Contractor Prequalification Summary CD 009B: REFERENCE NO.
Contractor Prequalification Summary CD 009B: REFERENCE NO.
CD 009B
Previously
Validity Submitted Copy Attached
CR -1-
CD 009B G4000066/00
a] Appendix I A complete list of similar work you have completed. [Please use the attached
format]. Attach a "Completion Certificate" from your client to prove that you have
completed the work/project you have listed. Any experience listed but not
accompanied with such certificate will not be considered.
b] Appendix II A complete list of all your on-going projects or contracts. (Please use the
attached format). Attach a certificate from the client to prove that you are currently
performing the work you have listed. Any project or contract listed but not
accompanied with such certificate will not be considered.
c] Appendix III A complete list of your proposed manpower to be utilized specifically for the
Work. Indicate whether or not the proposed personnel are In-Kingdom. Provide a
Resume of the proposed Key personnel. (Please use the attached format).
d] Appendix IV An Organization Chart showing your present overall organization and functional
groups. The Chart should show lines of authority and communication.
e] Appendix V A complete list of proposed equipment and tools to be utilized specifically for the
work/project. Indicate whether or not the proposed equipment/tool is owned by your
Company or to be leased. [Please use the attached format].
f] Appendix VI
Proposed Work Plan. Provide a description of how you plan to perform the
work/project. The proposed plan should mention about mobilization, accommodation
of your personnel, work schedule, etc. [Please use the attached format].
g] Appendix VII Understanding about the Scope of Work. Provide a description of your
understanding about the Scope of Work.
h] Appendix VIII Audited Financial Statement. Provide a copy of your current [______________]
audited Financial Statement [Income Statement and Balance Sheet including the
Auditor's Comments], if not yet submitted to the Saudi Electricity Company.
CR
CD 009B G4000066/00
The completed Prequalification Form should be submitted to the Contracting Receptionist in an envelope
clearly marked as follows:
(Contractor’s Name)
To : The Manager
Contracting Department
Saudi Electricity Company, ___________________ Area
(Address)
Saudi Arabia
NAME :
SIGNATURE :
POSITION :
APPENDIX I
CONTRACTOR PREQUALIFICATION SUMMARY
Contract No.
And Date Client Description of Work Value (SR) Completion
(If available) Date
Note: Please fill out this form properly. Do not revise this form.
G4000066/00
CD 009B
APPENDIX II
CONTRACTOR PREQUALIFICATION SUMMARY
Note: Please fill out this form properly. Do not revise this form.
G4000066/00
CD 009B
Are all of the above listed proposed manpower employed by your company? YES NO. If NO, explain below.
G4000066/00
CD 009B
APPENDIX III
CONTRACTOR PREQUALIFICATION SUMMARY
LIST OF CONTRACTOR'S PROPOSED KEY PERSONNEL TO BE UTILIZED SPECIFICALLY FOR THE WORK
Quantity
Position Other Arabs U.S. National U.K. National Asian Others [Specify]
Saudi
In-Kingdom Out-of-k In-Kingdom Out-of-k In-Kingdom Out-of-k In-Kingdom Out-of-k In-Kingdom Out-of-k
Are all of the above listed proposed manpower employed by your company? YES NO. If NO, explain below.
G4000066/00
CD 009B
APPENDIX II-A
CONTRACTOR PREQUALIFICATION SUMMARY
NAME :
NATIONALITY :
DATE OF BIRTH :
EDUCATION BACKGROUND :
HIGH SCHOOL :
(Name of School) (Year Graduated)
COLLEGE :
(Name of College/University) (Year Graduated)
WORK EXPERIENCE :
APPENDIX V
CONTRACTOR PREQUALIFICATION SUMMARY
Quantity
Item
Description of Equipment/Tool Capacity To be
No. Owned
Leased
NOTE:
2. Do not list all equipment your company have. List only those equipment and tools that you intend to use and
are readily available for the work/project
G4000066/00
CD 009B
APPENDIX VI
CONTRACTOR PREQUALIFICATION SUMMARY
1. Mobilization
1.1. Proposed period of complete mobilization from the effective date of the contract and ready to start the work.
1.3. Can you mobilize all your proposed equipment and tools on time to start the work?
YES NO If, NO, describe your equipment mobilization plan below.
1.4. Do you plan to request assistance from the Saudi Electricity Company for Visas of any of your proposed manpower? YES NO. If YES,
indicate below your reason[s] and list down the category and number of personnel you intend to recruit.
Reason[s]:
G4000066/00
CD 009B
2.1. Do you have camp[s] facilities near the Work Site to accommodate your proposed manpower?
YES NO. If, YES, provide the information below.
Capacity
Camp[s] Location:
[No. of Persons]
If NO, where is/are your camp[s] located? Describe your plan below.
G4000066/00
CD 009B
2.2. Do you transport your personnel to the Work Site daily from your camp?
2.3. Do you have a material yard near the Work Site? YES NO. If YES, provide the information below.
If you have no Material Yard near the Work Site, describe your plan below.
3. Subcontracting
3.1. Do you plan to subcontract any portion of the Work if you become the successful bidder?
YES NO If, YES, provide the information below [for each proposed subcontractor].
Name of Proposed Subcontractor: _________________________________________________
Address: _____________________________________________________________________
Commercial Registration Number: _________________________________________________
G4000066/00
CD 009B