
on the inverter side must be connected to the PV on the string side.

12
a. Wiring diagram (with Y-branch connectors connected to the inverter)

Y-branch connectors

b. Wiring diagram (with Y-branch connectors connected to the PV modules)

Y-branch connectors

13
Selecting DC Input Terminals

The SUN2000 has three DC switches (DC SWITCH 1, DC SWITCH 2, and DC SWITCH3).
DC SWITCH 1 controls routes 1 6 of DC input terminals, DC SWITCH 2 routes 7 12, and DC
SWITCH 3 routes 13 18.

Select DC input terminals according to the following rules:


1. Evenly distribute the DC input power cables to the DC input terminals controlled by the three DC
switches. DC SWITCH 1 is preferred.
2. Maximize the number of connected MPPT circuits.
3. The even-numbered DC input terminals are preferred.

Ensure that the PV module output is well insulated to ground.

1. Use the MC4 EVO2 PV connectors delivered with the SUN2000. If the PV connectors are lost or
damaged, purchase the connectors of the same model. The device damage caused by
incompatible PV connectors is beyond the warranty scope.
2. Before connecting DC input power cables, label the cable polarities to ensure correct cable
connections. If the cables are connected incorrectly, the SUN2000 may be damaged.
3. Measure the voltage at the DC input end using a multimeter. If the voltage is a negative value,
the DC input polarity is incorrect. Correct the polarity. If the voltage is greater than 1500 V, too
many PV modules are configured to the same string. Remove some PV modules.
4. If polarity of the DC input power cable is reversed and the DC switch is ON, do not turn off the
DC switch immediately or unplug positive and negative connectors. The device may be
damaged if you do not follow the instruction. The caused equipment damage is beyond the
warranty scope. Wait until the solar irradiance declines and the PV string current reduces to
below 0.5 A, and then turn off the three DC switches and remove the positive and negative
connectors. Correct the string polarity before reconnecting the string to the SUN2000.

14
Installing a DC input power cable
Positive metal contact Positive connector

32.6020-22100-HZ
Negative metal contact (STAUBLI) Negative Click
Ensure that the cable connector
cannot be removed after
crimped.

Use a multimeter Ensure that


to measure the the locking
Click DC voltage. nut is
secured.

13001462
(STAUBLI)

4.10 Installing the RS485 Communications Cable


Communication Port Pin Definition

1. The RS485 and MBUS communication modes


are mutually exclusive.
2. When routing communications cables, separate
communications cables from power cables to
prevent communication from being affected.

Port Pin Definition Pin Definition Description


RS485-1 1 RS485A IN, RS485 2 RS485A OUT, RS485 Used for cascading
differential signal+ differential signal+ inverters or connecting to
devices such as the
3 RS485B, RS485 4 RS485B, RS485 SmartLogger.
differential signal differential signal
PE 5 PE, shielding ground 6 PE, shielding ground -
RS485-2 7 RS485A, RS485 8 RS485B, RS485 Used for connecting to
differential signal+ differential signal RS485 slave devices.

15
Connecting Communications Cables

If three communications cables are to be connected, use the three-hole rubber plug that is bound
in the maintenance compartment.

5 Verifying the Installation


1. The SUN2000 is installed correctly and securely.

2. The DC switches and downstream AC switch are OFF.

3. All ground cables are connected securely, without open circuits or short circuits.

4. AC output power cables are connected correctly and securely, without open circuits or short
circuits.

5. DC input power cables are connected correctly and securely, without open circuits or short
circuits.

6. The RS485 communications cable is connected correctly and securely.

7. The maintenance compartment door is closed and the door screws are tightened.

8. Unused DC input terminals are sealed.

9. Unused USB ports are plugged with watertight caps.

16
6 Powering On the System

Before turning on the AC switch between the SUN2000 and the power grid, use a multimeter to
check that the AC voltage is within the specified range.
1. Turn on the AC switch between the SUN2000 and the power grid.
2. Set DC SWITCH 1 (MAIN SWITCH) at the bottom of the SUN2000 chassis to ON.
3. Check the status of LED 1. If it is steady green, set DC SWITCH 2 and DC SWITCH 3 to
ON.
4. Observe the LED indicators to check the SUN2000 operating status.

Blinking at short intervals (on for 0.2s and then off for 0.2s).
Blinking at long intervals (on for 1s and then off for 1s).

Display Category Indicator Status Description

PV indication LED1 LED4 -

At least one PV string is properly connected, and


Steady green - the DC input voltage of the corresponding MPPT
circuit is higher than or equal to 500 V.

Blinking
green at Steady
An environmental fault occurs at DC side.
short red
intervals

The SUN2000 disconnects from all PV strings, or


Off - the DC input voltage of each MPPT circuit is less
than 500 V.

Grid-tied indication LED2 LED4 -

Steady green - The SUN2000 has connected to the power grid.

Blinking
green at Steady
An environmental fault occurs at AC side.
short red
intervals

Off - The SUN2000 does not connect to the power grid.

Communications LED3 -
indication
Blinking green at short The SUN2000 receives data over RS485 or MBUS
intervals communication.

The SUN2000 has not received data over RS485


Off
or MBUS communication for 10 seconds.

17
Display Category Indicator Status Description

Alarm/O&M LED4 -
indication
Steady red A warning alarm is generated.

Blinking red at short


A minor alarm is generated.
intervals

Blinking red at long


A major alarm is generated.
intervals

Steady green Local maintenance succeeds.

Blinking green at long


In local maintenance or shuts down over a command.
intervals

Blinking green at short


Local maintenance fails.
intervals

No alarm is generated, and no local maintenance


Off
operations are performed.

7 SUN2000 APP

1. The SUN2000 app is mobile phone app that communicates with the SUN2000 monitoring system
over a USB data cable, Bluetooth module, or WLAN module. As a convenient local monitoring
and maintenance platform, it supports alarm query, parameter configuration, and routine
maintenance. The app name is SUN2000.
2. Access the Huawei app store (http://appstore.huawei.com) or Google Play
(https://play.google.com), search for SUN2000, and download the SUN2000 app software
package.
3. Connect a USB data cable, a Bluetooth module, or a WLAN module to the USB port of the
SUN2000 to implement the communication between the SUN2000 and the app.

Bluetooth Module or WLAN Module


Connection USB Data Cable Connection

18
Selecting a Switching Quick
Login screen between users
connection mode settings

Main menu
screen
The screenshots in this document correspond to app version 3.2.00.001.
When the WLAN connection is used, the initial name of the WLAN
hotspot is Adapter-WLAN module SN, and the initial password is
Changeme.
The initial password for Common User, Advanced User, and Special
User is 00000a.
Use the initial password upon first power-on and change it immediately
after login. To ensure account security, change the password periodically
and keep the new password in mind. Not changing the initial password
may cause password disclosure. A password left unchanged for a long
period of time may be stolen or cracked. If a password is lost, devices
cannot be accessed. In these cases, the user is liable for any loss
caused to the PV plant.
Set the correct grid code based on the application area and scenario of
the solar inverter.

19
8 Grid Code Mapping Table
SUN2000- SUN2000- SUN2000-
No. Grid Code Description
175KTL-H0 185KTL-INH0 185KTL-H1
China medium-voltage power -
1 CHINA_MV800 Supported -
grid
G59 medium-voltage power
2 G59-England-MV800 - - Supported
grid
Australia medium-voltage
3 AS4777-MV800 - - Supported
power grid
India medium-voltage power
4 INDIA-MV800 - Supported -
grid
IEC61727 medium-voltage
5 IEC61727-MV800 - Supported Supported
power grid (50 Hz)
Germany medium-voltage
6 BDEW-MV800 - - Supported
power grid
ABNT NBR 16149- Brazil medium-voltage power
7 - - Supported
MV800 grid
UTE C 15-712-1- France medium-voltage
8 - - Supported
MV800 power grid
Chile medium-voltage power
9 Chile-MV800 - - Supported
grid
Turkey medium-voltage power
10 EN50438-TR-MV800 - - Supported
grid
Thailand PEA medium-
11 TAI-PEA-MV800 - - Supported
voltage power grid
Philippines medium-voltage
12 Philippines-MV800 - - Supported
power grid
Malaysia medium-voltage
13 Malaysian-MV800 - - Supported
power grid
South Africa medium-voltage
14 NRS-097-2-1-MV800 - - Supported
power grid
South Africa RPPs medium-
15 SA_RPPs-MV800 - - Supported
voltage power grid
Jordan power transmission
Jordan-Transmission-
16 network medium-voltage - - Supported
MV800
power grid
Jordan power distribution
Jordan-Distribution-
17 network medium-voltage - - Supported
MV800
power grid
Egypt medium-voltage power
18 Egypt ETEC-MV800 - - Supported
grid

20
SUN2000- SUN2000- SUN2000-
No. Grid Code Description
175KTL-H0 185KTL-INH0 185KTL-H1
Dubai medium-voltage
19 DUBAI-MV800 - - Supported
power grid
Saudi Arabia medium-
20 SAUDI-MV800 - - Supported
voltage power grid
Ireland medium-voltage
21 EN50438_IE-MV800 - - Supported
power grid
CLC/TS50549_IE- Ireland medium-voltage
22 - - Supported
MV800 power grid (CLC/TS50549)
Northern Ireland- Northern Ireland medium-
23 - - Supported
MV800 voltage power grid
Italy medium-voltage power
24 CEI0-21-MV800 - - Supported
grid (CEI0-21)
IEC 61727-MV800- General medium-voltage
25 - Supported Supported
60HZ power grid
Pakistan medium-voltage
26 Pakistan-MV800 - - Supported
power grid
BRASIL-ANEEL- Brazil medium-voltage
27 - - Supported
MV800 power grid
Israel medium-voltage
28 Israel-MV800 - - Supported
power grid
Italy medium-voltage power
29 CEI0-16-MV800 - - Supported
grid
Zambia medium-voltage
30 ZAMBIA-MV800 - - Supported
power grid
Kenya low-voltage and
KENYA_ETHIOPIA_
31 Ethiopia medium-voltage - - Supported
MV800
power grid
Namibia medium-voltage
32 NAMIBIA_MV800 - - Supported
power grid
Cameroon medium-voltage
33 Cameroon-MV800 - - Supported
power grid
Nigeria medium-voltage
34 NIGERIA-MV800 - - Supported
power grid
Abu Dhabi medium-voltage
35 ABUDHABI-MV800 - - Supported
power grid
Lebanon medium-voltage
36 LEBANON-MV800 - - Supported
power grid
Argentina medium-voltage
37 ARGENTINA-MV800 - - Supported
power grid
Jordan-Transmission- Jordan high-voltage and
38 - - Supported
HV800 medium-voltage power grid

21
SUN2000- SUN2000- SUN2000-
No. Grid Code Description
175KTL-H0 185KTL-INH0 185KTL-H1
Tunisia medium-voltage
39 TUNISIA-MV800 - - Supported
power grid
AUSTRALIA-NER- Australia NER standard
40 - - Supported
MV800 medium-voltage power grid
VDE-AR- VDE4120 standard
41 - - Supported
N4120_HV800 medium-voltage power grid
Nicaragua medium-voltage
42 Nicaragua-MV800 - - Supported
power grid
43 Custom-MV800-50Hz Reserved - - Supported
Spain medium-voltage
44 RD1699/661-MV800 - - Supported
power grid
Spain medium-voltage
45 PO12.3-MV800 - - Supported
power grid
Vietnam medium-voltage
46 Vietnam-MV800 - - Supported
power grid
Chile PMGD medium-
47 CHILE-PMGD-MV800 - - Supported
voltage power grid (800 V)
Ghana medium-voltage
48 GHANA-MV800 - - Supported
power grid (800 V)
Taiwan power medium-
49 TAIPOWER-MV800 - - Supported
voltage power grid (800 V)
Oman medium-voltage
50 OMAN-MV800 - - Supported
power grid
Kuwait medium-voltage
51 KUWAIT-MV800 - - Supported
power grid
Bangladesh medium-
52 BANGLADESH-MV800 - - Supported
voltage power grid
Bahrain medium-voltage
53 BAHRAIN-MV800 - - Supported
power grid
Kazakhstan medium-
54 KAZAKHSTAN-MV800 - - Supported
voltage power grid
Oman PDO medium-
55 Oman-PDO-MV800 - - Supported
voltage power grid
Thailand medium-voltage
56 TAI-MEA-MV800 - - Supported
power grid

NOTE

The grid codes are subject to change. The listed codes are for your reference only.

22
Huawei Technologies Co., Ltd.
Huawei Industrial Base, Bantian, Longgang,
Shenzhen 518129, People's Republic of China
solar.huawei.com