A network consists of the activities in the following list. Times are given in weeks.
m
er as
Answer:
co
eH w
(a)
o.
rs e
ou urc
o
aC s
vi y re
ed d
ar stu
(b,c)
Results
Early Late
is
A 0 8 0 8 0
B 0 3 7 10 7
C 8 15 8 15 0
D 8 11 10 13 2
sh
E 15 19 15 19 0
F 11 17 13 19 2
Project 19
This study source was downloaded by 100000826484607 from CourseHero.com on 05-21-2021 22:19:29 GMT -05:00
https://www.coursehero.com/file/58649460/Operations-Managementpdf/
Problem # 2:
The network below represents a project being analyzed by Critical Path Methods. Activity
durations are A=5, B=2, C=12, D=3, E=5, F=1, G=7, H=2, I=10, and J=6.
m
er as
co
eH w
o.
rs e
ou urc
a. What task must be on the critical path, regardless of activity durations?
b. What is the duration of path A-B-E-H-J?
c. What is the critical path of this network?
d. What is the length of the critical path?
o
g. If activity C were delayed by two time units, what would happen to the project duration?
Answer:
ed d
(a) J; (b) 20; (c) A-B-G-I-J; (d) 30; (e) 5; (f) 24; (g) no impact.
ar stu
Results
Early Late
Task Early Start Finish Late Start Finish Slack
is
A 0 5 0 5 0
Th
B 5 7 5 7 0
C 5 17 10 22 5
D 0 3 10 13 10
E 7 12 17 22 10
sh
F 3 4 13 14 10
G 7 14 7 14 0
H 17 19 22 24 5
I 14 24 14 24 0
J 24 30 24 30 0
Project 30
This study source was downloaded by 100000826484607 from CourseHero.com on 05-21-2021 22:19:29 GMT -05:00
https://www.coursehero.com/file/58649460/Operations-Managementpdf/
Problem # 3:
m
K E, J 2
er as
co
a. Draw the network diagram.
eH w
b. Which activities form the critical path?
o.
c. How much slack exists at activities A and F?
d.
rs e
What is the duration of the critical path?
ou urc
Answer:
o
This study source was downloaded by 100000826484607 from CourseHero.com on 05-21-2021 22:19:29 GMT -05:00
https://www.coursehero.com/file/58649460/Operations-Managementpdf/
Problem # 4:
A partially solved PERT problem is detailed in the table below. Times are given in weeks.
m
J G, I 4 6 14 2.778
er as
K E, J 2 2 5 0.250
co
eH w
a. Calculate the expected time for each activity. Enter these values in the appropriate
o.
column in the table above.
b.
rs e
Which activities form the critical path?
ou urc
c. What is the estimated time of the critical path?
d. What are the project variance and the project standard deviation?
e. What is the probability of completion of the project after week 40?
o
aC s
vi y re
Answer:
(a) A=9.5 B=3 C=12 D=5.5 E=6 F=8 G=3 H=3 I=9 J=7 K=2.5
(b) A-D-H-I-J-K; (c) 36.5; (d) 9.53, 3.09; (e) 0.13.
ed d
ar stu
is
Th
sh
This study source was downloaded by 100000826484607 from CourseHero.com on 05-21-2021 22:19:29 GMT -05:00
https://www.coursehero.com/file/58649460/Operations-Managementpdf/
Problem # 5:
Immediate
Activity Predecessor(s) Pessimistic Probable Optimistic
J -- 15 10 8
K -- 9 8 7
L J 10 6 5
M J 3 3 3
N K,M 9 5 1
O K,M 10 7 4
P L,N 10 8 3
m
b. Calculate the expected duration and variance of the critical path.
er as
c. Calculate the probability that the project will be completed in fewer than 30 time units.
co
eH w
o.
rs e
ou urc
o
aC s
vi y re
ed d
ar stu
is
Th
sh
This study source was downloaded by 100000826484607 from CourseHero.com on 05-21-2021 22:19:29 GMT -05:00
https://www.coursehero.com/file/58649460/Operations-Managementpdf/
Answer:
m
er as
co
eH w
o.
rs e
ou urc
Early Early Late Late
Task Start Finish Start Finish Slack Mean Variance
J 0 10.5 0 10.5 0 10.5 1.361111
o
This study source was downloaded by 100000826484607 from CourseHero.com on 05-21-2021 22:19:29 GMT -05:00
https://www.coursehero.com/file/58649460/Operations-Managementpdf/
Problem # 6:
The network below represents a project being analyzed by Critical Path Methods. Activity
durations are indicated on the network.
m
er as
co
eH w
o.
rs e
ou urc
a. Identify the activities on the critical path and what is the duration of the critical path?
o
Answer:
(a) Critical activities are A-C-J-K and the critical path is 26 time units.
(b) Slack at H is 9 units.
ed d
(c) I has 11 units slack--a ten unit delay would have no impact on the project.
ar stu
Early Late
Task Early Start Finish Late Start Finish Slack
A 0 5 0 5 0
is
B 0 3 6 9 6
Th
C 5 16 5 16 0
D 0 4 9 13 9
E 3 10 9 16 6
F 4 10 15 21 11
sh
G 3 7 17 21 14
H 4 7 13 16 9
I 10 15 21 26 11
J 16 22 16 22 0
K 22 26 22 26 0
Project 26
This study source was downloaded by 100000826484607 from CourseHero.com on 05-21-2021 22:19:29 GMT -05:00
https://www.coursehero.com/file/58649460/Operations-Managementpdf/
Powered by TCPDF (www.tcpdf.org)