0% found this document useful (0 votes)
68 views1 page

1.7.1 GC Profile

The document describes the areas of an open railway track and tracks within stations. Area A is the space between lines or running tracks for signaling and railway equipment. Area B is the space for platforms, ramps, signaling systems, and construction elements and buildings used for railway works like scaffolding, equipment and materials. The document is a design plan for optimizing a section of railway between Doboj and Rasputnica Miljacka in Bosnia and Herzegovina funded by the European Union.

Uploaded by

Emir Jusić
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
68 views1 page

1.7.1 GC Profile

The document describes the areas of an open railway track and tracks within stations. Area A is the space between lines or running tracks for signaling and railway equipment. Area B is the space for platforms, ramps, signaling systems, and construction elements and buildings used for railway works like scaffolding, equipment and materials. The document is a design plan for optimizing a section of railway between Doboj and Rasputnica Miljacka in Bosnia and Herzegovina funded by the European Union.

Uploaded by

Emir Jusić
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Otvorena pruga i glavni prolazni kolosijeci Kolosijeci u stanicama

Open track and running tracks Tracks in stations

PROJEKTOVAO NAPOMENE REVIZIJE


VER. DATUM REVIDENT PROVJERIO ODOBRIO OPIS
PROVJERIO

ODOBRIO

VER. R 1:5000 DATUM: Jan.2021.

KORISNICI: KOD PROJEKTA: EuropeAid/139719/DH/SER/BA BROJ CRTEŽA: 1.7.1

A BOSANSKO-HERCEGOVAČKA ŽELJEZNIČKA
JAVNA KORPORACIJA
NAZIV PROJEKTA
Projekti i studije za dionicu željezničke pruge
NAZIV CRTEŽA
Slobodni profil GC
ŽELJEZNICE FEDERACIJE BOSNE I HERCEGOVINE Doboj - Rasputnica Miljacka,
Federacija BiH i Republika Srpska,
ŽELJEZNICE REPUBLIKE SRPSKE
Bosna i Hercegovina
FAZA PROJEKTA: STUDIJA OPTIMIZACIJE

KNJIGA 1:

B B
KONSULTANT/PROJEKTANT

Servicios de Ingenieria, S.L. IPSA Institut, d.o.o. Servicios de Ingenieria, S.A.


Madrid Sarajevo Madrid OVAJ PROJEKAT JE FINANSIRAN OD STRANE EVROPSKE UNIJE

A Prostor za signalnu i pružnu opremu između pruga ili glavnih prolaznih kolosijeka

B Prostor za perone, rampe, signalne sisteme, građevinske elemente i objekte DESIGNED BY NOTES REVISIONS
ISSUE DATE MADE BY CHECKED APPROVED DESCRIPTION
CHECKED BY
koji se koriste za pružne radove: građevinske skele, oprema i materijali
APPROVED BY

ISSUE R 1:5000 DATE: Jan. 2021.


A Area for signaling and railway equipment between lines or running tracks BENEFICIARIES: PROJECT CODE: EuropeAid/139719/DH/SER/BA DRAWING NUMBER: 1.7.1
BOSNIA AND HERZEGOVINA RAILWAYS PROJECT TITLE DRAWING TITLE
B Area for platforms, ramps, signalling systems, construction elements and PUBLIC CORPORATION
P.E. RAILWAYS OF THE FEDERATION OF
Design and studies for railway section
Doboj - Rasputnica Miljacka,
Federation of BH and Republic of Srpska,
GC structure gauge
BOSNIA AND HERZEGOVINA
Bosnia and Herzegovina
buildings which are used for railway works: scaffolding, equipment and materials P.E. RAILWAYS OF REPUBLIKA SRPSKA
DESIGN PHASE: OPTIMISATION STUDY

BOOK 1:

CONSULTANT/DESIGNER

Servicios de Ingenieria, S.L. IPSA Institut, d.o.o. Servicios de Ingenieria, S.A.


Madrid Sarajevo Madrid THIS PROJECT IS FUNDED BY THE EUROPEAN UNION

You might also like