0% found this document useful (0 votes)
39 views

PDH DXC Fat Pro & Rep

This document outlines test procedures for factory acceptance testing of an e-terragridcom DXC system. It includes sections on test definitions, required equipment, preliminary configuration and control checks, and specific tests for alarm testing, Ethernet circuits, 2-wire and 4-wire telephone circuits, and digital circuits up to 2 Mbps. The goal is to verify that required features are implemented and functions as expected through sampling testing at the customer site before acceptance.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views

PDH DXC Fat Pro & Rep

This document outlines test procedures for factory acceptance testing of an e-terragridcom DXC system. It includes sections on test definitions, required equipment, preliminary configuration and control checks, and specific tests for alarm testing, Ethernet circuits, 2-wire and 4-wire telephone circuits, and digital circuits up to 2 Mbps. The goal is to verify that required features are implemented and functions as expected through sampling testing at the customer site before acceptance.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

PDH E-TERRAGRIDCOM DXC FAT PROCEDURE & REPORT SHEET 1

CONTENTS

1. INTRODUCTION .............................................................................................................................................. 3
1.1 GENERAL .......................................................................................................................................................... 3
1.2 REFERENCE DOCUMENT .................................................................................................................................... 3
1.3 SAMPLING ......................................................................................................................................................... 3
2. TEST PROCEDURE AND RESULT SHEET ................................................................................................. 3
2.1 TESTS DEFINITIONS .......................................................................................................................................... 4
2.2 TEST EQUIPMENTS ............................................................................................................................................ 4
3. PRELIMINARY CONFIGURATION FILE ................................................................................................... 4
4. PRELIMINARY CONTROL ............................................................................................................................ 4
4.1 VISUAL INSPECTION ................................................................................................................................... 5
4.1.1 Test equipment: ...................................................................................................................................... 5
4.1.2 Panel visual inspection:.......................................................................................................................... 5
5. DXC TEST .......................................................................................................................................................... 6
5.1 ALARM TESTING ............................................................................................................................................... 6
5.1.1 Test procedure: ....................................................................................................................................... 6
5.1.2 Test equipment: ...................................................................................................................................... 6
5.1.3 Test setup:............................................................................................................................................... 6
5.1.4 Test result: .............................................................................................................................................. 6
5.2 ETHERNET CIRCUIT ........................................................................................................................................... 7
5.2.1 Test procedure: ....................................................................................................................................... 7
5.2.2 Test equipment: ...................................................................................................................................... 7
5.2.3 Test setup:............................................................................................................................................... 7
5.2.4 Test result: .............................................................................................................................................. 7
5.3 2 WIRES AF CIRCUIT (FXO-FXS) ..................................................................................................................... 8
5.3.1 Test procedure: ....................................................................................................................................... 8
5.3.2 Test equipment: ...................................................................................................................................... 8
5.3.3 Test setup:............................................................................................................................................... 8
5.3.4 Test result: .............................................................................................................................................. 8
5.4 4 WIRES E & M CIRCUIT .................................................................................................................................... 9
5.4.1 Test procedure: ....................................................................................................................................... 9
5.4.2 Test equipment: ...................................................................................................................................... 9
5.4.3 Test setup:............................................................................................................................................. 10
5.4.4 Test result: ............................................................................................................................................ 10
5.5 64 KBPS CIRCUIT THROUGH 2 MBPS ................................................................................................................ 11
5.5.1 Test procedure: ..................................................................................................................................... 11
5.5.2 Test equipment: .................................................................................................................................... 11
5.5.3 Test setup:............................................................................................................................................. 11
5.5.4 Test result: ............................................................................................................................................ 11
6. FACTORY ACCEPTANCE TEST REPORT ............................................................................................... 12

PDH E-TERRAGRIDCOM DXC FAT PROCEDURE & REPORT SHEET 2


1. INTRODUCTION

1.1 General

The present document defines the test procedures to apply during the final factory
inspection by the customer or its representative.

The aim of the following tests is to check that the required features are implemented on the
network; this is mainly demonstrated through functional testing.

These acceptance tests mainly consist to verify previous tests carried out by our technicians
during equipment and system control and tuning.

1.2 Reference document

- e-terragridcom DXC Technical Manual


- e-terragridcom DXC Design File

1.3 Sampling
Once the configuration has been checked during integration steps, the customer is invited
for the Factory Acceptance Test, during which the enclosed tests are performed and
repeated on a sampling basis.
The proposed sampling is 10% for each category of tests or circuits with a minimum of one.

2. TEST PROCEDURE AND RESULT SHEET

The test document to be used in factory is organized on several sheets. Each sheet
corresponds to all information related to one test and includes:

 required test equipment


 test set -up
 test results

The final filled document can include several test sheets of the same type in order to comply
with the sampling rate.

Note: In the following test sheets:

 PDH indicates the e-terragridcom DXC equipment.

PDH E-TERRAGRIDCOM DXC FAT PROCEDURE & REPORT SHEET 3


2.1 Tests Definitions

1. The tests are performed as close as possible to the user terminal access
(i.e. Cubicle SDF)

2. The technical details about Functionality, Input/Output design, or extended


product information are recorded in the relevant Product Technical Manuals.
These details are therefore not reproduced in the present document.

3. The validity of tests is linked to the acceptance criteria respect as tolerance.

4. All tests are carried out at nominal power supply level (-48VDC), unless
specified specifically in the procedure.

5. Results are recorded in the associated System test report.

2.2 Test Equipments

The main tests instruments are listed hereafter:


 BER Test
 Physical Loop
 Telephone test
 Selective Level Meter
 AF Generator
 Multimeter
 Laptop
 Ethernet Tester EXFO, ETS-1000
 Ethernet Loop Back EXFO, ETS-1000L

3. Preliminary Configuration File

The configuration parameters of the equipment under test are recorded and checked.

The relevant parameters include e-terragridcom DXC:


 Serial numbers,
 Board Layout & Configuration,
 Console or Slip setting,
 Telnet with IP configuration setting.

4. Preliminary Control

The operator checks the conformity of cubicle layout and the accessories based on the
concerned integration drawing, the equipment version, reads the serial numbers, and
performs visual control of the equipment.

PDH E-TERRAGRIDCOM DXC FAT PROCEDURE & REPORT SHEET 4


4.1 VISUAL INSPECTION

4.1.1 Test equipment:

Equipment Availability
2 Mb/s and low speed digital BER tester
Signal level generator
Signal level meter
Multimeter
Telephone test
Ethernet tester

4.1.2 Panel visual inspection:

Panel
Substation name Substation name
………………… ……………….
Passed Failed Passed Failed
Equipment configuration
Marking & labeling
Power supply wiring
Earth wiring
Internal wiring
Documentation
Rack serial number
Remarks:

PDH E-TERRAGRIDCOM DXC FAT PROCEDURE & REPORT SHEET 5


5. DXC TEST

5.1 Alarm testing

5.1.1 Test procedure:


 Most of the alarms will be generated during the progress of the Factory
Acceptance Test. Appearance of corresponding alarms will be checked on
rack by mean of LED & Craft terminal.

5.1.2 Test equipment:


 Multimeter.

5.1.3 Test setup:

PDH B SDH PDH A


Multimeter
Eqpt Network Eqpt

5.1.4 Test result:

Substation name Major alarm


From PDH To PDH Passed Failed
………………… ……………………
…………………. …………………….

PDH E-TERRAGRIDCOM DXC FAT PROCEDURE & REPORT SHEET 6


5.2 Ethernet circuit

5.2.1 Test procedure:


 On one side, preset an ethernet tester (ETS-1000) to generate ethernet
traffic (transmission rate = 64 kbps, ethernet packet size).
 On other side, preset a loopback ethernet (ETS-1000L).
 Start the measurement for 3 minutes and check there is no error.

5.2.2 Test equipment:


 Generate ethernet tester (ETS-1000).
 Loopback ethernet tester (ETS-1000L).

5.2.3 Test setup:

PDH A SDH PDH B


Eqpt Network Eqpt

5.2.4 Test result:

Substation name
Passed Failed
From PDH To PDH
………………… ……………………
…………………. …………………….

PDH E-TERRAGRIDCOM DXC FAT PROCEDURE & REPORT SHEET 7


5.3 2 wires AF circuit (FXO-FXS)

5.3.1 Test procedure:


 Set E1 port with framing CAS ON/CRC ON (PDH A & PDH B)
 Route a voice TS from FXO port to E1 port on PDH A
 Route a voice TS from FXS port to E1 port on PDH B
 Connect the generator to the FXO box, then use a wires RJ11 cable
(middle pin 2 & 3) to plug the FXO card on PDH A
 Send 1020 Hz / 0 dBm signal on the FXO card using signal generator.
 Measure the outgoing signal from the FXS card it should be around -7
dBm (+/- 1 dBm).

5.3.2 Test equipment:


 FXO Box
 Signal generator
 Selective level meter

5.3.3 Test setup:

Level PDH A SDH PDH B Selective


generator FXO RJ11 Equipt Network Equipt meter
BOX FXO FXS
board board

5.3.4 Test result:

Substation name
Received level
From PDH To PDH
………………… …………………… ……………dBm
…………………. ……………………. ……………dBm

PDH E-TERRAGRIDCOM DXC FAT PROCEDURE & REPORT SHEET 8


5.4 4 wires E & M circuit

5.4.1 Test procedure:

5.4.1.1 Signal TX & RX:


 From PDH A send a voice signal by using signal generator (800
Hz/-3.5 dBm) to the TX part.
 At PDH B check reception level by using selective level meter,
received level at 800 Hz should be -3.5 dBm (+/- 2 dB).

5.4.1.2 Signal E & M:


 Create a physical loop at the remote equipment between E & M.
 Check that the voltage between the M pin and the –48VDC
terminal block.
 If the test success, multimeter will displayed +48 VDC.
 The test is performed on both sides.

5.4.2 Test equipment:


Signal generator
Selective level meter
Multimeter

PDH E-TERRAGRIDCOM DXC FAT PROCEDURE & REPORT SHEET 9


5.4.3 Test setup:

5.4.3.1 Signal TX & RX:

PDH A PDH B
TX Eqpt SDH Eqpt RX
Signal Selective
generator 4wire Network 4wire level meter
E&M E&M
board board

5.4.3.2 Signal E & M

Multimeter PDH A
PDH B
48VDC
4W E&M port 4W E&M port
Black Red

Black Red M
SDH M
E Network
E
Switch

-48 VDC Ground (+48 VDC)

5.4.4 Test result:

Substation name E & M test


Received level
From PDH To PDH Passed Failed
………………… …………………… ……………dBm
…………………. ……………………. ……………dBm

PDH E-TERRAGRIDCOM DXC FAT PROCEDURE & REPORT SHEET 10


5.5 64 kbps circuit through 2 Mbps

5.5.1 Test procedure:


 Connect two PDH equipments through the 4 wires 64K G.703 link at Local
side and create a loop 64K at remote side.
 Set the BER Tester to send an error-free signal and to monitor the
reception.
 Perform a BER test on one port 64k G.703 (3 min).
 Check that the BER tester records no error (BER = 10-9).

5.5.2 Test equipment:


 BER tester

5.5.3 Test setup:

PDH PDH
BER
Eqpt Eqpt
Tester
64K SDH 64K
G.703 Network G.703
board board

5.5.4 Test result:

Substation name
Passed Failed
From PDH To PDH
………………… ……………………
…………………. …………………….

PDH E-TERRAGRIDCOM DXC FAT PROCEDURE & REPORT SHEET 11


6. FACTORY ACCEPTANCE TEST REPORT

Customer :

Country :

Project :

Contract number :

FAT CONCLUSION

Passed Failed
Performed tests :
[ ] [ ]

COMMENTS

Date: …………...

For the customer : Mr / Mrs ……………. Signature: ……………..

Mr / Mrs …………… Signature: ……………..

Mr / Mrs …………… Signature: ……………..

: Mr / Mrs ……………. Signature: ……………..


For ALSTOM GRID

Mr / Mrs ……………. Signature: ……………..

PDH E-TERRAGRIDCOM DXC FAT PROCEDURE & REPORT SHEET 12