Case Study Business Communication
Case Study Business Communication
No one knows exactly how much poor communication costs business, industry and government each year, but estimates
suggest billions. In fact, a recent estimate claims that the cost in the U.S. alone are close to $4 billion annually![1] Poorly-
worded or inefficient emails, careless reading or listening to instructions, documents that go unread due to poor design,
hastily presenting inaccurate information, sloppy proofreading — all of these examples result in inevitable costs. The
problem is that these costs aren’t usually included on the corporate balance sheet at the end of each year, so often the
problem remains unsolved.
You may have seen the Project Management Tree Cartoon before (Figure 1.4.1); it has been used and adapted widely to
illustrate the perils of poor communication during a project (you can make your own version at ProjectCartoon.com!).
Bruce had since left the company, because he felt that the importance of his research was not being appreciated.
CASE 2: The unaccepted current regulator proposal
The Acme Electric Company worked day and night to develop a new current regulator designed to cut the electric power
consumption in aluminium plants by 35%. They knew that, although the competition was fierce, their regulator could be
produced more cheaply, was more reliable, and worked more efficiently than the competitors’ products.
The owner, eager to capture the market, personally but somewhat hastily put together a 120-page proposal to the three major
aluminium manufacturers, recommending that their regulators be installed at all company plants.
She devoted the first 87 pages of the proposal to the mathematical theory and engineering design behind his new regulator,
and the next 32 to descriptions of the new assembly line she planned to set up to produce regulators quickly. Buried in an
appendix were the test results that compared her regulator’s performance with present models, and a poorly drawn graph
showed how much the dollar savings would be.
Acme Electric didn’t get the contracts, despite having the best product. Six months later, the company filed for bankruptcy.
CASE 3: The instruction manual the scared customers away
As one of the first to enter the field of office automation, Sagatec Software, Inc. had built a reputation for designing high-
quality and user-friendly database and accounting programs for business and industry. When they decided to enter the word-
processing market, their engineers designed an effective, versatile, and powerful program that Sagatec felt sure would
outperform any competitor.
To be sure that their new word-processing program was accurately documented, Sagatec asked the senior program designer
to supervise writing the instruction manual. The result was a thorough, accurate and precise description of every detail of
the program’s operation.
When Sagatec began marketing its new word processor, cries for help flooded in from office workers who were so confused
by the massive manual that they couldn’t even find out how to get started. Then several business journals reviewed the
program and judged it “too complicated” and “difficult to learn.” After an impressive start, sales of the new word processing
program plummeted.
Sagatec eventually put out a new, clearly written training guide that led new users step by step through introductory
exercises and told them how to find commands quickly. But the rewrite cost Sagatec $350,000, a year’s lead in the market,
and its reputation for producing easy-to-use business software.
CASE 4: One garbled memo – 26 baffled phone calls
Joanne supervised 36 professionals in 6 city libraries. To cut the costs of unnecessary overtime, she issued this one-sentence
memo to her staff:
When workloads increase to a level requiring hours in excess of an employee’s regular duty assignment, and when such
work is estimated to require a full shift of eight (8) hours or more on two (2) or more consecutive days, even though
unscheduled days intervene, an employee’s tour of duty shall be altered so as to include the hours when such work must be
done, unless an adverse impact would result from such employee’s absence from his previously scheduled assignment.
After the 36 copies were sent out, Joanne’s office received 26 phone calls asking what the memo meant. What the 10 people
who didn’t call about the memo thought is uncertain. It took a week to clarify the new policy.
CASE 5: Big science — little rhetoric
The following excerpt is from Carl Sagan’s book, The Demon-Haunted World: Science as a Candle in the Dark,[8] itself
both a plea for and an excellent example of clear scientific communication:
The Superconducting Supercollider (SSC) would have been the preeminent instrument on the planet for probing the fine
structure of matter and the nature of the early Universe. Its price tag was $10 to $15 billion. It was cancelled by Congress in
1993 after about $2 billion had been spent — a worst of both worlds outcome. But this debate was not, I think, mainly about
declining interest in the support of science. Few in Congress understood what modern high-energy accelerators are for.
They are not for weapons. They have no practical applications. They are for something that is, worrisomely from the point
of view of many, called “the theory of everything.” Explanations that involve entities called quarks, charm, flavour, colour,
etc., sound as if physicists are being cute. The whole thing has an aura, in the view of at least some Congress people I’ve
talked to, of “nerds gone wild” — which I suppose is an uncharitable way of describing curiosity-based science. No one
asked to pay for this had the foggiest idea of what a Higgs boson is. I’ve read some of the material intended to justify the
SSC. At the very end, some of it wasn’t too bad, but there was nothing that really addressed what the project was about on a
level accessible to bright but skeptical non-physicists. If physicists are asking for 10 or 15 billion dollars to build a machine
that has no practical value, at the very least they should make an extremely serious effort, with dazzling graphics,
metaphors, and capable use of the English language, to justify their proposal. More than financial mismanagement,
budgetary constraints, and political incompetence, I think this is the key to the failure of the SSC.
CASE 6: The co-op student who mixed up genres
Chris was simultaneously enrolled in a university writing course and working as a co-op student at the Widget
Manufacturing plant. As part of his co-op work experience, Chris shadowed his supervisor/mentor on a safety inspection of
the plant, and was asked to write up the results of the inspection in a compliance memo. In the same week, Chris’s writing
instructor assigned the class to write a narrative essay based on some personal experience. Chris, trying to be efficient,
thought that the plant visit experience could provide the basis for his essay assignment as well.
He wrote the essay first, because he was used to writing essays and was pretty good at it. He had never even seen a
compliance memo, much less written one, so was not as confident about that task. He began the essay like this:
On June 1, 2018, I conducted a safety audit of the Widget Manufacturing plant in New City. The purpose of the audit was to
ensure that all processes and activities in the plant adhere to safety and handling rules and policies outlined in the
Workplace Safety Handbook and relevant government regulations. I was escorted on a 3-hour tour of the facility by…
Chris finished the essay and submitted it to his writing instructor. He then revised the essay slightly, keeping the
introduction the same, and submitted it to his co-op supervisor. He “aced” the essay, getting an A grade, but his supervisor
told him that the report was unacceptable and would have to be rewritten – especially the beginning, which should have
clearly indicated whether or not the plant was in compliance with safety regulations. Chris was aghast! He had never heard
of putting the “conclusion” at the beginning. He missed the company softball game that Saturday so he could rewrite the
report to the satisfaction of his supervisor.
Case Study-7
Improving the Listening Skills of Managers at Procter & Gamble
Introduction-
The managers of Procter & Gamble (P&G) are highly trained professionals. They work under heavy time pressures and
tight deadlines. As a result of this, the managers were not listening effectively to customers and co-workers.
LEAD GROUP
To improve the listening skills of the employees and managers, the Research and Development (R&D) department
conducted a programme for middle managers and technical leaders. A group ‘Leaders Effect. A Difference (LEAD) was
formed to attend that programme. The objective of the LEAD group was to increase innovation and build lasting
relationships to increase long-term networking.
The participants of the LEAD group could obtain the following benefits:
• Recognize the complexities of work issues.
• Accept the senior management expectation.
• Recognize the importance of helping others to solve their work issues.
The program for a LEAD groups begins with a 45 minute introduction to LEAD process and is followed by building
in-depth listening skills. Listening is the main point of coaching: hence it plays a critical role in developing coaching.
The lead group was structured into groups of six persons. Participants were asked to play the role of helper and
observer. Each member of group was assigned the role of seeker for one of the six LEAD sessions.
The seeker was assigned the role of practicing the skills of helping others on work issues. The helper was assigned
the role of practicing listening and training skills with the aim of assisting the seeker to think, feel, and plan.
Discussion Questions:
1. Give the reason which made the managers ineffective listeners?
2. What are the benefits of LEAD group program to the participants?
Case Study-8
FOCs Written Communication Programme
The foreign and Commonwealth Office (FCO) initiated a programme, Professional Skills for Government (PSG) to develop
professional skills for its civil service employees and foster long term goals of improvement by imparting skill in the
employees to carry out their work effectively.
Objectives of the Programme
FCO identified effective written communication as the most important skill that all employees had to master depending on
their grade and responsibilities. The main objectives of the communication skill enhancement programme were to:
• Review and adopt key principals of effective writing.
• Add Value to written communication skills of each employee.
• Minimise the time spent on redrafting documents.
Challenges
Solutions
To meet the objectives and overcome the challenges the following strategies were adopted in the training programmes:
• Two programmes ‘Effective Writing’ and ‘Writing with Impact’ were planned and carried out. These programmes
were developed considering employees at different levels.
• In order to develop specific skills, two follow-up individual coaching sessions are offered to each employee. The
employees work closely with the trainer and they use authentic business documents to ensure that the required skill
are targeted appropriately during the training.
Result
The employees showed great interest and regularly attended the programme. Employees’ confidence and accuracy in
written communication increased. This has decreased the repeated redrafting of documents and improved efficiency.
Discussion Questions:
1. What are the written communication programme objectives of FCO?
2. How did FCO’s written communication programme overcome the challenges to meet the objectives?