Surveying I
Msc in Structure,DREM
Outlines
Introduction
Reading Materials
Table of Contents
History of Surveying
Purpose of Surveying
Basic concept of Surveying
Basic Measurement
Control Network
Locating Position
Introduction
Course assessment
Excellent 90-100 %
Very good 80- 89 %
Good 70- 79 %
Average 60- 69 %
Pass 50- 59 %
Fail 00- 49 %
Practical
Earth surface
Geoid
Basic Measurement
Most engineering surveys are carried out in small areas.
The reference surface may be taken tangent plane to the geoid, fig.
Knowing that for 200 KM 2 , the difference between the sum of the
spherical angles and the plane angles would = 1”.
Design of survey stations for CPs based mainly on the time of project
Long wooden peg with nail in middle and concrete around is enough for
most construction projects.
Control Network
Possible procedures for CPs
1) Reconnaissance.
1) Intersection or resection
2) Traversing
3) Networks
4) GPS satellites
Locating position
Positions of CPs could be known by polar coordinates (Total
station) or by GPS.
With total station (2 points should be known AB).
If positions of all points in network known, then details survey
starts.
Intersection
No check
Resection