Temporary Cathodic Protecton Work Description SL. No Description Unit Quantity 1.0
The document describes the scope of work for a temporary cathodic protection system for a 16" diameter, 40 km long pipeline. It involves surveying soil conditions, designing and installing a galvanic anode system using magnesium or zinc anodes spaced 1 km apart. It also includes installing test stations, connecting anodes to the pipeline, monitoring devices like probes and coupons, and maintaining polarization levels until the permanent cathodic protection system is commissioned.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
146 views
Temporary Cathodic Protecton Work Description SL. No Description Unit Quantity 1.0
The document describes the scope of work for a temporary cathodic protection system for a 16" diameter, 40 km long pipeline. It involves surveying soil conditions, designing and installing a galvanic anode system using magnesium or zinc anodes spaced 1 km apart. It also includes installing test stations, connecting anodes to the pipeline, monitoring devices like probes and coupons, and maintaining polarization levels until the permanent cathodic protection system is commissioned.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3
TEMPORARY CATHODIC PROTECTON WORK DESCRIPTION
SL. No Description Unit Quantity
1.0 Survey. Design, detail engineering Manufacturing, Inspection/FAT (Factory acceptance test). Supply, Packing, transportation to site, storage, installation, testing &l commissioning of the temporary Cathodic protection system using Ma (Min 5.0 Kg Each)/ Zn galvanic anodes to protect the external surface of 16'dia x 40 km longi 3LPE Coated pipeline From Dispatch Terminal ai Cartogram at Ch. 0.00 to Ch. 40 Km against corrosion for a design life of minimum 2 year or till commissioning ofl PCA system as per standard specification enclosed with the tender for temporary cathodic protection system, approved desian document, data sheets & drawings. Scope shall also include but not limited to the following for completion of jobs: a) Measuremeni o soi resisivdty along the right of way of the main pipeline (At 500mtr Interval) & collection of soil & water samples alona ROW at depth of 1M. 2M & 3M a levery 5 kom interval (Min 03 sample at each location) for its chemical & microbial analysis along the pipeline route as pet specification for corrosion survey MECTSO521016C& NACE Standard TM0106-2006 for detection of SRB. ARB & Total dissolved H2S etc b) Collection of associational data relate to catholic protection along the right of way of pipeline as per standard specifications during the survey. c) Design. Detailed Engineering. Preparation of Design Document, Preparation of Test station schedule & Bil of Material as per the corrosion survey & Chemical analysis of Sol/water samples tor Temporary Cathodie Protection system. d) Supy, installation. Testing & comissioning of Test stations (TLP-Big Size & Normal Size) weather praof (P.55) as per specification & enclosed drawings. Selection ofi TLP tiz will be s per the hos of cables terminating at the station. TLP shall be sealeg at both ends by means ot foam seaing/solid sealing Temination piate inside ite TLP shoute have high insulation leve: (FRP or higher grade) to avoig drainage of CP current due to insulation leakage.
SL. No Description Unit Quantity
e) Supply, instalaton esting & commissioning of Mo (Low potential Min. 5.0 Ka)y Zn Galvanic anodes with backil as per te standard specification. MEC/TS/05/E9/016A The weight of the Mg Anode &the total nos. of anodes shall be calculated as per the corrosion survey, soil chemical analysis, total weight and current requirement of the pipeline section. However Min one anode is to be installed at every one KM with test station. Total number of Ma anodes requirement & its type (nbpon/solid) snal bel coagulant as pet soil resistivity, total anode weight requirement & total protection current required. f) Supply, installation minimum one no. Mo anode (5kg) shall be provided on each end of crossing for protection of Bare Casing pipe. In case of bare casing no additional ribbon anode shall be provided for protection. Bidder shall consider bare Casing pipe with increased thickness for the cased crossings as per API 1102 Riller materal atl any type snal be avoised bie annular space of the carier and casing pipe. (Refer CP at cased crossing in PJS cl no. g) g) Cable to pipe connection by themit welding/Pin brazing (or charged Pipeline) for 35, 25. 10. 6 sa.mm copper cable including excavation and exposing piling. Recoating with epoxy testing etc. h) Supply, layng of HDPE sheets (200mm wide, 6mm thick) between this pipeline and the other CP protected foreign pipelines at the crossing locations for providing electrical isolation. i) Earthling of above ground catholically unprotected pipeline at Receipt Station/Dispatch station/Metering skid/intermediate station etc. the earth electrode shall be 65 mm dia 4.5 mm thickness & 3000mm long. Total grounding resistance shall be limited to 1-2 Ohm max. j) Supply, installation testing & commissioning of one set of spark gap arrestor 100 KA. 10/350 uS (Solid State) across each insulating joint provided at tap- off SV & various consumer terminals as per scope of work specification. The un-protected/above ground pipeline shall be earthed through Gl earth electrodes with separate earth pit. The resistance of grounding stall be limited to 12 ohms max.
SL. No Description Unit Quantity
k) Supply insulation, testing commissioning one set of polarization cell (Solid state) with zinc anode at all high tension electrical power transmission line/equipment’s railway tractions (all 66 KV& above) crossing or running parallel to the pipeline for grounding purpose as per specification for existing & proposed HT lines. The rating of the cell shall depend upon anticipated fault current and ground bed resistance at the location of installation and the calculation of the same shall be furnished to MECON for review & selection of rating of the Polarization Cell. However, the rating of polarization cell shall not be less than 3.7 KA @ 30 Cycle & number of 20 kg net weight zinc anode shall not be less than two. It required Zn Ribbon anode (Dia min. 12X14 mm with back ti in trench)/ pre-packed AC mitigator wire of MATCOR make also be used for the grounding purpose to get lower grounding resistance (tar soil resistively higher than 25 Ohm-Cm). The resistance of grounding shall be limied to 1-2 ohms max. i) Supply, installation, testing & commissioning of external electrical resistance Probe (01 nos. probe with 01 reading instruments) utilizing the electrical resistance technique shall be provided along the pipeline at marshy/ vulnerable locations to monitor the external corrosion activity on the pipeline. Location of external ER probe shall be decided during detail engineering. Care shall be taken during installation of ER probes so that probe element is opposite to pipe. m) Supply, installation, testing & commissioning of Polarization coupons (Total 6 Nos.) one at every 5 km interval, area of 100mm x 100mm naving one side exoosed areal of 25 mm x 25 mm without permanent reference cell shall be provided along the pipeline at marshy areas and at vulnerable locations to monitor the external corrosion activity on the pipeline as per enclosed standard specification, Location of external Polarization coupons & Number of magnetic devices for operation of magnetic switch shall be decided during detail engineering in consultation with Owner/Owner's representative. Permanent Reference cell shall be manufactured & constructed in the withdrawing no. MEC/SD/05/E9/E/CP/1610 Rev-O. Care shall be taken during installation of polarization coupon so that bare face of polarization coupon is opposite to pipe polarization coupon shall not be installed between TLP & Pipeline. The works related to collection of approximately 2-5 m of pipeline material (in pieces of 300 to 1000 mm length) for fabrication of Polarization coupons is in the scope of the Bidder. n) Bonding in between pipelines running parallel or crossing as required including taking of permission from the owner of the foreign pipeline. 0) Coating Integrity test of HDD section of the pipeline shall be conducted immediately after the completion of the HDD of each HDD section by separate temporary power source and anode bed. Bidder shall submit the procedure as per the NACE requirements for approval along with the design document. p) Supplying, laying, termination, Glancing, ferruling & testing of all the cables of TCP system, Cu-Conductor, XLPE insulated, PVC sheathed, ArmaUnmmd (1Cx6 mm2 1Cx10 mm2. 1Cx25 mm2, 1Cx35mm2) as required. q) PSP Monitoring on monthly basis of the TCP system till commissioning of the permanent cathodic protection system including the coupon OFF PSP. r) All civil structural works related to TCP system including supply of bricks, cement & steel etc. required for completion of the system with other miscellaneous works specified in scope of work.