0% found this document useful (0 votes)
13 views

Proposal Required For Sargodha Project

The client needs a proposal for a project in Sargodha where meters installed in a plaza can disconnect when allowed usage units are reached, allowing for advance payment in shops; the requirements include supporting various utilities through any communication method and an Android app, with 300 single-phase meters, 50 three-phase meters, and 10 CTs.

Uploaded by

Engineer Waseem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views

Proposal Required For Sargodha Project

The client needs a proposal for a project in Sargodha where meters installed in a plaza can disconnect when allowed usage units are reached, allowing for advance payment in shops; the requirements include supporting various utilities through any communication method and an Android app, with 300 single-phase meters, 50 three-phase meters, and 10 CTs.

Uploaded by

Engineer Waseem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Proposal Required for Sargodha Project

Client needs a system where he can disconnect the meter when allowed
units reached. The reason is that he want to deploy advance payment in
shops. meters will be installed in a Plaza.
Requiremetns
Any communication method
Water,gas and electricity utilities may be integarted
android application
Single Phase Meter=300, Three Phase Meter=50 and CT=10