0% found this document useful (0 votes)
169 views18 pages

Earthing: Disclaimer

Uploaded by

Palani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
169 views18 pages

Earthing: Disclaimer

Uploaded by

Palani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 18

National Grid Earthing

Technical Specification TS 3.01.02 (RES) - Issue 1 – October 2014

EARTHING

This document is for Relevant Electrical Standards document only.

Disclaimer
NGG and NGET or their agents, servants or contractors do not accept any liability for any losses arising under or in connection
with this information. This limit on liability applies to all and any claims in contract, tort (including negligence), misrepresentation
(excluding fraudulent misrepresentation), breach of statutory duty or otherwise. This limit on liability does not exclude or restrict
liability where prohibited by the law nor does it supersede the express terms of any related agreements."

TABLE OF CONTENTS

PURPOSE AND SCOPE .......................................................................................................................1


PART 1 – PROCEDURAL .....................................................................................................................1
1 GENERAL REQUIREMENTS .....................................................................................................1
2 PERFORMANCE REQUIREMENTS.........................................................................................12
3 DESIGN INFORMATION ..........................................................................................................13
4 TEST REQUIREMENTS ...........................................................................................................13
5 ACCEPTANCE PROCEDURE ..................................................................................................14
PART 2 - DEFINITIONS AND DOCUMENT HISTORY .......................................................................15
6 DEFINITIONS ...........................................................................................................................15
7 AMENDMENTS RECORD ........................................................................................................16
PART 3 – GUIDANCE NOTES AND APPENDICES ...........................................................................16
8 REFERENCES .........................................................................................................................16

PURPOSE AND SCOPE

This document describes the technical requirements for User’s equipment directly connected to the
England and Wales Transmission system and located within NGET’s busbar protection zone operating
at nominal voltages of 400 kV, 275 kV, 132 kV and 66 kV unless otherwise agreed with the user as
defined in the Bilateral agreement. The principles of this document applies to equipment connected at
other voltages”.

It supports the more general conditions defined in the companion documents TS 1 (RES) and TS 2.1
(RES).

PART 1 – PROCEDURAL

1 GENERAL REQUIREMENTS

The earthing system shall comply with EA TS 41-24, BS EN 50522 and BS 7430, unless
otherwise stated.

1.1 Statutory Requirements


The earthing system shall be designed and installed to comply with all relevant statutory
instruments.
Specifically, The Electricity Safety, Quality and Continuity Regulations 2002 require that:
“A generator or distributor shall ensure that, so far as is reasonably practicable, his network
does not become disconnected from earth in the event of any foreseeable current due to a
fault”.
Further requirements are contained in the Electricity at Work Regulations 1989 and
Management of Health and Safety at Work Regulations 1999.

Uncontrolled When Printed Page 1 of 18


National Grid Earthing
Technical Specification TS 3.01.02 (RES) - Issue 1 – October 2014

1.2 Earth Potential Rise (EPR)

1.2.1 The safety of all persons on high voltage sites, as well as in the immediate environs of such
sites, and persons who may contact any conducting services to, or passing through such
sites, is dependent on the design of the earthing system and its associated electrical
isolation. The design of the earthing system at substations shall limit the step and touch
potentials to safe levels given in Table 1.
Table 1 Touch and Step Potential Limits
Maximum Voltage for Touch Maximum Voltage for Step
Chippings surface Limit could not foreseeably
2.06kV
(150mm) be exceeded
Chippings surface Limit could not foreseeably
1.78kV
(75mm) be exceeded
Limit could not foreseeably
Soil surface 1.57kV
be exceeded

The limits in Table 1 assume a 200ms clearance time, a 1m step distance, a footwear
resistance of 4kΩ per shoe, and effective earth foot resistance values respectively. They are
based upon the approach agreed within BS EN 50522 UK national annex ‘A’.
Informative: Current design practices show that touch voltage has always been the more
critical design criteria, comparing to step voltage. As a key change to its 1994 version, IEC
60479-1 (2005) has since introduced the remarkable heart factor of 0.04 for step voltage
scenarios, which directly resulted in the values ‘Maximum Voltage for Step’ to be in excess
of 130kV. As the step voltage limit values are not foreseeable to be exceeded in reality,
following the convention of BS EN 50522 (2012), they are not listed in Table 1 above.
1.2.2 From earthing perspectives, cable sealing ends shall be treated as substations unless
otherwise agreed by NGET.

1.2.3 Critical third party EPR impact voltage thresholds via proximity effects are given in Table 2.

Informative: Although RES applies to where National Grid provides direct connections to the
Users,it is important to ensure that other 3rd parties are not affected inadvertantly due to
Proximity Effects. These limits will need to be reviewed pending the publication of the
revised ENATS 41-24.
Table 2 Third Party Impact Threshold Voltages via Proximity Effect **
Third Party Infrastructure Threshold Limit Voltage
Domestic residence or commercial property 1700V
Large hazardous process plant e.g. refinery 650V
Railways 645V

**: Proximity effect refers to EPR conduction via the ground

1.2.4 Where a NGET substation provides a HV connection to a third party, the applicable
threshold limit values via conduction are given belowTable 3.
Table 3 Third Party Impact Threshold Voltages via Conduction ***
Third Party Infrastructure Threshold Limit Voltage
Domestic residence or commercial property Not Applicable
Large hazardous process plant e.g. refinery 650V
Railways 645V

***: Conduction refers to electrical conduction via metallic conductors.

Uncontrolled When Printed Page 2 of 18


National Grid Earthing
Technical Specification TS 3.01.02 (RES) - Issue 1 – October 2014

1.2.5 The design of the earth electrode system (whether this is as a result of adding to an existing
system or the installation of new system), shall be optimised in so far as is reasonably
practical to ensure third party impact threshold voltages are within the limits in Table 2 and
Table 3.

Where reasonably practicable, the earthing system shall be designed using an earth return
current which is 20% greater than that calculated by NGET, to allow for future increases in
system fault current.

1.2.6 Calculations to design the main earth system shall be carried out using the MALZ module of
CDEGS software package (Current Distribution, Electromagnetic Fields, Grounding and Soil
Structure Analysis) or equivalent. The design models produced shall be made available once
completed and shall become the property of NGET as part of the contract.

1.2.7 Communication cables connecting to all NGET substations must be fitted with appropriate
electrical isolation.

1.3 Earth Electrodes

1.3.1 Earth electrodes shall be designed to operate satisfactorily during faults, taking into account
the area of the electrodes in contact with earth, the soil resistivity and earth electrode current
magnitude and duration, in accordance with BS 7430. The fault duration times to be used for
rating the electrodes are 1 second for 275kV and 400kV and 3 seconds for all other voltages.

1.3.2 The preferred burial depth of bare copper horizontal earth electrodes is 500mm. If the
indigenous soil is hostile to copper, see section 3.1.1 (b), the electrode shall be surrounded
by 150mm min of non-corrosive soil of fine texture, firmly rammed. Conductors installed in
ploughed farmland shall be buried at least 1m deep, at all points, measured from
undisturbed ground level.

1.3.3 Care shall be taken to whether soils could be hostile to copper, whether indigenous soils are
of high resistivity, as well as the use of back-fill materials, which are usually of high
resistivity. Guidance should be sought from EA TS 41-24 and BS 7430.

1.3.4 Driven rod electrodes in accordance with EA TS 43-94 shall be used to exploit lower resistivity
ground strata where present to reduce the EPR in accordance with clause 1.2. Where the
ground is hard and rods cannot be driven, consideration shall be given to drilling holes to
install the rods and back filling with a suitable low resistance fill material.

1.3.5 Special types of earth rods, e.g. Chem-Rod, may be employed, provided conventional
techniques could not meet the design requirements. Due to the use of chemicals, such
cases should be considered thoroughly, taking into account the environment concerns and
special maintenance needs. Appropriate agreement must be obtained with NGET prior to
use.

1.3.6 Where beneficial, reinforcing steelwork incorporated within piling may be connected to the
MES for the purpose of equipotential bonding and/or to form part of a common bonding
network (CBN). However, care must be taken to ensure that the current carrying capacity of
the steelwork is not exceeded.

Although it is acknowledged that buried concrete encased steel reinforcement can,


depending on certain conditions, constitute an effective earth electrode, it should not
normally be relied upon to provide an earth electrode as part of the earthing system design.

Where reinforcement steelwork in piles is connected to the MES, connections shall be made
to the vertical steel bars within the pile cap. Connections brought out through the pile cap shall
be provided with appropriate means to prevent moisture ingress into the cap. Current carrying
connections to and within the steelwork shall be in accordance with TS 2.1. Fortuitous
connections must not be relied upon. Welded connections are preferred.

Uncontrolled When Printed Page 3 of 18


National Grid Earthing
Technical Specification TS 3.01.02 (RES) - Issue 1 – October 2014

Where sheet steel piles of the interlocking kind are used as an earth electrode, connections
shall be made to each pile.

1.4 Earth Electrode Arrangement

1.4.1 Unless otherwise agreed by NGET, the earthing electrode arrangement shall be based on a
peripheral buried main bare earthing conductor generally encompassing the plant items to
be earthed, with buried spur connections, from the main conductor to the items of plant. The
main earthing conductor shall be augmented with inter-connected buried bare cross-
connections to form a grid. In addition, where beneficial, groups of earth rods distributed
around the periphery shall be connected to this main earthing conductor.

1.4.2 For indoor substations the earthing grid shall be installed with spur connections to the steel
reinforcing mat of the concrete floor, preferably every 20m. Additionally, a second peripheral
main earthing conductor shall be buried at 1m distance from the building, which shall be
bonded to the first main conductor, and to the building if it is metalclad, both at 20m intervals.
Earth rod groups shall be connected to the second peripheral conductor as described in
clause 1.4.1.

1.5 Test Facilities

1.5.1 In order to facilitate testing of all earth electrode groups, a section of conductor connecting to
each group shall be made accessible and shall have dimensions that would fit inside 50mm
diameter circular clamp meter jaws (min length 75mm). An example of how this can be
achieved is shown in Figure 1. This section of conductor shall be a part of a spur connection
to the rod group, i.e. so that all the test current flows into the rod group and is not diverted
into the main earth system. All testing points shall be identified both on the design earthing
drawings and within the test pit at site.

1.5.2 Disconnectable links must not be fitted in the connections from the main earth system to
terminal towers or rod groups or in the connections between main earth systems, e.g.
between earth systems on joint sites.

Figure 1 An example of earthing connection box with test facility*


*Note – The image shown above is without a lid and is meant to simply depict a surface
accessible earth test box. This box example is suitably dimensioned to allow the testing of
earth rod groups without disconnection in accordance with sections 1.5/1.6.

Uncontrolled When Printed Page 4 of 18


National Grid Earthing
Technical Specification TS 3.01.02 (RES) - Issue 1 – October 2014

1.6 More Than One HV Substation

1.6.1 Where the user’s and NGET substations earth grids are to be connected together by
underground conductors, at least two fully rated conductors, ideally taking secure separate
physical route, should be used. In order to facilitate testing of the interconnections, the
conductors connecting the systems together shall each be made accessible at a designated
point. At this point the conductors shall have dimensions which would fit inside a 50mm
diameter circular clamp meter jaws (min length of conductor 75mm). An example of how this
can be achieved is shown in Figure 1. All testing points shall be identified both on the design
earthing drawing and within the test pit at site.

1.6.2 Measures shall be taken to ensure that persons can not come into contact with hazardous
transferred potentials between substations or directly connected customers, particularly
where sites are separated. Where control of these potentials requires measures to be taken
by a third party, NGET shall be informed by the supplier at the time of production of the
earthing design.

1.6.3 In all cases where HV earthing systems are connected together, disconnectable test links
shall not be fitted.

1.7 Equipment Connected to the Main earth system

1.7.1 The connection of the following items of equipment to the main earthing system shall be fully
rated:

Informative: The connection to earth can be provided by more than one connection individual
connections i.e. via multiple earth paths.

a) All conductive parts which may sustain damages or become hazardous (to other
equipment or personnel) where there is a credible likelihood of direct power fault onto
them.

b) Transformer winding neutrals required for HV system earthing. For 66kV and below,
the connection may be via earthing resistors or other current limiting devices.

c) In the case of a manually operated earthing or HV switch, a dedicated fully rated


conductor shall be run from the handle or mechanism box to the main earth system as
directly as possible and this conductor shall pass under the stance position of the
person operating the switch. The conductor runs to any fault points associated with
the switch shall, where practicable, be maintained separate from the handle or
mechanism of the switch and connecting metalwork.

1.7.2 All metalwork, e.g. panels, cubicles, kiosks etc., including the steelwork of buildings, shall be
bonded to the main earth system, preferably by a conductor of no less than 70mm2 cross
section or a strip conductor no less than 3mm thick. The minimum conductor can be
reduced to 16mm2 where it is not reasonably practicable to install 70mm2 conductors,
provided the connection is secure.

1.7.3 For all substation fully rated flexible insulator strings, shunt conductors should be used
between the arcing ring adjacent to the structure and the earth bars on the structure, so as to
by-pass the major proportion of fault current under flashover conditions from the end fittings.

1.7.4 Metallic trench covers shall be earthed to cater for the possibility of an earth fault on cabling
in the trench and to cater for the possibility of induced or transferred potentials.

Uncontrolled When Printed Page 5 of 18


National Grid Earthing
Technical Specification TS 3.01.02 (RES) - Issue 1 – October 2014

1.8 Installation

Due regards should be given to the installations of earthing systems, following guidance in
EA TS 41-24 and other relevant standards. The following clauses in this section form NGET
practices hence are preferred methodologies.

1.8.1 Earthing conductors laid in trenches in outdoor substation compounds should be avoided
where possible due to the vulnerability of the copper to theft. Where this is unavoidable, the
earthing conductor should be protected from theft using the techniques detailed within
section 1.8.7.

Where a trench contains power cables and/or multicore cables, the earthing conductor shall
be fixed to the walls of the trench approximately 100mm from the top to maintain separation
from the cables.

1.8.2 Due regard shall be given to the possibility of mechanical damage to buried conductors and,
where necessary, either marker tapes and/or mechanical protection shall be installed. A
separation of at least 500mm to civil works, such as drainage pits, shall be maintained.
Conductor runs above ground shall be designed to minimise the possibility of mechanical
damage.

1.8.3 When laying stranded conductors, care shall be taken to avoid distorting individual strands.

1.8.4 Where below ground earthing conductors cross, they shall be jointed (other than in the case
of rod groups where these must be maintained separate to permit testing). Bolted joints are
not acceptable below ground other than for earth rod screw couplings which shall be
thoroughly greased. Connections to buried earth rods shall be welded.

1.8.5 Where earthing conductors terminate above ground, the connections shall as far as is
reasonably practical be made onto equipment surfaces in the vertical plane to avoid standing
water. Connections to metal cladding of buildings shall be made on the inside of the
building. Moreover, all bolted joints shall be situated at least 150mm above ground level.
Bolts and nuts with security features, shall be used, particularly to make the joints where
earth tapes are connected to equipment tank/base or structures.

1.8.6 Aluminium conductor used for earthing systems shall only be installed above 250mm from
ground level. All joint interfaces between the below ground copper earth conductors and the
above ground aluminium earth conductors shall be jointed to manage any potential galvanic
corrosion issue, to clause 1.8.5.

1.8.7 All vulnerable shallow buried earth tapes (tapes installed with less than 400mm of covering),
shall be protected from theft at 2m intervals with either concrete anchors or driven earth
rods.

1.8.8 Due to their vulnerability to theft, all above ground earthing conductors shall be fixed firmly
and tidily to structures at a spacing of no more than 200mm between fixings. The fixings
shall not promote galvanic corrosion. Where earthing conductor fixing systems require the
earth conductor to be drilled, checks shall be undertaken to ensure that the loss of cross
sectional area of the earthing conductor does not de-rate its operational performance
requirements.

Due to the lack of security fixing techniques for stranded conductors, where reasonably
practicable, flat copper tapes should be used for all above ground earthing conductors.

1.9 Steel Support Structures

1.9.1 Where the current carrying capacity of steel support structures is at least equal to the
switchgear rating, it is preferred that the structure is utilised to form part of the connection to

Uncontrolled When Printed Page 6 of 18


National Grid Earthing
Technical Specification TS 3.01.02 (RES) - Issue 1 – October 2014

the main earthing system, in which case there is no need to fix an earth conductor along this
section.

1.9.2 Where a steel structure is relied upon to provide an earth connection for supported
equipment, current carrying joints across the earth path within 2.4m of ground level shall be
bridged across with fully rated earth tapes. Above 2.4m, the normal structural joints are
considered adequate for electrical integrity during fault conditions.

1.9.3 Steel structures shall not be relied upon to conduct high frequency currents or for earth
connections to earth switches.

1.9.4 Where post insulators, other than those forming part of shunt connected equipment (e.g.
voltage transformers and surge arresters) are supported by a steel structure, the insulator
base does not require a bridging connection to the structure.

1.10 Fences

1.10.1 Measures shall be taken to ensure that dangerous touch or transferred potentials cannot
arise on substation fences.

1.10.2 Perimeter fences may be independently earthed using 4.8m long rod electrodes in
accordance with EA TS 41-24. Alternatively, perimeter fences may be connected to the main
earth system in accordance with EA TS 41-24 with permission from NGET.

1.10.3 Where a perimeter fence is independently earthed, 2m separation must be maintained


between the fence and the main earth system and any equipment connected to it.

1.10.4 Unless otherwise agreed by NGET, where a perimeter fence is connected to the main earth
system, then an additional buried bare conductor shall be installed 1m outside the fence
buried at a depth of 0.5m to control touch potentials. This conductor shall be connected to
the main earth system and fence at 50m min intervals and adequately protected from theft
using the techniques identified within section 1.8.

1.10.5 Metallic internal fences within the curtilage of the main earth system shall be connected to
the earthing system at 50m min intervals and at changes of direction and where power lines
cross overhead. Earth tapes should be protected from theft using the techniques identified
within section 1.8.

1.10.6 Where a fence, which is connected to the main earth system, abuts an independently
earthed fence they shall be electrically separated using either a non-metallic fence panel or
an insulating section having 5cm (approx) creepage at each end of a 2m section which is not
connected electrically to either of the fences. A suggested method of installation using
insulating bushes is shown in Figure 2.

An alternative to insulating bushes is to have a separate section of fence supported on its


own posts at either end and separated by a 5cm gap as illustrated in Figure 3. Note that this
is not suitable for security fences.

1.10.7 Most NGET perimeter fences are electrified, i.e. they are fitted with a secondary security
system of electrified conductors on the inside of the fence. These ‘power fence’ systems are
supplied via step-up transformers which provide inherent isolation between their LV supplies
(and hence the main earthing system) and their HV conductors. One pole of the HV
conductors must be connected to the perimeter fence earth to comply with current standards
and this is normally done by installing bonds between one pole of the HV conductors and the
fence at the fence corners. It is important that this power fence HV earth does not
compromise any fence insulating sections. This could inadvertently be done by connecting
the earthed HV pole to both an independently earthed fence and an MES earthed fence.
This should therefore be avoided by ensuring the power fence is earthed to only either the

Uncontrolled When Printed Page 7 of 18


National Grid Earthing
Technical Specification TS 3.01.02 (RES) - Issue 1 – October 2014

independently earthed fence or the MES earthed fence, or by having additional power fence
zones fed by separate step up transformers.

Electric Fence Sawcut


Panel

Panel Horizontal Rail


Paling

Protective Shroud (see detail) Insulator

PLAN VIEW

Outer Bolt

B
Fence Upright Steel
62mm
Section A - A 3mm

NOT TO SCALE 3mm


10.2mm
B Section B - B
25mm
Protective Shroud

Figure 2 An example installation of insulating bushes on palisade fence

Figure 3 An example arrangement of separately earthed fences


1.10.8 When it is necessary to fit ancillary equipment, e.g. security key pads, to independently
earthed perimeter fences, the equipment shall be effectively bonded to the fence. It is
important that the connections to the equipment do not inadvertently serve to connect the
equipment (and hence the fence) to the MES. Therefore the armouring of any Steel Wire
Armoured (SWA) cables should be insulated from the equipment, i.e. they should be cut
back at least 50mm from the cable gland and insulated. As an alternative, an insulating
cable gland plate may be used. The armour of the cable should remain earthed at the
remote end of the cable. No conductors (say from a multi-core conductor feeding the
equipment) should be allowed to provide a connection to the MES. A warning notice, as
shown in Figure 4 a), should be affixed to the equipment, to alert anyone carrying out
maintenance on it, that a transferred potential hazard exists. Note that it is preferred that

Uncontrolled When Printed Page 8 of 18


National Grid Earthing
Technical Specification TS 3.01.02 (RES) - Issue 1 – October 2014

where practicable a non-metallic junction box is used to reduce the risks from a
transferred potential hazard. The arrangements are illustrated in Figure 4.

a) Notice on equipment installed on independently earthed perimeter fences

b) Earthing arrangement

Figure 4 Typical earthing arrangement for equipment (e.g. key pad) installed
on independently earthed perimeter fences
1.10.9 When it is necessary to fit LVAC supplied equipment, e.g. gate motors, to independently
earthed perimeter fences, the LVAC supply to the gate shall not inadvertently serve to
connect the gate (and hence the fence) to the MES. Therefore LVAC supply should be
routed via an isolation transformer, ideally located where the supply is derived within the
substation. The arrangements are illustrated in Figure 5. The isolation transformer
2
enclosure should be connected to the MES via a 70mm min conductor. A warning notice,
as shown in Figure 5 a), should be affixed to the isolation transformer enclosure to alert
anyone carrying out maintenance on equipment within the enclosure that a transferred
potential hazard exists between the enclosure and its internals.

a) Notice on isolation transformer enclosure

Uncontrolled When Printed Page 9 of 18


National Grid Earthing
Technical Specification TS 3.01.02 (RES) - Issue 1 – October 2014

b) Detailed wiring and earthing connections

c) Overall view of LVAC supply and earthing arrangement


Figure 5 Typical earthing arrangement for LVAC supplies to gate motors
The armour of the SWA cable should be insulated from the isolation transformer enclosure,
i.e. it should be cut back at least 50mm from the cable gland and insulated. Alternatively an
insulating gland plate may be used. The armouring should be earthed at the motor junction
box on the gate via a cable gland. The neutral from the LVAC supply should be connected
via a 70mm2 earth continuity conductor (ECC) to the fence earth via the gate motor junction
box. A fence earth rod should be installed at this location and connected directly to the motor
junction box earth bar.

No conductors (say from a multi-core conductor to the gate) should be allowed to provide a
connection from the gate to the MES.

1.10.10 A cable having a metallic covering effectively in contact with the ground or a bare conductor
which passes underneath an independently earthed fence shall be covered with insulation
for a distance of 2m on either side of the fence. For example this may be achieved by
running the conductor in an alkethene pipe 2m either side of the fence.

1.10.11 Where galvanised steel chain link internal fencing is used, a separate earth conductor
(70mm2 min) shall be installed along the fence and shall be connected to each section of
fence every 10m or less and to the main earth system at 50m intervals.

1.10.12 Where plastic coated steel chain link internal fencing is used, connection (70mm2 min) to the
main earthing system shall be made at all fence guide wire anchor points.

Uncontrolled When Printed Page 10 of 18


National Grid Earthing
Technical Specification TS 3.01.02 (RES) - Issue 1 – October 2014

1.10.13 Earthing connections to the perimeter fence shall be via a conductor which shall be
accessible and shall have dimensions which would fit inside 50mm diameter circular clamp
meter jaws. Where bolted joints are used to connect to the fence, these shall be protected
from the environment.

1.11 Access/Egress Gates and Hinged Height Barriers

1.11.1 Access/egress gates and hinged height barriers are not required to be bonded to their
supporting posts. Note that this should not be confused with the requirement to cross bond
between gate and barrier supporting posts, and that this requirement should still be met.

1.12 Temporary Fences

1.12.1 Temporary metallic fences shall be installed with appropriate measures to limit touch or
transferred potentials to safe levels.

1.12.2 An internal metallic fence within the curtilage of the main earth system shall be connected to
the main earth system at 50m intervals, at changes of direction and where power lines cross
overhead.

1.12.3 Where a temporary metallic fence which is connected to the main earth system abuts an
independently earthed fence they shall be electrically separated in accordance with EA TS
41-24.

1.12.4 A fence outside the curtilage of the main earth system may present a greater hazard where it
crosses the ground voltage profile. In this case, in order to limit the transferred potential, the
fence shall either be non-metallic or shall have its sections electrically insulated from each
other at intervals depending on the ground voltage profile at the site.

1.13 Terminal Towers and Gantries Supporting HV Conductors

1.13.1 Where the earth wire of an incoming Overhead Line (OHL) terminates on a tower it shall be
connected to the top of the tower.

1.13.2 The terminal tower/gantry shall be directly connected to the adjacent substation main earth
system.

1.13.3 Where a terminal tower leg is within 2m of an independently earthed fence, the affected
sections of fence shall be connected to the tower and insulated sections fitted either side of
the affected sections.

1.14 LV Distribution Transformers

This section should be read in conjunction with TS 3.12.3 (RES) in respect of the earthing
connection arrangements for LV supplies.

1.14.1 The earthing and isolation of DNO derived LV distribution transformers associated with
NGET substations shall be designed assuming that the substation EPR is greater than 650V
rms. Appropriate mitigation measures shall be agreed with the local DNO to manage the
hazards associated with step/touch/transferred potentials seen under fault conditions on the
NGET network.

1.14.2 The incoming HV supply earth shall be electrically isolated from the substation MES at a
minimum level of 10kV rms. This may be achieved (for cable fed HV supplies) through the
use of HV cable sheath insulating gland or a HV cable sheath barrier joint. Where an
insulating gland is used this shall be clearly labelled to indicate a transferred potential
hazard. For pole mounted transformers, the transformer earthing shall be configured so as to
prevent the export of EPR directly from the substation into the DNO HV network. The DNO
would normally achieve this by segregating the HV and LV earthing.

Uncontrolled When Printed Page 11 of 18


National Grid Earthing
Technical Specification TS 3.01.02 (RES) - Issue 1 – October 2014

1.14.3 An LV distribution transformer, which supplies a NGET substation, must not be used to
provide LV supplies external to the substation, other than to an adjacent DNO or Generator
Operator, which effectively share a common earthing system with that of the NGET
substation.

1.15 Gas Insulated Substations (GIS)

The earthing requirements for gas insulated substations are substantially dependent on the
particular type of equipment and its configuration. For this reason, the earthing arrangements
should principally be determined by the supplier in conjunction with the manufacturer.
However, the following minimum requirements shall apply, unless it can be demonstrated by
the supplier/manufacturer that they are not required:

The main earth system shall be well integrated in the regions close to equipment with short
spur connections taken to specific points. The GIS floor rebar system shall be connected to
the MES at frequent intervals throughout the installation to provide an overall conductive
mesh and this should not be relied upon to carry fault current. Connections to the MES,
together with direct connections between phases shall be made at all line, cable and
transformer terminations, at busbar terminations and at approximately 20m min intervals in
busbar runs. Inter-phase connections shall be rated to carry induced currents resulting from
the flow of rated normal current in the primary conductors. As a guide, the resistance of the
bonded flanges should not exceed 5μΩ.

1.15.1 The earthing arrangements shall, in so far as is reasonably practicable, minimise the
possibility of external arcing due to high frequency transients during switching operations.

1.15.2 The earthing arrangements shall ensure that circulating currents in supporting steelwork etc.
are below levels which could result in hazards to persons or electrical interference with
electronic equipment.

1.16 Substation Lightning Protection Systems

1.16.1 Where required, lightning protection systems shall be in accordance with BS EN 62305. All
lightning protection system conductors shall be connected to the substation main earthing
system.

1.17 Design Life of the Installation

All parts of the earthing installation, both below and above ground, shall have a design life of
40 years taking into account the anticipated corrosion of the conductors resulting from site
chemical pollution.

2 PERFORMANCE REQUIREMENTS

2.1 Conductors

2.1.1 All conductors which may carry fault point current shall be fully rated. Earth conductors shall
be rated so as not to exceed the maximum temperatures in Table 5a. Corresponding
maximum current densities for a 30°C ambient are given in Table 5b. Duplex or loop
connections shall be de-rated by a minimum of 40% to allow for unequal current sharing.
Preferred conductor sizes for copper and aluminium conductors are given in Table 5c.

Maximum recommended conductor


Type of conductor
temperature during a short circuit
Bare conductors, solid or stranded: Cu 405oC
Bare conductors, solid or stranded: Al or Al alloy 325oC
Bare conductors, solid or stranded: steel 300oC
Table 5a Highest Temperatures for Non- Mechanically Stressed Conductors

Uncontrolled When Printed Page 12 of 18


National Grid Earthing
Technical Specification TS 3.01.02 (RES) - Issue 1 – October 2014

Current density for 1sec Current density for


Type of conductor
duration (A/mm2) 3secs duration (A/mm2)
Copper 212 123
Aluminium 130 75
Galvanised Steel 80 45
Table 5b Maximum Conductor Current Densities

Short-circuit
current 63kA/1sec 40kA/1sec 40kA/3secs
requirement
Type of Spur Duplex Spur Duplex Spur Duplex
d
Copper 50x6mm 50x4m 50x4mm 40x3m 50x7mm 50x4mm
Aluminium 75x6.5mm 50x6m 50x7mm 50x4m 75x8mm 50x7mm
Table 5c Preferred Conductor Sizes

3 DESIGN INFORMATION

3.1.1 The designer of the earth electrode system should consider the following:

a) The site soil resistivity profile and suitability for driving earth rods (see Appendix A for
measurement methods)

b) The chemical and/or physical nature of the site soil structure. For example, the
presence of corrosive soils (acids, nitrates, sulphides, sodium silicates, ammonium
chlorides, sulphur dioxides, etc.) should be considered in the design of an earthing
system with a 40 years life design requirement.

c) Details of the civil engineering structures existing, or to be built on site shall be


ascertained to determine if the reinforcing steelwork incorporated within the structures
or piling can be used as an earth electrode.

d) For existing sites, the latest site earthing survey

e) The earth return current and the switchgear rating

f) Existing third party infrastructure, including future known developments, in the vicinity
of the substation

3.1.2 If available, NGET will provide the supplier with some or all of the above information. The
availability of this information will be stated in the tender document.

4 TEST REQUIREMENTS

4.1.1 Validation by electrical measurement of any design is required for all installed systems to
confirm the satisfactory installation and design of the system. All measurements shall be
recorded. NGET reserves the right to witness all tests. The measurement methods are
outlined in Appendix A.

4.1.2 The resistance to earth of all individual rods and rod groups shall be measured and
recorded. Where the measured resistance of an individual rod is more than 50% higher than
the average for the site the reason shall be investigated and the rod(s) re-installed if
necessary.

4.1.3 The total substation earth electrode impedance shall be measured using the AC Fall of
Potential Method and the result recorded. The measured result shall be compared with that
predicted by calculation and any significant difference investigated. On some sites it may not

Uncontrolled When Printed Page 13 of 18


National Grid Earthing
Technical Specification TS 3.01.02 (RES) - Issue 1 – October 2014

be practicable to carry out this measurement due to the surrounding environment and it may
be necessary to rely on calculation alone. In this case, careful attention must be given to
establishing accurate data for the calculation, e.g. the soil resistivity profile, the layout of the
main earth system, and any interactions between earthing systems owned by others.

4.1.4 For transmission towers, as far as is reasonably practicable, both the footing resistance and
the chain impedance shall be measured.

4.1.5 Tests of all electrical joints shall be made. Wherever specific acceptable criteria are not
available, as a principle guide, the measured resistance across a joint should not be more
than that of a plain conductor of similar length. For instance, half a meter of 50mm×6mm
copper tape would typically present a resistance value of ~25μΩ.

4.1.6 The supplier, at the request of NGET, may be required to excavate in order to reveal earth
conductor joints for testing, or to demonstrate correct installation to drawing.

5 ACCEPTANCE PROCEDURE

5.1.1 The supplier shall provide evidence that the tests described in this document have been
carried out satisfactorily. The test results shall be recorded.

5.1.2 The supplier shall provide evidence that the necessary precautions have been taken to
prevent unsafe touch, step and transferred potentials from arising.

5.1.3 The supplier shall provide documentation to demonstrate that the earthing installation
complies with this document and includes with it EPR contour plots showing 430V, 650V,
1150V and 1700V contours overlaid onto an OS map (see also section 1.2.6).

The map accuracy should be checked during site assessment to include all 3rd party
properties within the proximity with detail of its occupation.

5.1.4 The supplier shall provide a drawing detailing the new below ground earthing layout. Where
an earthing system has been modified or extended, the existing drawing should be updated
to reflect the changes. Where reasonably practicable, existing drawings should be
consolidated onto a minimum number of new CAD drawings to depict the whole site earthing
system. This may require the recreation of some legacy drawings which are presently in out
of date formats.

5.1.5 All results shall be submitted, preferably within an earthing report, and become the property
of NGET as part of the contract.

Uncontrolled When Printed Page 14 of 18


National Grid Earthing
Technical Specification TS 3.01.02 (RES) - Issue 1 – October 2014

PART 2 - DEFINITIONS AND DOCUMENT HISTORY

6 DEFINITIONS
Cold Site A site at which the earth potential rise is less than or equal to 650V rms (based
on a 200ms clearance time).
Earth The conductive mass whose electric potential at any point is conventionally taken as
zero.

Earth Electrode A conductor or group of conductors in intimate contact with, and providing
an electrical contact to earth.

Earth Electrode Area The area contained by the earth electrode system.

Earth Electrode Current The maximum value of current which the total substation earth
electrode resistance may be required to conduct. In single earthed neutral systems fitted
with current limiting devices the maximum earth electrode current is limited by that device
unless there are secure parallel circuits offering an alternative current path to that provided
by the earth electrode resistance.

Earth Return Current The proportion of fault point current which returns to source via the
ground.

Earth Electrode Resistance The resistance of an earth electrode with respect to earth.

Fault Point Current The maximum value of current which could flow at any fault point. This
shall be taken as the single-phase short-circuit rating (or three-phase if higher) of the
installed switchgear, unless otherwise specified by NGET.

Fully Rated Rated to carry 63kA for 1s at 400kV, 40kA for 1s at 275kV and 31.5kA or 40kA
(special application) for 3s at 132kV.

Ground Voltage Profile The radial ground surface potential around an earth electrode
referenced with respect to earth.

Hot Zone The internal area encompassed by a contour representing points at which the
EPR is greater than 650V rms (based on a 200ms clearance time).

Main Earth System (MES) The complete interconnected assembly of earthing conductors
and earth electrodes which are intended to carry HV system fault current.

Other Earth System Earth conductors which are part of the System (as defined in NGET
Safety Rules) but which are not part of the Main Earth System.

Earthing System Earth conductors which are part of either the Main Earth System or Other
Earth System.

Earth Potential Rise (EPR) The voltage difference between the substation metalwork and
earth due to fault current. It is calculated from the product of the total substation earth
electrode impedance and the current flowing through it. EPR was previously known, in many
national and industrial documents, as RoEP (Rise of Earth Potential).

Step Potential/Voltage The electrical potential between two points, on the surface of the
ground, bridgeable between a person's feet, due to a ground voltage profile. The step
distance is assumed to be 1m.

Uncontrolled When Printed Page 15 of 18


National Grid Earthing
Technical Specification TS 3.01.02 (RES) - Issue 1 – October 2014

Touch Potential/Voltage The electrical voltage between two points, for instance
predominantly bridgeable by a person's hand(s) and feet, due to a ground voltage profile.
The touch distance is assumed to be 1m. For occasions, hand-to-hand touch voltage may
need considerations.

Total Substation Earth Electrode Resistance The resistance of the main earth system
and other connected electrodes with respect to earth.

Total Substation Earth Electrode Impedance The impedance of the main earth system
and other connected electrodes with respect to earth.

Transferred Potential An electrical potential between two points due to a ground voltage
profile which is transferred to the points by a conducting object.

7 AMENDMENTS RECORD

Summary of Changes / Approved By


Issue Date Author(s)
Reasons (Inc. Job Title)
October Dongsheng Guo
1 New document GCRP
2014 - Asset Policy

7.1 Procedure Review Date

5 years from publication date.

PART 3 – GUIDANCE NOTES AND APPENDICES

8 REFERENCES

This document makes reference to or shall be read in conjunction with the documents listed
below:
The Health and Safety at Work Act, 1974
The Electricity at Work Regulations, 1989, Statutory Instrument No 635
The Electricity Safety, Quality and Continuity Regulations 2002, Statutory Instrument No
2665
Electricity Supply Regulations 1988, Statutory Instrument No 1057
Electricity Supply (Amendment) Regulations 1990, Statutory Instrument No 390
The Management of Health and Safety at Work Regulations, 1999, Statutory Instrument No
3242
DD IEC/TS 60479-1 International Electrotechnical Commission, Effects of Current on Human
Beings and Livestock - Part 1: General Aspects
BS EN 50341 Overhead lines exceeding AC 45kV
BS EN 50522 Earthing of power installations exceeding 1kV a.c.
BS EN 60228 Conductors of insulates cables
BS EN 62305 Protection against lightning
BS 638:Part4 Arc welding power sources equipment and accessories, Part 4. Specification
for welding cables

Uncontrolled When Printed Page 16 of 18


National Grid Earthing
Technical Specification TS 3.01.02 (RES) - Issue 1 – October 2014

BS 6004 Electric cables — PVC insulated, non-armoured cables for voltages up to and
including 450/750 V, for electric power, lighting and internal wiring
BS 7354 Code of Practice for Design of High Voltage Open Terminal Substations
BS 7430 Code of practice for Earthing 2011 (Formerly CP 1013: 1965)
Department for Transport (DfT): The Manual of Contract Documents for Highway Works
(MCHW), Volume 1 - Specification for Highway Works, Series 0800 - Road Pavements -
Unbound, Cement and Other Hydraulically Bound Mixtures
(http://www.dft.gov.uk/ha/standards/mchw/vol1/pdfs/series_0800.pdf)
EA TS 41-24 Guidelines for the Design, Installation, Testing and Maintenance of Main
Earthing Systems in Substations, Issue 1: 1992
EA TS 34 A Guide for Assessing the Rise of Earth Potential at Substation Sites, May 1986
EA TS 36-1, Procedure to Identify and Record hot Substations, 2007
EA TS 43-94 Earth Rods and their Connectors, Issue 3, 1990
ITU-T K.33 Limits for people safety related to coupling into telecommunications system from
a.c. electric power and a.c. electrified railway installations in fault conditions (previously
CCITT Recommendation)
CCITT Directive, Volume VII, Protective Measures and Safety Precautions
Earth Resistances, G F Tagg, George Newnes, London, 1964

Uncontrolled When Printed Page 17 of 18


National Grid Earthing
Technical Specification TS 3.01.02 (RES) - Issue 1 – October 2014

APPENDIX A: MEASUREMENT METHODS

MEASUREMENT OF EARTH ROD AND EARTH ROD GROUP RESISTANCE

Unless otherwise agreed by NGET, individual earth rod and rod group resistances shall be measured.
The measurement may be made using the circulating current method with respect to the main earthing
system, provided the main earth system has a very much lower resistance compared with the rod or
rod group. Care must also be taken to ensure that the voltage profile overlap of the main earth system
and the rod or rod group does not significantly affect the measurement.

MEASUREMENT OF TOTAL SUBSTATION EARTH ELECTRODE IMPEDANCE

The total substation earth electrode impedance shall be measured using the AC Fall of Potential
Method [1]. The 61.8% rule or the Slope Method must not be used.

MEASUREMENT OF TOWER FOOTING RESISTANCE OR CHAIN IMPEDANCE

Where the OHL earth wire is not connected to the tower, the tower footing resistance shall be
measured using the Fall of Potential Method [1]. The 61.8% rule or the Slope Method must not be
used.

Where the OHL earth wire is connected to the tower, the tower chain impedance shall be measured
using the AC Fall of Potential Method [1]. The 61.8% rule or the Slope Method must not be used.

MEASUREMENT OF SOIL RESISTIVITY

Sufficient resistivity measurements shall be made to determine a suitably accurate soil model. The
number of measurements will normally depend on the homogeneity of the ground.

Soil resistivity shall be measured in accordance with BS 7430. The method described is also known as
the Wenner Method. Resistivity shall be measured up to a depth of 60m where reasonably practicable.
No less than two pairs of measurements shall be made at separate locations on site (each pair
consists of two traverses at 90o to each other).

Ref [1]: Earth Resistances, Tagg G F, George Newnes, London 1964.

© National Grid 2014

“© 2014 Copyright owned by National Grid Electricity Transmission plc, all rights reserved.

No part of this publication may be reproduced in any material form (including photocopying and restoring in any
medium or electronic means and whether or not transiently or incidentally) without the written permission of
National Grid Electricity Transmission plc, except:

1. To the extent that any party who is required to comply (or is exempt from complying) with the provisions
under the Electricity Act 1989 reasonably needs to reproduce this publication to undertake its licence or
statutory duties within Great Britain (or any agent appointed so as to act on that party’s behalf); and

2. In accordance with the provisions of the Copyright, Design’s and Patents Act 1988.

Uncontrolled When Printed Page 18 of 18