0% found this document useful (0 votes)
48 views

International Certification Services PVT - LTD

The document provides a daily progress report for the revamping of fire protection systems at ONGC installations in Mehsana Asset. It details the manpower status and work completed on May 4th, 2021 at the Balol GGS-1 site. Excavation, foundation work, and RCC work for the F/W tank and pump house building are reported as completed. Structure work for the pump house is reported as 9.7465 MT completed, with roof and landing platform/ladder work still in progress.
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views

International Certification Services PVT - LTD

The document provides a daily progress report for the revamping of fire protection systems at ONGC installations in Mehsana Asset. It details the manpower status and work completed on May 4th, 2021 at the Balol GGS-1 site. Excavation, foundation work, and RCC work for the F/W tank and pump house building are reported as completed. Structure work for the pump house is reported as 9.7465 MT completed, with roof and landing platform/ladder work still in progress.
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

PROJECT: REVAMPING OF FIRE PROTECTION SYSTEM AT INSTALLATIONS OF MEHSANA ASSET (RFPS-MHN)

Client : Oil and natural Gas Corporation Ltd.


TPIA : International Certification Services Pvt.Ltd.
Contractor : M/S Hitek Engineering Services
DAILY PROGRESS REPORT
Manpower Status Date 04.05.2021
1 RCM/Construction Maneger Nos. 4 7 Safety Nos. 5
2 Site Supervisor Nos. 3 Name of TPI

3 Site Engineers Nos. 4 8 PPE Issued Nos. 54 Civil

4 Civil labour Nos. 7 9 Total Hitek Nos. 54 Mechanical


Manpower

5 Mechanical labour Nos. 27 Safety (1)Keyur Parmar (2) Nilesh kumar (3) Sudip (4)Hitesh makwana (5) Yesh sharma Safety
Officer Hitek

6 Welder Nos. 4 Note : At NK1,NK2 and NK3 site closed today due to ONGC not allowing work inside GGS. Electrical/Instrumentation
Work Summary Total
Quality and safety
Completion Qty. check/remarks/inspectionobservations by
concerened TPI
Total
SL. NO. Description Unit Total Qty. Balance Qty Action taken by LSTK on the
Compl. oservations of TPIS Remarks
Cumulative Qty
Upto Today approval status of refered documents such as
Previous Day drawing procedures /itp etc .

1 Site name : Balol GGS-I


1.1 F/W tank
i Excavation Cum. 128.1 128.1 0 128.1 0 Completed
ii Steel work of Foundation ,Pedestal and footing No's 21 21 0 21 0 Completed
iii PCC for footing Cum. 9.45 9.45 0 9.45 0 Completed
iv RCC work of Column Pedestal Cum. 16.464 16.464 0 16.464 0 Completed
v Steel work of Raft KG 24419.2 24419.2 0 24419.2 0 Completed
vi RCC work of Raft Cum. 105 105 0 105 0 Completed
vii Wall's Cum. 66 66 0 66 0
viii Landing Platform and Ladder No's 1 0 1 Landing Platform and Ladder pre-fabrication work in
progress.
1.2 Pump House Building
i Excavation work M3 71 71 0 71 0 Completed
ii Pump House Foundation (Steel Work) Nos. 8 8 0 8 0 Completed
a Soling & PCC work M3 4.704 4.704 0 4.704 0 Completed
b Footing work M3 23.2 23.2 0 23.2 0 Completed
iii Column M3 5.49 5.49 0 5.49 0 Completed
iv RCC Wall M3 4.318 4.318 0 4.318 0 Completed
v RCC Floor M3 13.5 13.5 0 13.5 0 Grad slab RCC work completed and curing work in
progress.
vi Structure work MT 9.7465 9.7465 9.7465 0 Completed
vii Roof M2 0 0 Completed
viii Pump Set Foundation M3 8.79 8.79 0 8.79 0 Completed
ix HOT Crane No. 1 1 1 0 Completed
x Monorail No. 1 1 1 0 Completed
Pump house Structure No. 1 1 1 0 Completed
1.2 Pipe Sleeper : Civil Part
i Excavation Nos. 216 210 0 210 6
ii RCC Pedestal Nos. 216 216 0 216 0 Completed
iii Sand Filling/PCC(M:15) Nos. 216 210 0 210 6
iv Erection of RCC Pedestal Nos. 216 210 0 210 6
Backfiiling of RCC Pedestal after Erection Nos. 216 210 0 210 6
1.3 Piping: Mech. Part
i Erection of Network piping MTR 1147 1136.1 0 1136.1 10.9
ii Erection of Spray piping MTR 0 External pipe support foundation concrete work
completed 28/28 and now J bolt fixing work
iii Erection of Foam Piping MTR 120 120 completed 28/28.
1.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 1 0 1 0 erection completed.
ii Motor Driven FWP Nos. 1 1 0 1 0 erection completed.
iii Jockey Pump Nos. 2 2 0 2 0 erection completed.
iv Monitors Nos. 13 13 0 13 0 Hydrants and Monitors erection work done and
v Hydrants Nos. 15 15 0 15 0 Trunnion support fabrication and erection work in
vi Hose cabinets Nos. 15 0 0 0 15 progress.
vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 30 0 0 0 30
viii Extinguishers Nos. 2 0 0 0 2
ix Foam Chamber Nos. 18 0 0 0 18
1.5 Valves: Mech. Part
i Deluge valve Nos. 0 Deluze valve assembly erection work in porgress.
ii Foam Nozzles Nos. 18 0 0 0 18
iii Spray Nozzles Nos. 234 0 0 0 234
iv Gate Valve Nos. 37 37 0 37 0
v Globe Valve Nos. 1 1 0 1 0
vi Check Valve (NRV) Nos. 14 4 4 10
vii Y- Strainers Nos. 4 4 0 4 0 erection completed.
1.6 Electrical and Instrumentation
i Transformer Nos. 0
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 0 1
xi PLC based FWP Panel with HMI Nos. 1 1 0 1 0 erection completed.
1.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos.
ii Topic of discussion
Discuss about Gas hazards and precation against Covid-19
iii Special instructions
iv No of person attended tool box meeting Nos. 6
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos. 1
d Welding Booths Nos.
e List of Safety Items
i Helmet Nos. 6
ii Gloves Nos. 4
iii Fire Extinguishers Nos. 2
f No. of Person Having PPE Nos. 6
2 Site name : Balol GGS-II
1.1 Reservoir
i Excavation Cum. 0
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
1.2 Pump House Building
i Excavation work M3 294 0 0 0 294
ii Pump House Foundation Nos. 8 0 0 0 8
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M2 0
viii Pump Set Foundation M3 0
ix HOT Crane No. 0
x Monorail No. 1 0 0 0 1
1.2 Pipe Sleeper : Civil Part
i Excavation Nos. 142 138 138 4 4 no's trunnion support erection completed.
ii RCC Pedestal Nos. 142 142 0 142 0
iii Sand Filling/PCC(M:15) Nos. 142 138 138 4
iv Erection of RCC Pedestal Nos. 142 138 138 4
Backfiiling of RCC Pedestal after Erection Nos. 142 138 138 4
1.3 Piping: Mech. Part
i Erection of Network piping Mtr. 792 776.9 776.9 15.1
ii Erection of Spray piping Mtr. 0
iii Erection of Foam Piping Mtr. 0

1.4 Fire Fighting Equipments: Mech. Part


i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 9 9 0 9 0
v Hydrants Nos. 11 11 0 11 0
vi Hose cabinets Nos. 11 0 0 0 11
vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 22 0 0 0 22
viii Extinguishers Nos. 2 0 0 0 2
ix Foam Chamber Nos. 2 0 0 0 2
1.5 Valves: Mech. Part
i Deluge valve Nos. 0 Deluze valve assembly erection work in porgress.
ii Foam Nozzles Nos. 2 0 0 0 2
iii Spray Nozzles Nos. 136 0 0 0 136
iv Gate Valve Nos. 28 25 0 25 3
v Globe Valve Nos. 1 0 0 0 1
vi Check Valve (NRV) Nos. 11 0 0 0 11
vii Y- Strainers Nos. 4 0 0 0 4
1.6 Electrical and Instrumentation
2 pole structure and transformer column shuttering
i Transformer Nos. 0 RCC work done.
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
1.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Balol GGS-II
ii Topic of discussion
Discuss regarding covid safety and regarding inportant of PPE's
iii Special instructions
iv No of person attended tool box meeting Nos.
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos.
d Welding Booths Nos.
e List of Safety Items
i Helmet Nos.
ii Gloves Nos.
iii Fire Extinguishers Nos.
f No. of Person Having PPE Nos.
3 Site name : Balol GGS-III
1.1 Reservoir
i Excavation Cum. 0
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
1.2 Pump House Building
Independent support foundation RCC work
i Excavation work M3 294 0 0 0 294
completed.
ii Pump House Foundation Nos. 8 0 0 0 8
a Soling & PCC work M3 0 work done.
b Footing work M3 0
iii Column M3 0 Bar binding work in progress.
iv RCC Wall M3 0
v RCC Floor M3 0

vi Structure work MT 0 Monorail structure 6/6 column erection


completed.Monorail beam erection work completed.

vii Roof M2 0
viii Pump Set Foundation M3 0
ix HOT Crane No. 0
x Monorail No. 1 0 0 1
1.2 Pipe Sleeper : Civil Part
i Excavation Nos. 215 205 205 10 Trunnion support fabrication and erection work
in progress.
ii RCC Pedestal Nos. 215 215 215 0
iii Sand Filling/PCC(M:15) Nos. 215 205 205 10
iv Erection of RCC Pedestal Nos. 215 205 0 205 10
Backfiiling of RCC Pedestal after Erection Nos. 215 205 0 205 10
1.3 Piping: Mech. Part
i Erection of Network piping Mtr. 1053 1037 1037 16
ii Erection of Spray piping Mtr. 0 independent support 4 no's concrete completed.
iii Erection of Foam Piping Mtr. 95 95
1.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2 Temporary jockey pump erection completed.

iv Monitors Nos. 14 14 0 14 0

v Hydrants Nos. 14 14 0 14 0
vi Hose cabinets Nos. 11 0 0 0 11
vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 22 0 0 0 22
viii Extinguishers Nos. 2 0 0 0 2
ix Foam Chamber Nos. 0 0 0 0
1.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 2 0 0 0 2
iii Spray Nozzles Nos. 120 0 0 0 120
iv Gate Valve Nos. 36 36 0 36 0
v Globe Valve Nos. 1 0 0 0 1
vi Check Valve (NRV) Nos. 11 0 0 0 11
vii Y- Strainers Nos. 4 0 0 0 4
1.6 Electrical and Instrumentation
i Transformer Nos. 0
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
1.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. Balol GGS-3
ii Topic of discussion Nos. Discuss about Gas hazards and precation against
iii Special instructions Nos. Covid-19
iv No of person attended tool box meeting Nos.
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos.
d Welding Booths Nos.
e List of Safety Items Nos.
i Helmet Nos.
ii Gloves Nos.
iii Fire Extinguishers Nos.
f No. of Person Having PPE Nos.

4 Site name : Balol GGS-IV


1.1 Reservoir
i Excavation Cum. 0
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
1.2 Pump House Building
i Excavation work M3 0 0 0 0
Monorail support foundation excvation work
ii Pump House Foundation Nos. 0 0 0 0 completed and 6/6 nos foundation RCC work
completed.
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M2 0
viii Pump Set Foundation M3 0
ix HOT Crane No. 0
x Monorail No. 1 0 0 0 1
1.2 Pipe Sleeper : Civil Part
i Excavation Nos. 170 165 0 165 5
ii RCC Pedestal Nos. 170 170 0 170 0
iii Sand Filling/PCC(M:15) Nos. 170 165 0 165 5
iv Erection of RCC Pedestal Nos. 170 165 0 165 5
Backfiiling of RCC Pedestal after Erection Nos. 170 165 0 165 5
1.3 Piping: Mech. Part
i Erection of Network piping Mtr. 1167 1131.9 0 1131.9 35.1 .
ii Erection of Spray piping Mtr. 0
iii Erection of Foam Piping Mtr. 110 110
1.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 11 11 0 11 0
Hydrants and Monitors erection work done and
Trunnion support fabrication and erection work in
v Hydrants Nos. 14 14 0 14 0 progress.

vi Hose cabinets Nos. 14 0 0 0 14


vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 28 0 0 0 28
viii Extinguishers Nos. 2 0 0 0 2
ix Foam Chamber Nos. 0
1.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 2 0 0 0 2
iii Spray Nozzles Nos. 72 0 0 0 72
iv Gate Valve Nos. 33 33 0 33 0
v Globe Valve Nos. 0
vi Check Valve (NRV) Nos. 0
vii Y- Strainers Nos. 0
1.6 Electrical and Instrumentation
i Transformer Nos. 0 Foundation raft RCC work completed.
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 0
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
1.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. Balol GGS-IV
ii Topic of discussion
Precaution for covid and hight work safety.
iii Special instructions
iv No of person attended tool box meeting Nos.
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos.
d Welding Booths Nos.
e List of Safety Items
i Helmet Nos.
ii Gloves Nos.
iii Fire Extinguishers Nos.
f No. of Person Having PPE Nos.
5 Site name : JOTANA GGS
1.1 Reservoir
i Excavation Cum. 0
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
1.2 Pump House Building
i Excavation work M3 294 0 0 0 294
ii Pump House Foundation Nos. 8 0 0 0 8
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M2 0
viii Pump Set Foundation M3 0
ix HOT Crane No. 0
x Monorail No. 1 0 0 1 0
1.2 Pipe Sleeper : Civil Part
i Excavation Nos. 223 212 0 212 11
ii RCC Pedestal Nos. 223 223 0 223 0
iii Sand Filling/PCC(M:15) Nos. 223 212 0 212 11
iv Erection of RCC Pedestal Nos. 223 212 0 212 11
Backfiiling of RCC Pedestal after Erection Nos. 223 212 0 212 11
1.3 Piping: Mech. Part
i Erection of Network piping Mtr. 1102 1054.4 1054.4 47.6 Pipe painting third coat painting work in progress.
ii Erection of Spray piping Mtr. 0
iii Erection of Foam Piping Mtr. 0
1.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 16 16 16 0
v Hydrants Nos. 14 14 14 0
vi Hose cabinets Nos. 14 0 0 0 14
vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 28 0 0 0 28
viii Extinguishers Nos. 2 0 0 0 2
ix Foam Chamber Nos. 0
1.5 Valves: Mech. Part

i Deluge valve Nos. 0 Deluge valve Spool assemby pre- fabrication work in
progress.
ii Foam Nozzles Nos. 4 0 0 0 4
iii Spray Nozzles Nos. 84 0 0 0 84
iv Gate Valve Nos. 42 26 10 36 6
v Globe Valve Nos. 1 0 0 0 1
vi Check Valve (NRV) Nos. 13 0 0 0 13
vii Y- Strainers Nos. 4 0 0 0 4
1.6 Electrical and Instrumentation
i Transformer Nos. 0 Two pol and transformer PCC wor completed.
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
1.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. Jotana GGS
ii Topic of discussion
Discussed regarding covid safety.
iii Special instructions
iv No of person attended tool box meeting Nos.
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos.
d Welding Booths Nos.
e List of Safety Items
i Helmet Nos.
ii Gloves Nos.
iii Fire Extinguishers Nos.
f No. of Person Having PPE Nos.
6 Site name : BECHARAJI GGS-I
1.1 Reservoir
i Excavation Cum. 0
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
1.2 Pump House Building
i Excavation work M3 294 0 0 0 294
ii Pump House Foundation Nos. 8 0 0 0 8
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M2 0
viii Pump Set Foundation M3 0
ix HOT Crane No. 0
x Monorail No. 1 0 0 0 1
1.2 Pipe Sleeper : Civil Part
i Excavation Nos. 262 256 256 6
ii RCC Pedestal Nos. 262 262 0 262 0
iii Sand Filling/PCC(M:15) Nos. 262 256 256 6
iv Erection of RCC Pedestal Nos. 262 256 256 6
Backfiiling of RCC Pedestal after Erection Nos. 262 256 256 6
1.3 Piping: Mech. Part

i Erection of Network piping Mtr. 1790 1768.1 1768.1 21.9 Wrapping coating work in progree for
underground piping.
ii Erection of Spray piping Mtr. 0
iii Erection of Foam Piping Mtr. 0
1.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 23 3 0 3 20
v Hydrants Nos. 21 21 21 0
vi Hose cabinets Nos. 21 21 21 0
vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 42 0 0 0 42
viii Extinguishers Nos. 3 0 0 0 3
ix Foam Chamber Nos. 0 0 0 0 0
1.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 0 0 0 0 0
iii Spray Nozzles Nos. 344 0 0 0 344
iv Gate Valve Nos. 235 2 0 2 233
v Globe Valve Nos. 1 0 0 0 1
vi Check Valve (NRV) Nos. 17 0 0 0 17
vii Y- Strainers Nos. 4 0 0 0 4
1.6 Electrical and Instrumentation
i Transformer Nos. 0
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
1.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. Becharaji GGS-1
ii Topic of discussion
Discuss regarding site safety ,Covid 19 precation
iii Special instructions
iv No of person attended tool box meeting Nos. 17
b No of Hot work permits issued Nos. 1
c No of cold Work Permit Issued Nos. 1
d Welding Booths Nos. 2
e List of Safety Items
i Helmet Nos. 17
ii Gloves Nos. 15
iii Fire Extinguishers Nos. 2
f No. of Person Having PPE Nos. 17
7 Site name : BECHARAJI GGS-II
1.1 Reservoir
i Excavation Cum. 0
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
1.2 Pump House Building
i Excavation work M3 294 0 0 0 294
ii Pump House Foundation Nos. 8 0 0 0 8
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M2 0
viii Pump Set Foundation M3 0
ix HOT Crane No. 0
x Monorail No. 1 0 0 1
1.2 Pipe Sleeper : Civil Part
i Excavation Nos. 158 134 134 24
ii RCC Pedestal Nos. 158 158 158 0
iii Sand Filling/PCC(M:15) Nos. 158 134 134 24
iv Erection of RCC Pedestal Nos. 158 134 0 134 24
Backfiiling of RCC Pedestal after Erection Nos. 158 134 0 134 24
1.3 Piping: Mech. Part
i Erection of Network piping Mtr. 782 36.8 24.4 61.2 720.8 10 no's T support erection and welding work done.
ii Erection of Spray piping Mtr. 0
iii Erection of Foam Piping Mtr. 0
1.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 11 0 0 0 11
v Hydrants Nos. 12 0 0 0 12
vi Hose cabinets Nos. 12 0 0 0 12
vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 24 0 0 0 24
viii Extinguishers Nos. 3 0 0 0 3
ix Foam Chamber Nos. 0 0 0 0
1.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 0 0 0 0 0
iii Spray Nozzles Nos. 84 0 0 0 84
iv Gate Valve Nos. 135 0 0 0 135
v Globe Valve Nos. 1 0 0 0 1
vi Check Valve (NRV) Nos. 12 0 0 0 12
vii Y- Strainers Nos. 4 0 0 0 4
1.6 Electrical and Instrumentation
i Transformer Nos. 0
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
1.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. Becharaji GGS-II
ii Topic of discussion
Discuss regarding site safety ,Covid 19 precation
iii Special instructions
iv No of person attended tool box meeting Nos. 12
b No of Hot work permits issued Nos. 1
c No of cold Work Permit Issued Nos. 1
d Welding Booths Nos. 2
e List of Safety Items
i Helmet Nos. 12
ii Gloves Nos. 10
iii Fire Extinguishers Nos. 2
f No. of Person Having PPE Nos. 12
8 Site name : NORTH KADI GGS-I
2.1 Reservoir
i Excavation Cum. 0
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
2.2 Pump House Building
footing excavation work completed and dressing work
i Excavation work M3 294 294 0 294 0
in progress.
ii Pump House Foundation Nos. 8 0 0 0 8
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M4 0
viii Pump Set Foundation M5 0
ix HOT Crane No. 0
x Monorail No. 1 0 0 0 1
2.2 Pipe Sleeper : Civil Part
i Excavation Nos. 139 139 139 0
ii RCC Pedestal Nos. 139 139 139 0
iii Sand Filling/PCC(M:15) Nos. 139 139 139 0
iv Erection of RCC Pedestal Nos. 139 139 139 0
Backfiiling of RCC Pedestal after Erection Nos. 139 139 139 0
2.3 Piping: Mech. Part
i Erection of Network piping Mtr. 1270 1083.4 1083.4 186.6 underground road crossing work in progress.
ii Erection of Spray piping Mtr. 0
iii Erection of Foam Piping Mtr. 0
2.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 19 19 0 19 0
v Hydrants Nos. 15 15 0 15 0
vi Hose cabinets Nos. 15 0 0 0 15
vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 30 0 0 0 30
viii Extinguishers Nos. 3 0 0 0 3
ix Foam Chamber Nos. 0 0 0 0
2.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 4 0 0 0 4
iii Spray Nozzles Nos. 220 0 0 0 220
iv Gate Valve Nos. 48 28 28 20
v Globe Valve Nos. 1 0 0 0 1
vi Check Valve (NRV) Nos. 15 0 0 0 15
vii Y- Strainers Nos. 4 0 0 0 4
2.6 Electrical and Instrumentation
i Transformer Nos. 0
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
2.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. NK GGS-1
ii Topic of discussion
Discuss regarding site safety ,Covid 19 precation
iii Special instructions
iv No of person attended tool box meeting Nos.
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos.
d Welding Booths Nos.
e List of Safety Items
i Helmet Nos.
ii Gloves Nos.
iii Fire Extinguishers Nos.
f No. of Person Having PPE Nos.
9 Site name : NORTH KADI GGS-II
2.1 Reservoir
i Excavation Cum. 0
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
2.2 Pump House Building
i Excavation work M4 294 0 0 0 294
ii Pump House Foundation Nos. 8 0 0 0 8
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M4 0
viii Pump Set Foundation M5 0
ix HOT Crane No. 0
x Monorail No. 1 0 0 0 1
2.2 Pipe Sleeper : Civil Part
i Excavation Nos. 202 195 195 7
ii RCC Pedestal Nos. 202 202 202 0
iii Sand Filling/PCC(M:15) Nos. 202 195 195 7
iv Erection of RCC Pedestal Nos. 202 195 195 7
Backfiiling of RCC Pedestal after Erection Nos. 202 195 195 7
2.3 Piping: Mech. Part
i Erection of Network piping Mtr. 945 607.8 607.8 337.2
ii Erection of Spray piping Mtr. 0
iii Erection of Foam Piping Mtr. 0
2.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 14 14 14 0
Spool peace pre-fabrication work in progress.
v Hydrants Nos. 13 13 13 0
vi Hose cabinets Nos. 13 0 0 0 13
vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 26 0 0 0 26
viii Extinguishers Nos. 3 0 0 0 3
ix Foam Chamber Nos.
2.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 4 0 0 0 4
iii Spray Nozzles Nos. 160 0 0 0 160
iv Gate Valve Nos. 35 0 0 0 35
v Globe Valve Nos. 1 0 0 0 1
vi Check Valve (NRV) Nos. 5 0 0 0 5
vii Y- Strainers Nos. 4 0 0 0 4
2.6 Electrical and Instrumentation
i Transformer Nos. 0
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
2.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. North Kadi GGS-II
ii Topic of discussion
Precation for covid-19 and inportants of PPE.
iii Special instructions
iv No of person attended tool box meeting Nos.
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos.
d Welding Booths Nos.
e List of Safety Items
i Helmet Nos.
ii Gloves Nos.
iii Fire Extinguishers Nos.
f No. of Person Having PPE Nos.
10 Site name : NORTH KADI GGS-III
2.1 Reservoir
i Cleaning Grading work and excavation work Cum. 324 324 0 324 0
ii Steel work of Foundation & Pedestal No's 21 0 0 21
iii RCC work of Foundation & Pedestal Cum. 0
Steel work of Raft No's 0
RCC work of Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
1.2 Pump House Building
i Cleaning Grading work and excavation work M3 170 170 0 170 0
ii Pump House Foundation (Steel Work) Nos. 8 0 0 8
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M2 0
viii Pump Set Foundation M3 0
ix HOT Crane No. 0
x Monorail No. 1 0 0 0 1
i Excavation Cum. 0
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
2.2 Pipe Sleeper : Civil Part
i Excavation Nos. 255 250 250 5
ii RCC Pedestal Nos. 255 255 255 0
iii Sand Filling/PCC(M:15) Nos. 255 250 250 5
iv Erection of RCC Pedestal Nos. 255 250 250 5
v Backfiiling of RCC Pedestal after Erection Nos. 255 250 250 5
2.3 Piping: Mech. Part
i Erection of Network piping Mtr. 1060 999.2 0 999.2 60.8
ii Erection of Spray piping Mtr. 0
iii Erection of Foam Piping Mtr. 0
2.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 15 15 15 0
Pre fabrication spool erection work in progress.
v Hydrants Nos. 15 15 15 0
vi Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 30 0 0 0 30
vii Hoses cabinet Nos. 15 0 0 0 15
viii Extinguishers Nos. 3 0 0 0 3
ix Foam Chamber Nos.
2.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 4 0 0 0 4
iii Spray Nozzles Nos. 204 0 0 0 204
iv Gate Valve Nos. 40 23 2 25 15
v Globe Valve Nos. 1 0 0 0 1
vi Check Valve (NRV) Nos. 16 0 0 0 16
vii Y- Strainers Nos. 4 0 0 0 4
2.6 Electrical and Instrumentation
i Transformer Nos. 0 Foundation excavation work in progress.
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 0
viii Level guages Nos. 0
ix Level Transmitters Nos. 1 1
x Flow Meter Nos. 1 0 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
2.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. NK GGS-3
ii Topic of discussion
Discuss regarding site safety ,Covid 19 precation
iii Special instructions
iv No of person attended tool box meeting Nos.
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos.
d Welding Booths Nos.
e List of Safety Items
i Helmet Nos.
ii Gloves Nos.
iii Fire Extinguishers Nos.
f No. of Person Having PPE Nos.
11 Site name : NORTH KADI GGS-IV
2.1 Reservoir
i Excavation Cum. 0
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
2.2 Pump House Building
i Excavation work M4 294 0 0 0 294
ii Pump House Foundation Nos. 8 0 0 0 8
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M4 0
viii Pump Set Foundation M5 0
ix HOT Crane No. 0
x Monorail No. 1 1 0 1 0
2.2 Pipe Sleeper : Civil Part
i Excavation Nos. 240 217 217 23
ii RCC Pedestal Nos. 240 240 240 0
iii Sand Filling/PCC(M:15) Nos. 240 200 200 40
iv Erection of RCC Pedestal Nos. 240 194 194 46
v Backfiiling of RCC Pedestal after Erection Nos. 240 194 194 46
2.3 Piping: Mech. Part
i Erection of Network piping Mtr. 1391 0 0 0 1391
ii Erection of Spray piping Mtr. 0
iii Erection of Foam Piping Mtr. 0
2.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 17 0 0 0 17
v Hydrants Nos. 20 0 0 0 20
vi Hose cabinets Nos. 40 0 0 0 40
vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 20 0 0 0 20
viii Extinguishers Nos. 3 0 0 0 3
ix Foam Chamber Nos. 16 0 0 0 16
2.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 16 0 0 0 16
iii Spray Nozzles Nos. 238 0 0 0 238
iv Gate Valve Nos. 48 0 0 0 48
v Globe Valve Nos. 1 0 0 0 1
vi Check Valve (NRV) Nos. 16 0 0 0 16
vii Y- Strainers Nos. 4 0 0 0 4
2.6 Electrical and Instrumentation
i Transformer Nos. 0
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 1 0 1 0
xi PLC based FWP Panel with HMI Nos. 0
2.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. North Kadi GGS-IV
ii Topic of discussion
Discuss regarding site safety ,Covid 19 precation
iii Special instructions
iv No of person attended tool box meeting Nos.
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos.
d Welding Booths Nos.
e List of Safety Items
i Helmet Nos.
ii Gloves Nos.
iii Fire Extinguishers Nos.
f No. of Person Having PPE Nos. 0
12 Site name : LANWA GGS-I
1.1 F/W tank
F/W tank footing raft 21/21 no's completed and
curing work in progress
i Excavation Cum. 128.1 128.1 0 128.1 0 Footing raft column 21/21 completed and curing work
in progress.
final layer backfilling and compection work work in
progress.

ii Steel work of Foundation ,Pedestal and footing No's 21 21 0 21 0 Completed


iii PCC for footing Cum. 9.45 9.45 0 9.45 0 Completed
iv RCC work of Column Pedestal Cum. 16.464 16.464 0 16.464 0 Sump raft concrete curing work in progress.
v Steel work of Raft KG 24419.2 0 0 24419.2
vi RCC work of Raft Cum. 105 0 0 0 105
vii Wall's Cum. 66 0 0 0 66
viii Landing Platform and Ladder No's 1 1 Jockey pump foundation RCC work completed.
1.2 Pump House Building Completed
i Excavation work M3 71 71 0 71 0 Completed
ii Pump House Foundation (Steel Work) Nos. 8 8 0 8 0 Completed
a Soling & PCC work M3 4.704 4.704 0 4.704 0 Completed
b Footing work M3 23.2 23.2 0 23.2 0 Completed
iii Column M3 5.49 5.49 0 5.49 0 Completed
iv RCC Wall M3 4.318 4.318 0 4.318 0
v RCC Floor M3 13.5 13.5 0 13.5 0 Completed
vi Structure work MT 9.7465 9.7465 9.7465 0 Completed
vii Roof M2 0 0 Completed
viii Pump Set Foundation M3 8.79 8.79 0 8.79 0 completed
ix HOT Crane No. 1 1 1 0 completed
x Monorail No. 1 1 1 0
Pump house Structure No. 1 1 1 0
1.3 Pipe Pedestal
ii RCC Pedestal Nos. 88 88 0 88 0 Completed
iii Sand Filling/PCC(M:15) Nos. 88 77 77 11
iv Erection of RCC Pedestal Nos. 88 77 77 11
v Backfiiling of RCC Pedestal after Erection Nos. 88 77 77 11
2.3 Piping: Mech. Part
F/w pump house suction header fabrication work in
i Erection of Network piping Mtr. 395 389.1 0 389.1 5.9 progress. 2nd coat of painting work in progress for fire
water netwrok.
ii Erection of Spray piping Mtr. 0
iii Erection of Foam Piping Mtr. 0
2.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1 Erection work done.
ii Motor Driven FWP Nos. 1 0 0 0 1 Erection work done.
iii Jockey Pump Nos. 2 0 0 0 2 Sand filling and compaction work in progress.

iv Monitors Nos. 5 5 0 5 0 Erection completed

v Hydrants Nos. 6 6 0 6 0 Erection completed

vi Hose cabinets Nos. 12 12


vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 24 0 0 0 24
viii Extinguishers Nos. 3 0 0 0 3
ix Foam Chamber Nos. 0 0 0
2.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 0 0
iii Spray Nozzles Nos. 56 56
iv Gate Valve Nos. 16 16 0 16 0 Erection completed
v Globe Valve Nos. 1 1
vi Check Valve (NRV) Nos. 9 9
vii Y- Strainers Nos. 4 4
2.6 Electrical and Instrumentation
i Transformer Nos. 0
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 1 1
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
2.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. Lanwa GGS-I
ii Topic of discussion
site safety and covid 19 precations
iii Special instructions
iv No of person attended tool box meeting Nos.
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos.
d Welding Booths Nos.
e List of Safety Items
i Helmet Nos.
ii Gloves Nos.
iii Fire Extinguishers Nos.

f No. of Person Having PPE Nos.

13 Site name : LANWA GGS-II


1.1 Reservoir
i Excavation Cum. 0 0 0 0
ii Steel work of Foundation & Pedestal No's 0 0 0 0
iii RCC work of Foundation & Pedestal Cum. 0
Steel work of Raft No's 0
RCC work of Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
2.1 Pump House Building
i Excavation work M3 71 71 0 71 0 Work completed
ii Pump House Foundation (Steel Work) Nos. 8 8 0 8 0 Column erection work in progress.
a Soling & PCC work M3 4.704 4.704 0 4.704 0
b Footing work M3 23.2 23.2 0 23.2 0
iii Column M3 5.49 5.49 0 5.49 0 Backfilling and compaction work in progress..
iv RCC Wall M3 4.318 0 0 4.318
v RCC Floor M3 13.5 0 0 13.5
Pump house structure erection completed and roof
vi Structure work MT 9.7465 0 9.7465
erection work in progress.
vii Roof M2 0 0
viii Pump Set Foundation M3 8.79 8.79 0 8.79 0
ix HOT Crane No. 1 1 0
x Monorail No. 1 0 1
Pump house Structure No. 1 0 1
2.2 Pipe Pedestal
i Excavation Nos. 160 146 0 146 14
ii RCC Pedestal Nos. 160 160 160 0
iii Sand Filling/PCC(M:15) Nos. 160 146 146 14
iv Erection of RCC Pedestal Nos. 160 146 146 14
v Backfiiling of RCC Pedestal after Erection Nos. 160 146 146 14
2.3 Piping: Mech. Part
i Erection of Network piping Mtr. 769 757.3 757.3 11.7 Painting 3rd cote work completed.
ii Erection of Spray piping Mtr. 0
iii Erection of Foam Piping Mtr. 0
2.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 6 6 0 6 0
v Hydrants Nos. 12 12 0 12 0
vi Hose cabinets Nos. 12 0 0 0 12
vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 24 0 0 0 24
viii Extinguishers Nos. 3 0 0 0 3
ix Foam Chamber Nos. 0
2.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 0 0 0 0 0
iii Spray Nozzles Nos. 131 0 0 0 131
iv Gate Valve Nos. 33 32 0 32 1
v Globe Valve Nos. 1 0 0 0 1
vi Check Valve (NRV) Nos. 13 0 0 0 13
vii Y- Strainers Nos. 4 0 0 0 4
2.6 Electrical and Instrumentation
i Transformer Nos. 0
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 1 0 1 0
xi PLC based FWP Panel with HMI Nos. 0
2.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. Lanwa GGS-2
ii Topic of discussion
Discuss about Gas hazards and precation against Covid-19
iii Special instructions
iv No of person attended tool box meeting Nos.
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos.
d Welding Booths Nos.
e List of Safety Items
i Helmet Nos.
ii Gloves Nos.
iii Fire Extinguishers Nos.
f No. of Person Having PPE Nos.

14 Site name : LANWA GGS-III


2.1 Reservoir
i Excavation Cum. 0
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
2.2 Pump House Building
i Excavation work M4 294 0 0 0 294
ii Pump House Foundation Nos. 8 0 0 0 8
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M4 0
viii Pump Set Foundation M5 0
ix HOT Crane No. 0
x Monorail No. 1 1 0 1 0
2.2 Pipe Sleeper : Civil Part
i Excavation Nos. 173 164 164 9
ii RCC Pedestal Nos. 173 173 0 173 0
iii Sand Filling/PCC(M:15) Nos. 173 164 164 9
iv Erection of RCC Pedestal Nos. 173 164 164 9
v Backfiiling of RCC Pedestal after Erection Nos. 173 164 164 9
2.3 Piping: Mech. Part
3rd coat pinting work in progress.underground
i Erection of Network piping Mtr. 851 820 0 820 31 Road crossing excavation and back filling work in
progress.
ii Erection of Spray piping Mtr. 0
Independent support RCC work completed.
iii Erection of Foam Piping IMtr. 0
2.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 12 12 12 0 Spool Pre-fabrication work in progress.
Trunnion support erection and welding work in
v Hydrants Nos. 12 12 12 0 progress.
vi Hose cabinets Nos. 12 0 0 0 12
vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 24 0 0 0 24
viii Extinguishers Nos. 3 0 0 0 3
ix Foam Chamber Nos. 0
2.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 6 6
iii Spray Nozzles Nos. 90 90
iv Gate Valve Nos. 29 14 0 14 15
v Globe Valve Nos. 13 13
vi Check Valve (NRV) Nos. 0
vii Y- Strainers Nos. 0
2.6 Electrical and Instrumentation
Two pole and transformer foundation exacaation
i Transformer Nos. 0 completed.
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
2.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. Lanwa GGS-3
ii Topic of discussion
Discuss about Gas hazards and precation against Covid-19
iii Special instructions
iv No of person attended tool box meeting Nos. 11
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos. 1
d Welding Booths Nos.
e List of Safety Items
i Helmet Nos. 11
ii Gloves Nos. 9
iii Fire Extinguishers Nos. 2
f No. of Person Having PPE Nos. 11

15 Site name : LAGNAGH EPS


2.1 Reservoir Man Power Deployed: Last Day ….Nos./This Day ….Nos.
i Excavation Cum. 0
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
2.2 Pump House Building
i Excavation work M4 294 0 0 0 294
ii Pump House Foundation Nos. 8 0 0 0 8
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M4 0
viii Pump Set Foundation M5 0
ix HOT Crane No. 0
x Monorail No. 1 1 0 1 0
2.2 Pipe Sleeper : Civil Part
i Excavation Nos. 88 0 0 0 88 pipe sleepers precast completed
ii RCC Pedestal Nos. 88 88 0 88 0
iii Sand Filling/PCC(M:15) Nos. 88 0 0 0 88
iv Erection of RCC Pedestal Nos. 88 0 0 0 88
v Backfiiling of RCC Pedestal after Erection Nos. 88 0 0 0 88
2.3 Piping: Mech. Part Man Power Deployed: Last Day……. Nos./This Day……Nos.
i Erection of Network piping Inch-Mtr. 0
ii Erection of Spray piping Inch-Mtr. 0
iii Erection of Foam Piping Inch-Mtr. 0
2.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 9 0 0 0 9
v Hydrants Nos. 9 0 0 0 9
vi Hose cabinets Nos. 18 0 0 0 18
vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 27 0 0 0 27
viii Extinguishers Nos. 3 0 0 0 3
ix Foam Chamber Nos. 0 0
2.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 0 0
iii Spray Nozzles Nos. 0 0
iv Gate Valve Nos. 23 23
v Globe Valve Nos. 1 1
vi Check Valve (NRV) Nos. 7 7
vii Y- Strainers Nos. 4 4
2.6 Electrical and Instrumentation
i Transformer Nos. 0
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
2.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos.
ii Topic of discussion
iii Special instructions
iv No of person attended tool box meeting Nos.
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos.
d Welding Booths Nos.
e List of Safety Items
i Helmet Nos.
ii Gloves Nos.
iii Fire Extinguishers Nos.
f No. of Person Having PPE Nos.
16 Site name : SOBHASAN GGS-I
2.1 Reservoir
i Excavation Cum. 0
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
2.2 Pump House Building
i Excavation work M4 294 0 0 0 294
ii Pump House Foundation Nos. 8 0 0 0 8
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M4 0
viii Pump Set Foundation M5 0
ix HOT Crane No. 0
x Monorail No. 1 1 0 1 0
2.2 Pipe Sleeper : Civil Part
i Excavation Nos. 86 82 0 82 4
ii RCC Pedestal Nos. 86 86 86 0
iii Sand Filling/PCC(M:15) Nos. 86 82 0 82 4
iv Erection of RCC Pedestal Nos. 86 82 0 82 4
v Backfiiling of RCC Pedestal after Erection Nos. 86 82 0 82 4
2.3 Piping: Mech. Part
i Erection of Network piping Mtr. 508 0 0 0 508
ii Erection of Spray piping Mtr. 0
iii Erection of Foam Piping Mtr. 0
2.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 9 0 0 0 9
v Hydrants Nos. 8 0 0 0 8
vi Hose cabinets Nos. 16 0 0 0 16
vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 16 0 0 0 16
viii Extinguishers Nos. 3 0 0 0 3
ix Foam Chamber Nos. 0 0 0 0 0
2.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 0 0
iii Spray Nozzles Nos. 148 148
iv Gate Valve Nos. 22 22
v Globe Valve Nos. 1 1
vi Check Valve (NRV) Nos. 16 16
vii Y- Strainers Nos. 4 4
2.6 Electrical and Instrumentation
i Transformer Nos. 0
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
2.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. Sobhasan-GGS-1
ii Topic of discussion
Precation against covid 19 .
iii Special instructions
iv No of person attended tool box meeting Nos.
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos.
d Welding Booths Nos.
e List of Safety Items
i Helmet Nos.
ii Gloves Nos.
iii Fire Extinguishers Nos.
f No. of Person Having PPE Nos.
17 Site name : SOBHASAN GGS-II
2.1 Reservoir
i Excavation Cum. 0

ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
2.2 Pump House Building
i Excavation work M4 294 0 0 0 294
ii Pump House Foundation Nos. 8 0 0 0 8
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M4 0
viii Pump Set Foundation M5 0
ix HOT Crane No. 0
x Monorail No. 1 1
2.2 Pipe Sleeper : Civil Part
i Excavation Nos. 169 166 0 166 3 Pipe pedestal alliment work in progress.
ii RCC Pedestal Nos. 169 169 169 0
iii Sand Filling/PCC(M:15) Nos. 169 166 0 166 3
iv Erection of RCC Pedestal Nos. 169 166 0 166 3
v Backfiiling of RCC Pedestal after Erection Nos. 169 166 0 166 3 compection work completed for all pipe pedestal.
2.3 Piping: Mech. Part

i Erection of Network piping Mtr. 1000 0 0 0 1000


ii Erection of Spray piping Mtr. 0
iii Erection of Foam Piping Mtr. 0
2.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 20 0 0 0 20
v Hydrants Nos. 14 0 0 0 14

vi Hose cabinets Nos. 14 0 0 0 14


vii Hoses Nos. 28 0 0 0 28
viii Extinguishers Nos. 3 0 0 0 3
ix Foam Chamber Nos. 0
2.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 4 4
iii Spray Nozzles Nos. 150 150
iv Gate Valve Nos. 40 40
v Globe Valve Nos. 1 1
vi Check Valve (NRV) Nos. 18 18
vii Y- Strainers Nos. 0
2.6 Electrical and Instrumentation
i Transformer Nos. 0
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
2.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. Sobhasan-GGS-2
ii Topic of discussion
Precaution against covid 19 .
iii Special instructions
iv No of person attended tool box meeting Nos.
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos.
d Welding Booths Nos.
e List of Safety Items
i Helmet Nos.
ii Gloves Nos.
iii Fire Extinguishers Nos.
f No. of Person Having PPE Nos.
Two pole structure foundation J-bolt fixing work completed.
18 Site name : SOBHASAN WWTP
2.1 Reservoir Man Power Deployed: Last Day ….Nos./This Day ….Nos.
i Excavation Cum. 0
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
2.2 Pump House Building Man Power Deployed: Last Day……. Nos./This Day……Nos.
i Excavation work M4 294 0 0 0 294
ii Pump House Foundation Nos. 8 0 0 0 8
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M4 0
viii Pump Set Foundation M5 0
ix HOT Crane No. 0
x Monorail No. 1 0 0 1
2.2 Pipe Sleeper : Civil Part
i Excavation Nos. 174 90 0 90 84
ii RCC Pedestal Nos. 174 174 0 174 0
iii Sand Filling/PCC(M:15) Nos. 174 75 75 99
iv Erection of RCC Pedestal Nos. 174 75 75 99
v Backfiiling of RCC Pedestal after Erection Nos. 174 75 75 99
2.3 Piping: Mech. Part
i Erection of Network piping Mtr. 1306 0 0 0 1306

ii Erection of Spray piping Inch-Mtr. 0


iii Erection of Foam Piping Inch-Mtr. 0
2.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 22 0 0 0 22
v Hydrants Nos. 19 0 0 0 19
vi Hose cabinets Nos. 19 0 0 0 19
vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 38 0 0 0 38
viii Extinguishers Nos. 3 0 0 0 3
ix Foam Chamber Nos. 0
2.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 4 4
iii Spray Nozzles Nos. 160 160
iv Gate Valve Nos. 51 51
v Globe Valve Nos. 1 1
vi Check Valve (NRV) Nos. 10 10
vii Y- Strainers Nos. 4 4
2.6 Electrical and Instrumentation
i Transformer Nos. 0
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
2.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. Shobhasan WWTP
ii Topic of discussion
Discuss regarding covid -19 precautions and inportant of PPE's
iii Special instructions
iv No of person attended tool box meeting Nos.
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos.
d Welding Booths Nos.
e List of Safety Items
i Helmet Nos.
ii Gloves Nos.
iii Fire Extinguishers Nos.
f No. of Person Having PPE Nos.