T D S Item Description A. Sub-Structure: Takeoff Sheet
T D S Item Description A. Sub-Structure: Takeoff Sheet
PROJECT NAME:-
CLIENT:-
Location:-
Contractor:-
T D S Item Description
A. SUB-STRUCTURE
1.EXCAVATION & EARTH WORKS
1.0 17.645
11.82 Site clearing to a depth of about 20cm including
working space of 150 cm at both sides.
208.60 m2
1.0 1.90
1.80 Pit Excavation for isolated footing for the depth not
exceeding 150cm including working space of 25cm
2.50
at both sides (x5y4)
8.55 m3
1.0 2.10
1.90
Ditto but (x5y3)
2.50
9.98 m3
1.0 2.10
1.80
Ditto but (x4y4)
2.50
9.45 m3
1.0 2.10
2.10
Ditto but (x4y3)
2.50
11.03 m3
1 2.30
2.30
Ditto but (F1)
2.50
13.23 m3
1 2.20
1.70
Ditto but (F2)
2.50
9.35 m3
1 1.80
1.60
Ditto but (x1y4)
2.50
7.20 m3
1 1.80
1.80
Ditto but (x1y2)
2.50
8.10 m3
1 2.20
2.00
Ditto but (x2y4)
2.50
11.00 m3
1 2.20
2.20
Ditto but (x2y2)
2.50
12.10 m3
1 2.30
1.50
Ditto but (x3y4)
2.50
1.0 19.20 25cm thick hard core filling and blinded with basaltic
19.00 or equivalent material
364.80 m2
1.0 19.20
19.00 Ditto,but for 25cm thick hard core
364.80 m2
2.0 62.00
1.00 Ditto,but for payment
124.00 m2
853.60 m2 Total hard core
2. CONCRETE WORK
1.0 6.65
4.75 15cm thick C -15 Floor slab
31.59 m 2
1 1.0 4.80
3.57 15cm thick C -15 Floor slab
Footings x5y4
SUPERVISOR ........................ CONTRACTOR .................
Takeoff sheet
PROJECT NAME:-
CLIENT:-
Location:-
Contractor:-
T D S Item Description
1.30
Footings x5y4
0.50
0.91 m3
14 1 1.60
1.30
Footings x4y4
0.50
1.04 m3
1 1 1.60
1.40
Footings x5y3
0.50
1.12 m3
2 1 1.60
1.60
Footings x4y3
0.50
1.28 m3
3 1 5.05
0.40
Footings strip x1
0.50
1.01 m3
4 1 5.05
0.40
Footings strip x2
0.80
1.62 m3
5 1 3.45
0.40
Footings strip x3
0.60
0.83 m3
7 1 3.85
0.25
Footings strip y1
0.60
0.58 m3
8 2 3.85
0.40
Footings strip y3& y4
0.60
1.85 m3
1 3.65
0.40
Footings strip x5
0.80
1.17 m3
1 3.65
0.40
Footings strip x4
0.60
0.88 m3
22.75 m3
14.0 0.40
0.25
Foundation columns
27.0 1.20
2.25 in Foundation columns
72.90 m 2
2.0 40.00
0.60 in Grade Beam,long side
48.00 m2
3.0 20.00
0.60 in Grade Beam, short side
6 20.00
0.60 Ditto,but short side
72.00 m2
4 40.00
0.50 intermidate beams long side
80.00 m2
6 20.00
0.50 Detto,but short side
60.00 m 2
4 40.00
0.60 top tie beams long side
96.00 m 2
6 20.00
0.60 Detto,but short side
72.00 m 2
1 19.80
19.80 Cement screed for floor slab
392.04 m 2
1 19.80
19.80 Cement screed for floor slab
392.04 m 2
1 42.00
Roof ridge
42.0 ml
gutter, G-28
2.0 42.00 84.0 ml
down pipe,G-28
18 6.50 117.0 ml
6 20.00
0.30 Ditto, but short side top tie beam
36.00 m2
356.80 m2 Total exposed plastic paint
7.Glazing
8 4.70
0.70 4mm thick cleared glass
26.32 m 2
8.Electrical Installation
1 1.00 1.0 No. 32amp ACB 3-phase
3 1.00 3.0 No. 25amp ACB 3-phase
2 1.00 2.0 No. 16amp ACB 1-phase
5 1.00 5.0 No. 10amp ACB 1-phase
16 3 3 4.24
x5 16 7 7 3.84
14 3 3 4.24
x4 14 5 5 3.84
14 3 3 5.64
footing strips x1 14 6 6 5.24
16 3 3 6.24
x2 16 7 7 5.64
14 3 3 4.24
x3 14 5 5 3.84
14 3 3 4.445
y1 14 5 5 4.045
c1 16 10 70 3.765
Foundation columns
SUPERVISOR ......................... CONTRACTOR ....................
Rebar Details
PROJECT NAME:- Location:Addis Ababa
CLIENT:-
c2 16 12 84 3.765
Foundation columns st1 1.16
st2 0.88
st3 0.39
14 3 3 13.06
y1 14 3 3 13.74
14 3 3 3.785
y2 14 3 3 4.465
14 3 3 10.99
y3 14 3 3 11.67
14 3 3 12.19
y4 14 3 3 13.55
12 3 3 2.865 8.60
GFB2 12 3 3 3.515 10.55
Grade beams
14 3 3 7.620
x5 14 3 3 8.300
14 3 6 8.720
x4& x3 14 3 6 9.400
14 3 3 6.877
x2 14 3 3 7.557
12 3 3 2.090 6.27
GFB1 12 3 3 2.770 8.31
394.94 250.62
Bar Total
Length
Location mark No. of No. of Total No.
(Shape
Dia
Bars Mem of Bars
of Bars Length in (m)
(m) 8mm 12mm
8 30 27 810 1.20 972.00
elevation columns
20 8 27 216 6.00
8 100 3 300 0.85 255.00
8 200 2 400 0.85 340.00
sh 14 3 5 15 23
intermediate beams
lo 14 3 2 6 44
sh 20 3 3 9 23
lo 20 3 2 6 44
sh 8 100 3 300 1.2 360.00
sh 16 4 3 12 23
tie beams
lo 8 200 2 400 1.2 480.00
lo 16 4 2 8 44
Total Length in (m) 2,407.00 -
Weight (kg/m) 0.395 0.888
Total Weight (kg) 950.77 -
1045.84 0.00
24
23.1
25.3
27.3
26
25.3
50.60
22.00
21.60
52.80
23.80
20.00
34.20
26.64
40.40
12.72
26.88
18.72
39.48
12.72
19.20
13.34
20.23
263.55
39.18
41.22
11.36
13.40
32.97
35.01
36.57
40.65
22.86
24.90
52.32
56.40
20.63
22.67
1,376.30 460.8 -
1.210 1.580 2.470 `
1665.33 728.06 0.00
800.87 0.00
1296.00
345.00
264.00
207.00
264.00
276
352
609.00 628.00 1,767.00
1.210 1.580 2.470
736.89 992.24 4,364.49
18 10.80 area,m2
194.40
1,465.00 62.21
12 5.50
66.00
497.38 21.12
18 10.60
190.80
1,437.87 61.06
3,400.24
18 1.60
28.80
158.26 8.06
18 1.40
25.20
138.47 7.06
18 1.15
20.70
113.75 5.80
18 0.95
17.10
93.96 4.79
18 0.70
12.60
69.24 3.53
18 0.50
9.00
49.46 2.52
18 0.25
4.50
24.73 1.26
18 2.05
36.90
202.77 10.33
18 1.90
34.20
187.93 9.58
18 1.80
32.40
178.04 9.07
18 1.65
29.70
163.20 8.32
18 1.60
28.80
158.26 8.06
18 1.55
27.90
153.31 7.81
1,691.36
18 42.00
756.00
4,272.91 181.44
412.01
9 4 36 pcs
18 2 36 pcs
18 9 162 pcs
9 8 72 pcs
18 4 72 pcs
TAKE OFF SHEET
CONTRACTOR:-
LOCATION:-kaliti
ITEM DESCRIPTION
Roof Work
Fabrication and installation of RHS truss as shown in the detail
drawing
7.536 80x80x3
80x80x3mm RHS top diagonal chord
total 80x80x3mm
total 80x60x2.5 mm
5.652
70x50x3mm RHS purlin 0.24
total area
The required plate and bolts on top of column and roof structure
for truss joint ;
Plate 150x150x6mm for truss
Gusset plate 250x300x6mm
Angle iron
Bolts M16 for post fixing at joint;
J bolts
`
Specification and Bill of Quantity for the Construction of Store
PROJECT NAME:- Kaliti Store,Size40x20
CLIENT:- Addis Ababa Water& Sewerage Authority
CONTRACTOR:-
Item
no DESCRIPTION Unit Quantity Unit Price
SUB-STRUCTURE
1.Excavation and Earth work
1.1 Site clearing to a depth of about 20cm including
m2 208.60
working space of 150 cm at both sides
1.2 Pit Excavation on ordinary soil for isolated footing,
depth not exceeding 150cm including working space of m3 134.37
25cm at both sides
1.3 Pit Excavation on ordinary soil for isolated footing,
depth greater than 150 cm including working space of m3 Err:509
25cm at both sides
1.4 Pit excavation on soft rock m3 30.13
1.5 Trench Excavation on ordinary soil, depth not greater
than 100cm including working space of 25cm at both m3 40.06
sides
1.6 Trench excavation on soft rock m3 Err:509
1.7 Bulk Excavation for floor slab according to the
m3 Err:509
drawing and the site Engineer decisions
1.8 Cart away excavated material to a distance not
m3 246.27
exceeding 2 km away from the site
1.9 Selected excavated fill around masonary, below hard
core and around foundation column and compacted
every 20cm layer to standard proctor density. The m3 86.20
quality of the excavated material shall be decided by
the site engineer.
1.10
Selected borrowed fill, around masonary, below hard
core and around foundation column and compact m3 676.35
every 20cm layer to standard proctor density.
1.11 25cm thick hard core filling and blinded with basaltic
m2 853.60
or equivalent material
Total Carried to summary
2.Concrete Work
2.1 5cm thick lean concrete C-5 under isolated footing m2 14.18
2.2 10cm thick lean concrete C-5 under 50cm masonry m 2
12.72
2.3 5cm thick lean concrete C-5 under Grade beam m2 66.50
2.4 15cm thick reinforced concrete class in C -15 Floor
m2 25.67
slab
2.5 Construct 10 cm thick and one meter width C-15
concrete pavement around the building including
ml 31.59
necessary excavation. Hard core and reinforcement
bar measured separately
Supply and install 100cm diameter circular reinforced
concrete pipe culvert. The price include excavation,
2.6 ml 4.80
harde core around pipe culvert and joining cement
mortar of1:3
Item
no DESCRIPTION Unit Quantity
SUB-STRUCTURE
1.Excavation and Earth work
1.1 Site clearing to a depth of about 20cm including
m2 208.60
working space of 150 cm at both sides
1.2 Pit Excavation on ordinary soil for isolated footing,
depth not exceeding 150cm including working space m3 134.37
of 25cm at both sides
1.3 Pit Excavation on ordinary soil for isolated footing,
depth greater than 150 cm including working space of m3 Err:509
25cm at both sides
1.4 Pit excavation on soft rock m3 30.13
1.5 Trench Excavation on ordinary soil, depth not greater
than 100cm including working space of 25cm at both m3 40.06
sides
1.6 Excavation on Soft rock m3 Err:509
1.7 Bulk Excavation for floor slab according to the
m3 Err:509
drawing and the site Engineer decisions
1.8 Cart away excavated material to a distance not
m3 246.27
exceeding 2 km away from the site
1.9 Selected excavated fill around masonary, below hard
core and around foundation column and compacted
every 20cm layer to standard proctor density. The m3 86.20
quality of the excavated material shall be decided by
the site engineer.
1.10
Selected borrowed fill, around masonary, below hard
core and around foundation column and compact m3 676.35
every 20cm layer to standard proctor density.
1.11 25cm thick hard core filling and blinded with basaltic
m2 853.60
or equivalent material
Total Carried to summary
2.Concrete Work
2.1 5cm thick lean concrete C-5 under isolated footing m2 14.18
2.2 10cm thick lean concrete C-5 under 50cm masonry m 2
12.72
2.3 5cm thick lean concrete C-5 under Grade beam m2 66.50
2.4 15cm thick reinforced concrete class in C -15 Floor
m2 25.67
slab
2.5
Construct 10 cm thick and one meter width C-15
concrete pavement around the building including
ml 31.59
necessary excavation. Hard core and reinforcement
bar measured separately
Supply and fix 25A 3ph socket out let fed through
8.4 PVC insulating conduit of 4*4 mm2 cable and all the No. 2
required accessories
Supply and fix lagrand type Flush mounted double
8.5 No. 6
pole switch.
Light fitting and Lamp
Supply and fix T.M.S or equivalent Florescent lamp
8.6 No. 32
2*36w
Supply and fix T.M.S or equivalent Florescent lamp
8.7 No. 6
1*36w
Supply and fix lagrand or equivalent type flush
8.8 No. 6
mounted socket 10/16A,1ph
Supply and fix lagrand or equivalent type flush
8.9 No. 2
mounted industrial socket 25A,3ph
8.10 Supply and fix power cable 4*6mm2 ml 50
Total Carried to summary
TOTAL
VAT(15%)
GRAND TOTAL
Unit Price Total Price
5.00 1,043.00
58.00 7,793.17
58.00 Err:509
145.00 4,368.13
55.00 2,203.51
110.00 Err:509
45.00 Err:509
70.00 17,239.16
150.00 12,929.37
135.00 91,306.58
95.00 81,092.00
Err:509
65.00 921.38
165.00 2,098.07
65.00 4,322.50
185.00 4,748.95
225.00 7,107.19
380.00 1,824.00
185.00 15,665.34
2,100.00 47,765.55
2,100.00 6,615.00
2,200.00 17,427.08
90.00 3,790.80
90.00 6,561.00
105.00 8,820.00
15.00 4,800.00
200.00 960.00
32.00 11,489.12
32.00 7,290.69
32.00 42,944.00
32.00 23,298.05
32.00 -
218,448.70
850.00 53,550.00
850.00 35,700.00
170.00 21,080.00
110,330.00
2,400.00 33,145.20
2,400.00 17,472.00
2,400.00 31,248.00
90.00 16,038.00
105.00 10,584.00
105.00 13,524.00
32.00 30,424.48
32.00 23,580.48
32.00 31,751.68
32.00 139,663.68
347,431.52
225.00 184,050.00
184,050.00
75.00 122,700.00
105.00 62,454.00
65.00 4,680.00
105.00 82,328.40
272,162.40
40.00 136,009.73
40.00 53,780.00
40.00 170,916.48
100.00 3,600.00
100.00 3,600.00
3.00 486.00
10.00 720.00
10.00 720.00
20.00 1,440.00
3,100.00 24,800.00
4,200.00 33,600.00
12,500.00 25,000.00
454,672.21
380.00 351,120.00
240.00 10,080.00
220.00 18,480.00
220.00 25,740.00
6,000.00 24,000.00
429,420.00
37.60 13,415.68
32.00 13,184.26
26,599.94
260.00 6,843.20
6,843.20
1,000.00 1,000.00
500.00 1,500.00
500.00 1,000.00
500.00 2,500.00
350.00 15,400.00
350.00 2,100.00
350.00 700.00
280.00 1,680.00
900.00 28,800.00
900.00 5,400.00
350.00 2,100.00
510.00 1,020.00
130.00 6,500.00
69,700.00
Err:509
Err:509
Err:509
Specification and Bill of Quantity for the Construction of Store
PROJECT NAME:- Kaliti General Store
CLIENT:- Addis Ababa Water& Sewerage Authority
Location:- Kaliti
Contractor:-
SUMMARY OF BOQ
DESCRIPTION ETH.BIRR
A.SUB-STRUCTURE
1 Excavation and Earth work Err:509
2 Concrete Work 218,448.70
3 Stone Masonry Work 110,330.00
SUB TOTAL A Err:509
SUPER-STRUCTURE
1 Concrete Work 347,431.52
2 Block Masonry 184,050.00
3 Finishing 272,162.40
4 Metal Work 454,672.21
5 Roof Work 429,420.00
6 Painting 26,599.94
7 Glazing 6,843.20
8 Electrical Installation 69,700.00
SUB TOTAL B 1,790,879.26
TOTAL Err:509
VAT(15%) Err:509
GRAND TOTAL Err:509