Precast - Wall - Connection Wire Loop Design Forces
Precast - Wall - Connection Wire Loop Design Forces
CONNECTION WIRE
ROPE BOXES 12
CONTENTS
Wire Boxes for Precast Panels 12-03
Selection 12-04
Capacities 12-05
Installation 12-07
Manufacturing 12-09
PRECAST WALL
CONNECTION WIRE
ROPE BOXES
WIRE BOXES FOR PRECAST PANELS
Wire Rope Boxes are designed to be used as a structural connection for pre-cast units with recesses, or
between precast units and in-situ concrete components. The casing of the box eliminates the need for
additional formwork. The rope boxes are very easy to use on site, with no-tool tear-off tape that releases
the flexible loops. The loops are stitched into the adjoining element with rods and insitu concrete.
We can provide boxes containing a single loop or maxi - depending on the load capacities that are required.
www.cfsfixings.com 12 03
SELECTION CAPACITIES
Our product range includes Standard wire boxes, and Maxi wire box. Selection should be made based on The Standard boxes (RVL-60, -80, -100 and -120)
the thickness of the joint. For greater loads use Maxi wire rope boxes. all have equal capacities. For greater loads, use
the Maxi box (RVL-140).
Design Principles
The capacities presented in the tables below are
Standard and Maxi Wire Loop Boxes calculated for static loads. Our wire rope loops are
not designed to be used for dynamic loading or
for lifting. For the capacities to be achieved, there
should be no cracks or deformations in the joints.
The capacities of the wire rope loops are
calculated for a joint as presented in the diagram
with seam thickness and reinforcement as outlined
in the following sections. The steel boxes and the
seam must be fully filled with concrete.
The capacities given are the resistances in ultimate
The resistance is defined by the weakest concrete in the system, either to fill the joint or the concrete used to make the precast element.
12 04 www.cfsfixings.com www.cfsfixings.com 12 05
Tensile Capacity
Capacities are shown here per box.
INSTALLATION
Seam Thickness (b)
Design Value of Tensile Indented joint dimensions used in calculations
Box Type Part No Resistance, FRd (kN) The size of the wire rope loops must be chosen for transversal shear force
according to the thickness of the joint to enable the
C25/30 C40/50
vertical ribbed steel bar in the joint to pass through
CFS-RVL-60 the wire rope loops on both side of the joint.
CFS-RVL-80
Standard 12.9 12.9
CFS-RVL-100 Recommended thickness
Box Type Part No
of rope loop seam (mm)
CFS-RVL-120
CFS-RVL-60 70-90
Maxi CFS-RVL-140 23.1 23.1
CFS-RVL-80 90-110
Standard
CFS-RVL-100 110-140
The resistance is defined by the weakest concrete
in the system, either to fill the joint or the concrete CFS-RVL-120 140-190
used to make the precast element. The distance
Maxi CFS-RVL-140 160-220
between wire loop boxes must be as defined later
in this section.
CFS-RVL-80
CFS-RVL-140
mm
The resistance is defined by the weakest concrete
CFS-RVL-60
in the system, either to fill the joint or the concrete
used to make the precast element. The distance CFS-RVL-80
Standard 250 100 20 120
between wire loop boxes must be as defined later CFS-RVL-100
in this section. Combined Forces
CFS-RVL-120
For circumstances where there is a combination of
Maxi CFS-RVL-140 350 200 25 150
forces on the wire loop joints, the following must apply:
12 06 www.cfsfixings.com www.cfsfixings.com 12 07
Reinforcement of the joint
When using wire rope loops, a vertical ribbed steel bar
Reinforcing steel A500HW or similar SUPERVISION OF INSTALLATION
must always be installed through the wire loops as
shown here. Check list before casting:
• Wire rope loop is in good condition
Recommended thickness • Wire rope loop is according to designs and in the right place
Box Type Part No
of rope loop seam (mm)
• Wire rope loop is attached firmly
CFS-RVL-60 12
• The required additional reinforcement is installed
CFS-RVL-80 12
Standard During the casting:
CFS-RVL-100 12
• Wire rope loop stays in the right place
CFS-RVL-120 12
• The concrete is thoroughly vibrated around the RVL wire rope loop
Maxi CFS-RVL-140 16
After the casting:
• The tape covering the steel box is removed at the factory after the concrete is cured
MANUFACTURING
12 08 www.cfsfixings.com www.cfsfixings.com 12 09
12 10 www.cfsfixings.com