The document presents two network drawing problems. For each problem, the activities, prerequisites, and durations are provided. The tasks are to draw the network, calculate earliest and latest event times, and identify the critical path(s).

Uploaded by

Madzlan Napiah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views2 pages

MA230expm 1

The document presents two network drawing problems. For each problem, the activities, prerequisites, and durations are provided. The tasks are to draw the network, calculate earliest and latest event times, and identify the critical path(s).

Uploaded by

Madzlan Napiah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

QUESTION

Draw networks for the following projects. In each case, calculate all earliest
and latest event times, and deduce the critical path(s).

Activity Prerequisites Duration


A - 6
B - 3
C - 5
D A 5
E B 2
F B 9
G B,C 3
H D,E 6
I F,G 1
J F,G,H 8
K I 4

Activity Prerequisites Duration


A - 4
B - 2
C - 3
D A 7
E C 3
F B,E 8
G D,E 3
H A,B,C 2

ANSWER

(a)

1
¨¥
(6,6)
§
2 ¦H
µ
¡ HHD,5
A,6 HH
j¨ ¥ H,6 - ¨(17,17)
¥
¡ (11,11)
¡ H
¡ © *
© §¦
5 §

© @ J,8
¡ ©©E,2
(3,8)
(0,0) ¨ ¥¡ B,3 - ¨ ¥
© µ
¡ @R¨ ¥
@
§¦ §¦ §

1 3 ¡
H
@ H HF,9 ¢̧ (25,25)
? HH µ
¡
j¨ ¥
@ ¡ ¢
H (12,17) ¢
@
© *§
© 6¦ ¢
@ ? © H
HHI,1
C,7@
R¨ ¥
@ ©©G,3 HH ¨¢¥
¢ K,4
©
§
4¦ §¦
j 8
H
(7,14) (13,21)

Critical path is A - D - H -J

(b)
¨¥ ¥
¨(11,11)
(4,4)
D,7
§
2¦ §¦ H
- 7 H
µ
¡
H
j
H 6 HG,3
H
A,4
¨¥ j¨ ¥
¡ H
j
H (4,12) HH
¡
§5¦ §¦
- 9
¡ ©
* 6
¡ (2,6) © Á
­ H,2 ¢¢̧(14,14)
­
(0,0) ¨ ¥¡ B,2 - ¨ ¥©©
* ­ ¢ F,8
§
1¦ §
3 ¦XX
z ­ 6 ¢
@ X z
X
­ ¢
­ Xz
X
@ X
z
X ¢
­ z 6
X
z ¨¥
@ X ¢
­ XX
§
8 ¦(6,6)
@
C,3@ ­
R¨ ¥ 6¡
@ ­ ¨¥ µ
- 6 ¡
§¦
4 §¦
(3,3) E,3 (6,6)

There are two critical paths: A - D - G and C - E - F.