Commissioning Service Department Commissioning Standard Test Formats Description: Function Test - Accs
Commissioning Service Department Commissioning Standard Test Formats Description: Function Test - Accs
As Per the Schematic Drawings the Contents in This Test Format Can Be Modified.
Panel designation
Serial no
Make
Panel type
Dwg & sch no
Panel no
G T1
G T2 G T3
B/C - 1 B/C - 2
In Auto Mode, the Closing of cap Bank Circuit Breakers should be in ascending order
(i.e., cap bank -1, cap bank – 2, cap bank – 3 …..) Where as the opening of cap bank to
be in descending order (i.e.,) cap bank -3,cap bank -2,cap bank -1 and so on.
6.1. CASE 1:
Bus coupler – 1(BC -1) and Bus coupler -2 (BC -2) are in open Position
6.2. CASE 2:
Bus coupler – 1(BC -1) Open and Bus coupler -2 (BC -2) in Close position
6.3. CASE 3:
Bus coupler – 1(BC -1) Close and Bus coupler -2 (BC -2) in open position
6.4. CASE 4:
Bus coupler – 1(BC -1) and Bus coupler -2 (BC -2) in Close position
6.6. Case 7:
If any one of Three Grid Transformer is out of service, then the system will
Remain same.
8. ACCS INDICATIONS: