Network Solution Case Study
Network Solution Case Study
The Network solutions want to align their employees’ goals with the organizational.
o Another overlap was the standardization of the performance management system at all
the divisions.
The Network solutions want to align their employees’ goals with the organizational.
Another overlap was the standardization of the performance management system at all
the divisions
Another overlap was the standardization of the performance management system at all
the divisions
Another overlap was the standardization of the performance management system at all
the divisions
Another overlap was the standardization of the performance management system at all the
divisions.
Developmental programs for the employees to enhance their performance
Two-way communication was encouraged so that managers and employees can share
positive and negative about the performance.
The rating system which was the core part which evaluates each employee with the rating of
1, 2 or 3.
To rectify the policies and practices continuous checks were made at different intervals.
Ans2. The features of the system implemented at Network Solutions correspond to what is
described as ideal characteristics are as follows:
Ans2. The features of the system implemented at Network Solutions correspond to what is
ANSWER-2:
The features of the system implemented at Network Solutions correspond to what is described as
ideal characteristics are as follows:
2. Practicality:
Implementing performance system is time consuming and expensive but the design team made
the senior leadership agreed upon it as they would be evaluating all their
employees’ performance.
3. Standardization:
As design team already convinced the senior leadership to stop all the other
development programs which were 50 programs, basically the idea was the standardization of
evaluating performance across all divisions
5. Openness:
As stated in the case the Network Solutions encouraged two way communications on an ongoing
basis and all the employees knew the criteria of the evaluating system.
6. Thoroughness:
Network solutions planned to monitor all policies and practices and rectify if required and then
all the employees were evaluated.
7. Reliability:
Network Solutions planned on continuous check on performance of all employees- with all
stakeholders.
8. Specificity:
With the help of rating system the employees will have a sense of improving their performance
and what benefits they can be given at 1,2 and 3 rating scale
9. Inclusiveness:
The employees were given responsibility to develop the performance management system along
with managers.
10. Correctibility:
Looking in the light of case there was no such process stated through which employees can
challenge incorrect decisions.
12. Reliability:
Though the Network Solutions was checking the performance consistently but it is not sure that
the system is going to be error free which may result in incorrect decisions.
Answer-3
Based on the description of the implementation of new performance management system, here’s
some Advantage & positive outcome:
Increase in Motivation: