International Certification Services PVT - LTD
International Certification Services PVT - LTD
5 Mechanical labour Nos. 27 Safety (1)Keyur Parmar (2) Nilesh kumar (3) Sudip (4)Hitesh makwana (5) Yesh sharma Safety
Officer Hitek
6 Welder Nos. 4 Note : At NK1,NK2 and NK3 site closed today due to ONGC not allowing work inside GGS. Electrical/Instrumentation
Work Summary Total
Quality and safety
Completion Qty. check/remarks/inspectionobservations by
concerened TPI
Total
SL. NO. Description Unit Total Qty. Balance Qty Action taken by LSTK on the
Compl. oservations of TPIS Remarks
Cumulative Qty
Upto Today approval status of refered documents such as
Previous Day drawing procedures /itp etc .
vii Roof M2 0
viii Pump Set Foundation M3 0
ix HOT Crane No. 0
x Monorail No. 1 0 0 1
1.2 Pipe Sleeper : Civil Part
i Excavation Nos. 215 205 205 10 Trunnion support fabrication and erection work
in progress.
ii RCC Pedestal Nos. 215 215 215 0
iii Sand Filling/PCC(M:15) Nos. 215 205 205 10
iv Erection of RCC Pedestal Nos. 215 205 0 205 10
Backfiiling of RCC Pedestal after Erection Nos. 215 205 0 205 10
1.3 Piping: Mech. Part
i Erection of Network piping Mtr. 1053 1037 1037 16
ii Erection of Spray piping Mtr. 0 independent support 4 no's concrete completed.
iii Erection of Foam Piping Mtr. 95 95
1.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2 Temporary jockey pump erection completed.
iv Monitors Nos. 14 14 0 14 0
v Hydrants Nos. 14 14 0 14 0
vi Hose cabinets Nos. 11 0 0 0 11
vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 22 0 0 0 22
viii Extinguishers Nos. 2 0 0 0 2
ix Foam Chamber Nos. 0 0 0 0
1.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 2 0 0 0 2
iii Spray Nozzles Nos. 120 0 0 0 120
iv Gate Valve Nos. 36 36 0 36 0
v Globe Valve Nos. 1 0 0 0 1
vi Check Valve (NRV) Nos. 11 0 0 0 11
vii Y- Strainers Nos. 4 0 0 0 4
1.6 Electrical and Instrumentation
i Transformer Nos. 0
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
1.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. Balol GGS-3
ii Topic of discussion Nos. Discuss about Gas hazards and precation against
iii Special instructions Nos. Covid-19
iv No of person attended tool box meeting Nos.
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos.
d Welding Booths Nos.
e List of Safety Items Nos.
i Helmet Nos.
ii Gloves Nos.
iii Fire Extinguishers Nos.
f No. of Person Having PPE Nos.
i Deluge valve Nos. 0 Deluge valve Spool assemby pre- fabrication work in
progress.
ii Foam Nozzles Nos. 4 0 0 0 4
iii Spray Nozzles Nos. 84 0 0 0 84
iv Gate Valve Nos. 42 26 10 36 6
v Globe Valve Nos. 1 0 0 0 1
vi Check Valve (NRV) Nos. 13 0 0 0 13
vii Y- Strainers Nos. 4 0 0 0 4
1.6 Electrical and Instrumentation
i Transformer Nos. 0 Two pol and transformer PCC wor completed.
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
1.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. Jotana GGS
ii Topic of discussion
Discussed regarding covid safety.
iii Special instructions
iv No of person attended tool box meeting Nos.
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos.
d Welding Booths Nos.
e List of Safety Items
i Helmet Nos.
ii Gloves Nos.
iii Fire Extinguishers Nos.
f No. of Person Having PPE Nos.
6 Site name : BECHARAJI GGS-I
1.1 Reservoir
i Excavation Cum. 0
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
1.2 Pump House Building
i Excavation work M3 294 0 0 0 294
ii Pump House Foundation Nos. 8 0 0 0 8
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M2 0
viii Pump Set Foundation M3 0
ix HOT Crane No. 0
x Monorail No. 1 0 0 0 1
1.2 Pipe Sleeper : Civil Part
i Excavation Nos. 262 256 256 6
ii RCC Pedestal Nos. 262 262 0 262 0
iii Sand Filling/PCC(M:15) Nos. 262 256 256 6
iv Erection of RCC Pedestal Nos. 262 256 256 6
Backfiiling of RCC Pedestal after Erection Nos. 262 256 256 6
1.3 Piping: Mech. Part
i Erection of Network piping Mtr. 1790 1768.1 1768.1 21.9 Wrapping coating work in progree for
underground piping.
ii Erection of Spray piping Mtr. 0
iii Erection of Foam Piping Mtr. 0
1.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 23 3 0 3 20
v Hydrants Nos. 21 21 21 0
vi Hose cabinets Nos. 21 21 21 0
vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 42 0 0 0 42
viii Extinguishers Nos. 3 0 0 0 3
ix Foam Chamber Nos. 0 0 0 0 0
1.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 0 0 0 0 0
iii Spray Nozzles Nos. 344 0 0 0 344
iv Gate Valve Nos. 235 2 0 2 233
v Globe Valve Nos. 1 0 0 0 1
vi Check Valve (NRV) Nos. 17 0 0 0 17
vii Y- Strainers Nos. 4 0 0 0 4
1.6 Electrical and Instrumentation
i Transformer Nos. 0
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
1.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. Becharaji GGS-1
ii Topic of discussion
Discuss regarding site safety ,Covid 19 precation
iii Special instructions
iv No of person attended tool box meeting Nos. 17
b No of Hot work permits issued Nos. 1
c No of cold Work Permit Issued Nos. 1
d Welding Booths Nos. 2
e List of Safety Items
i Helmet Nos. 17
ii Gloves Nos. 15
iii Fire Extinguishers Nos. 2
f No. of Person Having PPE Nos. 17
7 Site name : BECHARAJI GGS-II
1.1 Reservoir
i Excavation Cum. 0
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
1.2 Pump House Building
i Excavation work M3 294 0 0 0 294
ii Pump House Foundation Nos. 8 0 0 0 8
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M2 0
viii Pump Set Foundation M3 0
ix HOT Crane No. 0
x Monorail No. 1 0 0 1
1.2 Pipe Sleeper : Civil Part
i Excavation Nos. 158 134 134 24
ii RCC Pedestal Nos. 158 158 158 0
iii Sand Filling/PCC(M:15) Nos. 158 134 134 24
iv Erection of RCC Pedestal Nos. 158 134 0 134 24
Backfiiling of RCC Pedestal after Erection Nos. 158 134 0 134 24
1.3 Piping: Mech. Part
i Erection of Network piping Mtr. 782 36.8 24.4 61.2 720.8 10 no's T support erection and welding work done.
ii Erection of Spray piping Mtr. 0
iii Erection of Foam Piping Mtr. 0
1.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 11 0 0 0 11
v Hydrants Nos. 12 0 0 0 12
vi Hose cabinets Nos. 12 0 0 0 12
vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 24 0 0 0 24
viii Extinguishers Nos. 3 0 0 0 3
ix Foam Chamber Nos. 0 0 0 0
1.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 0 0 0 0 0
iii Spray Nozzles Nos. 84 0 0 0 84
iv Gate Valve Nos. 135 0 0 0 135
v Globe Valve Nos. 1 0 0 0 1
vi Check Valve (NRV) Nos. 12 0 0 0 12
vii Y- Strainers Nos. 4 0 0 0 4
1.6 Electrical and Instrumentation
i Transformer Nos. 0
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
1.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. Becharaji GGS-II
ii Topic of discussion
Discuss regarding site safety ,Covid 19 precation
iii Special instructions
iv No of person attended tool box meeting Nos. 12
b No of Hot work permits issued Nos. 1
c No of cold Work Permit Issued Nos. 1
d Welding Booths Nos. 2
e List of Safety Items
i Helmet Nos. 12
ii Gloves Nos. 10
iii Fire Extinguishers Nos. 2
f No. of Person Having PPE Nos. 12
8 Site name : NORTH KADI GGS-I
2.1 Reservoir
i Excavation Cum. 0
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
2.2 Pump House Building
footing excavation work completed and dressing work
i Excavation work M3 294 294 0 294 0
in progress.
ii Pump House Foundation Nos. 8 0 0 0 8
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M4 0
viii Pump Set Foundation M5 0
ix HOT Crane No. 0
x Monorail No. 1 0 0 0 1
2.2 Pipe Sleeper : Civil Part
i Excavation Nos. 139 139 139 0
ii RCC Pedestal Nos. 139 139 139 0
iii Sand Filling/PCC(M:15) Nos. 139 139 139 0
iv Erection of RCC Pedestal Nos. 139 139 139 0
Backfiiling of RCC Pedestal after Erection Nos. 139 139 139 0
2.3 Piping: Mech. Part
i Erection of Network piping Mtr. 1270 1083.4 1083.4 186.6 underground road crossing work in progress.
ii Erection of Spray piping Mtr. 0
iii Erection of Foam Piping Mtr. 0
2.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 19 19 0 19 0
v Hydrants Nos. 15 15 0 15 0
vi Hose cabinets Nos. 15 0 0 0 15
vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 30 0 0 0 30
viii Extinguishers Nos. 3 0 0 0 3
ix Foam Chamber Nos. 0 0 0 0
2.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 4 0 0 0 4
iii Spray Nozzles Nos. 220 0 0 0 220
iv Gate Valve Nos. 48 28 28 20
v Globe Valve Nos. 1 0 0 0 1
vi Check Valve (NRV) Nos. 15 0 0 0 15
vii Y- Strainers Nos. 4 0 0 0 4
2.6 Electrical and Instrumentation
i Transformer Nos. 0
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
2.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. NK GGS-1
ii Topic of discussion
Discuss regarding site safety ,Covid 19 precation
iii Special instructions
iv No of person attended tool box meeting Nos.
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos.
d Welding Booths Nos.
e List of Safety Items
i Helmet Nos.
ii Gloves Nos.
iii Fire Extinguishers Nos.
f No. of Person Having PPE Nos.
9 Site name : NORTH KADI GGS-II
2.1 Reservoir
i Excavation Cum. 0
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
2.2 Pump House Building
i Excavation work M4 294 0 0 0 294
ii Pump House Foundation Nos. 8 0 0 0 8
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M4 0
viii Pump Set Foundation M5 0
ix HOT Crane No. 0
x Monorail No. 1 0 0 0 1
2.2 Pipe Sleeper : Civil Part
i Excavation Nos. 202 195 195 7
ii RCC Pedestal Nos. 202 202 202 0
iii Sand Filling/PCC(M:15) Nos. 202 195 195 7
iv Erection of RCC Pedestal Nos. 202 195 195 7
Backfiiling of RCC Pedestal after Erection Nos. 202 195 195 7
2.3 Piping: Mech. Part
i Erection of Network piping Mtr. 945 607.8 607.8 337.2
ii Erection of Spray piping Mtr. 0
iii Erection of Foam Piping Mtr. 0
2.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 14 14 14 0
Spool peace pre-fabrication work in progress.
v Hydrants Nos. 13 13 13 0
vi Hose cabinets Nos. 13 0 0 0 13
vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 26 0 0 0 26
viii Extinguishers Nos. 3 0 0 0 3
ix Foam Chamber Nos.
2.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 4 0 0 0 4
iii Spray Nozzles Nos. 160 0 0 0 160
iv Gate Valve Nos. 35 0 0 0 35
v Globe Valve Nos. 1 0 0 0 1
vi Check Valve (NRV) Nos. 5 0 0 0 5
vii Y- Strainers Nos. 4 0 0 0 4
2.6 Electrical and Instrumentation
i Transformer Nos. 0
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
2.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. North Kadi GGS-II
ii Topic of discussion
Precation for covid-19 and inportants of PPE.
iii Special instructions
iv No of person attended tool box meeting Nos.
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos.
d Welding Booths Nos.
e List of Safety Items
i Helmet Nos.
ii Gloves Nos.
iii Fire Extinguishers Nos.
f No. of Person Having PPE Nos.
10 Site name : NORTH KADI GGS-III
2.1 Reservoir
i Cleaning Grading work and excavation work Cum. 324 324 0 324 0
ii Steel work of Foundation & Pedestal No's 21 0 0 21
iii RCC work of Foundation & Pedestal Cum. 0
Steel work of Raft No's 0
RCC work of Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
1.2 Pump House Building
i Cleaning Grading work and excavation work M3 170 170 0 170 0
ii Pump House Foundation (Steel Work) Nos. 8 0 0 8
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M2 0
viii Pump Set Foundation M3 0
ix HOT Crane No. 0
x Monorail No. 1 0 0 0 1
i Excavation Cum. 0
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
2.2 Pipe Sleeper : Civil Part
i Excavation Nos. 255 250 250 5
ii RCC Pedestal Nos. 255 255 255 0
iii Sand Filling/PCC(M:15) Nos. 255 250 250 5
iv Erection of RCC Pedestal Nos. 255 250 250 5
v Backfiiling of RCC Pedestal after Erection Nos. 255 250 250 5
2.3 Piping: Mech. Part
i Erection of Network piping Mtr. 1060 999.2 0 999.2 60.8
ii Erection of Spray piping Mtr. 0
iii Erection of Foam Piping Mtr. 0
2.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 15 15 15 0
Pre fabrication spool erection work in progress.
v Hydrants Nos. 15 15 15 0
vi Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 30 0 0 0 30
vii Hoses cabinet Nos. 15 0 0 0 15
viii Extinguishers Nos. 3 0 0 0 3
ix Foam Chamber Nos.
2.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 4 0 0 0 4
iii Spray Nozzles Nos. 204 0 0 0 204
iv Gate Valve Nos. 40 23 2 25 15
v Globe Valve Nos. 1 0 0 0 1
vi Check Valve (NRV) Nos. 16 0 0 0 16
vii Y- Strainers Nos. 4 0 0 0 4
2.6 Electrical and Instrumentation
i Transformer Nos. 0 Foundation excavation work in progress.
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 0
viii Level guages Nos. 0
ix Level Transmitters Nos. 1 1
x Flow Meter Nos. 1 0 0 0 1
xi PLC based FWP Panel with HMI Nos. 0
2.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. NK GGS-3
ii Topic of discussion
Discuss regarding site safety ,Covid 19 precation
iii Special instructions
iv No of person attended tool box meeting Nos.
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos.
d Welding Booths Nos.
e List of Safety Items
i Helmet Nos.
ii Gloves Nos.
iii Fire Extinguishers Nos.
f No. of Person Having PPE Nos.
11 Site name : NORTH KADI GGS-IV
2.1 Reservoir
i Excavation Cum. 0
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
2.2 Pump House Building
i Excavation work M4 294 0 0 0 294
ii Pump House Foundation Nos. 8 0 0 0 8
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M4 0
viii Pump Set Foundation M5 0
ix HOT Crane No. 0
x Monorail No. 1 1 0 1 0
2.2 Pipe Sleeper : Civil Part
i Excavation Nos. 240 217 217 23
ii RCC Pedestal Nos. 240 240 240 0
iii Sand Filling/PCC(M:15) Nos. 240 200 200 40
iv Erection of RCC Pedestal Nos. 240 194 194 46
v Backfiiling of RCC Pedestal after Erection Nos. 240 194 194 46
2.3 Piping: Mech. Part
i Erection of Network piping Mtr. 1391 0 0 0 1391
ii Erection of Spray piping Mtr. 0
iii Erection of Foam Piping Mtr. 0
2.4 Fire Fighting Equipments: Mech. Part
i Engine driven FWP Nos. 1 0 0 0 1
ii Motor Driven FWP Nos. 1 0 0 0 1
iii Jockey Pump Nos. 2 0 0 0 2
iv Monitors Nos. 17 0 0 0 17
v Hydrants Nos. 20 0 0 0 20
vi Hose cabinets Nos. 40 0 0 0 40
vii Hose(63mm x 15 Mtr Length) Sythetic Ruber Nos. 20 0 0 0 20
viii Extinguishers Nos. 3 0 0 0 3
ix Foam Chamber Nos. 16 0 0 0 16
2.5 Valves: Mech. Part
i Deluge valve Nos. 0
ii Foam Nozzles Nos. 16 0 0 0 16
iii Spray Nozzles Nos. 238 0 0 0 238
iv Gate Valve Nos. 48 0 0 0 48
v Globe Valve Nos. 1 0 0 0 1
vi Check Valve (NRV) Nos. 16 0 0 0 16
vii Y- Strainers Nos. 4 0 0 0 4
2.6 Electrical and Instrumentation
i Transformer Nos. 0
ii UPS Nos. 0
iii Air Compressor Nos. 0
iv Soft Starter Nos. 0
v Fire water Panel at FWP Nos. 0
vi Pressure Guages Nos. 0
vii Pressure transmitters Nos. 3 3
viii Level guages Nos. 0
ix Level Transmitters Nos. 0
x Flow Meter Nos. 1 1 0 1 0
xi PLC based FWP Panel with HMI Nos. 0
2.7 Safety Status
a Tool Box Meeting Details:
i Location of work at Installation Nos. North Kadi GGS-IV
ii Topic of discussion
Discuss regarding site safety ,Covid 19 precation
iii Special instructions
iv No of person attended tool box meeting Nos.
b No of Hot work permits issued Nos.
c No of cold Work Permit Issued Nos.
d Welding Booths Nos.
e List of Safety Items
i Helmet Nos.
ii Gloves Nos.
iii Fire Extinguishers Nos.
f No. of Person Having PPE Nos. 0
12 Site name : LANWA GGS-I
1.1 F/W tank
F/W tank footing raft 21/21 no's completed and
curing work in progress
i Excavation Cum. 128.1 128.1 0 128.1 0 Footing raft column 21/21 completed and curing work
in progress.
final layer backfilling and compection work work in
progress.
ii Foundation No's 0
iii Raft Cum. 0
iv Wall's Cum. 0
v Landing Platform and Ladder No's 0
2.2 Pump House Building
i Excavation work M4 294 0 0 0 294
ii Pump House Foundation Nos. 8 0 0 0 8
a Soling & PCC work M3 0
b Footing work M3 0
iii Column M3 0
iv RCC Wall M3 0
v RCC Floor M3 0
vi Structure work MT 0
vii Roof M4 0
viii Pump Set Foundation M5 0
ix HOT Crane No. 0
x Monorail No. 1 1
2.2 Pipe Sleeper : Civil Part
i Excavation Nos. 169 166 0 166 3 Pipe pedestal alliment work in progress.
ii RCC Pedestal Nos. 169 169 169 0
iii Sand Filling/PCC(M:15) Nos. 169 166 0 166 3
iv Erection of RCC Pedestal Nos. 169 166 0 166 3
v Backfiiling of RCC Pedestal after Erection Nos. 169 166 0 166 3 compection work completed for all pipe pedestal.
2.3 Piping: Mech. Part