PDH DXC Fat Pro & Rep
PDH DXC Fat Pro & Rep
CONTENTS
1. INTRODUCTION .............................................................................................................................................. 3
1.1 GENERAL .......................................................................................................................................................... 3
1.2 REFERENCE DOCUMENT .................................................................................................................................... 3
1.3 SAMPLING ......................................................................................................................................................... 3
2. TEST PROCEDURE AND RESULT SHEET ................................................................................................. 3
2.1 TESTS DEFINITIONS .......................................................................................................................................... 4
2.2 TEST EQUIPMENTS ............................................................................................................................................ 4
3. PRELIMINARY CONFIGURATION FILE ................................................................................................... 4
4. PRELIMINARY CONTROL ............................................................................................................................ 4
4.1 VISUAL INSPECTION ................................................................................................................................... 5
4.1.1 Test equipment: ...................................................................................................................................... 5
4.1.2 Panel visual inspection:.......................................................................................................................... 5
5. DXC TEST .......................................................................................................................................................... 6
5.1 ALARM TESTING ............................................................................................................................................... 6
5.1.1 Test procedure: ....................................................................................................................................... 6
5.1.2 Test equipment: ...................................................................................................................................... 6
5.1.3 Test setup:............................................................................................................................................... 6
5.1.4 Test result: .............................................................................................................................................. 6
5.2 ETHERNET CIRCUIT ........................................................................................................................................... 7
5.2.1 Test procedure: ....................................................................................................................................... 7
5.2.2 Test equipment: ...................................................................................................................................... 7
5.2.3 Test setup:............................................................................................................................................... 7
5.2.4 Test result: .............................................................................................................................................. 7
5.3 2 WIRES AF CIRCUIT (FXO-FXS) ..................................................................................................................... 8
5.3.1 Test procedure: ....................................................................................................................................... 8
5.3.2 Test equipment: ...................................................................................................................................... 8
5.3.3 Test setup:............................................................................................................................................... 8
5.3.4 Test result: .............................................................................................................................................. 8
5.4 4 WIRES E & M CIRCUIT .................................................................................................................................... 9
5.4.1 Test procedure: ....................................................................................................................................... 9
5.4.2 Test equipment: ...................................................................................................................................... 9
5.4.3 Test setup:............................................................................................................................................. 10
5.4.4 Test result: ............................................................................................................................................ 10
5.5 64 KBPS CIRCUIT THROUGH 2 MBPS ................................................................................................................ 11
5.5.1 Test procedure: ..................................................................................................................................... 11
5.5.2 Test equipment: .................................................................................................................................... 11
5.5.3 Test setup:............................................................................................................................................. 11
5.5.4 Test result: ............................................................................................................................................ 11
6. FACTORY ACCEPTANCE TEST REPORT ............................................................................................... 12
1.1 General
The present document defines the test procedures to apply during the final factory
inspection by the customer or its representative.
The aim of the following tests is to check that the required features are implemented on the
network; this is mainly demonstrated through functional testing.
These acceptance tests mainly consist to verify previous tests carried out by our technicians
during equipment and system control and tuning.
1.3 Sampling
Once the configuration has been checked during integration steps, the customer is invited
for the Factory Acceptance Test, during which the enclosed tests are performed and
repeated on a sampling basis.
The proposed sampling is 10% for each category of tests or circuits with a minimum of one.
The test document to be used in factory is organized on several sheets. Each sheet
corresponds to all information related to one test and includes:
The final filled document can include several test sheets of the same type in order to comply
with the sampling rate.
1. The tests are performed as close as possible to the user terminal access
(i.e. Cubicle SDF)
4. All tests are carried out at nominal power supply level (-48VDC), unless
specified specifically in the procedure.
The configuration parameters of the equipment under test are recorded and checked.
4. Preliminary Control
The operator checks the conformity of cubicle layout and the accessories based on the
concerned integration drawing, the equipment version, reads the serial numbers, and
performs visual control of the equipment.
Equipment Availability
2 Mb/s and low speed digital BER tester
Signal level generator
Signal level meter
Multimeter
Telephone test
Ethernet tester
Panel
Substation name Substation name
………………… ……………….
Passed Failed Passed Failed
Equipment configuration
Marking & labeling
Power supply wiring
Earth wiring
Internal wiring
Documentation
Rack serial number
Remarks:
Substation name
Passed Failed
From PDH To PDH
………………… ……………………
…………………. …………………….
Substation name
Received level
From PDH To PDH
………………… …………………… ……………dBm
…………………. ……………………. ……………dBm
PDH A PDH B
TX Eqpt SDH Eqpt RX
Signal Selective
generator 4wire Network 4wire level meter
E&M E&M
board board
Multimeter PDH A
PDH B
48VDC
4W E&M port 4W E&M port
Black Red
Black Red M
SDH M
E Network
E
Switch
PDH PDH
BER
Eqpt Eqpt
Tester
64K SDH 64K
G.703 Network G.703
board board
Substation name
Passed Failed
From PDH To PDH
………………… ……………………
…………………. …………………….
Customer :
Country :
Project :
Contract number :
FAT CONCLUSION
Passed Failed
Performed tests :
[ ] [ ]
COMMENTS
Date: …………...