MANAGEMENT OF CHANGE PROCEDURE Netcore
MANAGEMENT OF CHANGE PROCEDURE Netcore
Remark
TABLE OF CONTENT
1. GENERAL
2. SCOPE
3. REFERENCE
4. DEFINITION OF TERMS
5. PROCEDURE
6. ATTACHMENT
2
DOC No:
NISNL/MOC/OP/001
1.0 General
The purpose of this procedure is to insure that all process changes in NISNL are
carried out without system failure. Any changes or amendments to NISNL
Quality System are planned, controlled and implemented to ensure effectiveness
and efficiency in NISNL services.
2.0 SCOPE
The scope of the procedure covers all process in NISNL undergoing change of
any kind. Process and change management provides facts for management
review decisions.
3.0 REFERENCE:
3
DOC No:
NISNL/MOC/OP/001
5.0 Procedure
5.1 General:
No matter how well planned, a quality system will need to change sooner
or later. Management of the process and the change is therefore both
possible and essential. However, Management of change must be carried out in
a formal and effective way to avoid any breakdown of the processes and
document control principles hence the QMR has the responsibility to give some
practical advice on how to make smooth changes to a quality system. The QMR
has the discretion to take action on urgent issues which however is to be
approved by the managing director prior to referring the matter for management
review.
Control of change to NISNL quality system could result from the following
The three (5.2.1, 5.2.2, 5.2.3) reasons above for changes should all produce real
benefits to NISNL. The system should be improved after the change than before
the change. However, the change to match the standard demands keeping
tracks of such standard and matching change to the updated revision of
standards.
5
DOC No:
NISNL/MOC/OP/001
5.4.1 Authorization:
Any change must be authorized in an agreed and defined way. Suggestion for
change may come from any process or person but authorization is reserved for
management review or directed to a quality management representative.
However, the managing director or his designate approves of these changes. All
changes are the result of a specific corrective action or as requested through
Amendment/Change Request form. This enables tracing back to specific
corrective action and reason for the change to be identified.
6
DOC No:
NISNL/MOC/OP/001
7
DOC No:
NISNL/MOC/OP/001
Phase 1: The Quality Team builds and educates the personnel on process management,
and also the process enterprise and the needed level of process maturity.
Phase 2: The Quality Team conducts initial trials of process management and enterprise
concept and techniques in selected work process.
Phase 3: The Quality Team integrates process thinking into day-to-day operations of the
company.
8
DOC No:
NISNL/MOC/OP/001
9
DOC No:
NISNL/MOC/OP/001
There are four possible that can happen during implementation of process management;
three of which are bad.
10
DOC No:
NISNL/MOC/OP/001
Damage Disaster
BAD
BAD GOOD
Change Management
11
DOC No:
NISNL/MOC/OP/001
5.0 Attachment
Attachment #1 - Amendment/Change Request form
Ref. No:
AMENDMENT/CHANGE REQUEST FORM Sht.:
Date:
Document No: Rev: Date:
DETAILS OF AMENDMENT/CHANGE REQUEST
S/N Sheet Section Clause/para. Change Propose
Nature of process:
Comments/Further Details: