Rig Move Operational Process Flowchart New A4
Rig Move Operational Process Flowchart New A4
u u
'
• Safety representatives I
Demobilized • Review of performance rendered in
• Certificates I Inspection • Designatedload list the rig move with all concerned
• LicensesI H2S cards Pre-Move Meeting initiated with close personnel
Supervision and assistance • Implementationof actions points to
Road Survey Meeting Includes the following: by Field Supervisor / Truck
• Load of Rig Debriefingmeeting be taken from learned lessons to
Committee: Expected date of release of Pusher I QHSE Officer.
Equipment by at Head Office improve performance of Rig Move
• Truck Pusher Rig • Critical Loads loaded by -
• Sequence in Load operations.
• Well Site Locationof old and new site
Road survey
Crane in Single I tandem
List • Additional training I Instructions or
Engineer Pre-Move Inspection Lift Supervised by Certified supplementary process and
• Distance of move
.,
RigTool Check of all Rigger 1 with Liftingplan
• procedures for work flow.
•
Pusher Required manpower Equipment and provided and approved by Quality and HSE Performance.
• Aramco Client Load list Requirements Aramco Client I Tool Pusher Move to New Site
I
I .,
End End End
PAGE 1 OF 1
I
.
I 4