100% found this document useful (1 vote)
1K views

Cold Room Calculator

Calculation tool. in excel tables form. Created to easily calculate and determine the size of cooling units (compressors) in BTU and KW for Cold Rooms.

Uploaded by

Samer Chahrouk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views

Cold Room Calculator

Calculation tool. in excel tables form. Created to easily calculate and determine the size of cooling units (compressors) in BTU and KW for Cold Rooms.

Uploaded by

Samer Chahrouk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Transmission Load Q= U*A*( Temp out - Temp in )*24/1000 Lighting Load Q=La

U = Value of insulation w/m2K 0.25 Lamps = qtty of lamps


2
A= Total area of walls, ground and roof m 222 Time = Length of work time
Temp out = Ambient tempert. Outside the room ˚C 50 Wattage = Power of lamps
Temp in = Temperature inside the room ˚C 12 Q = Lighting Load
Q = Transmission load Kwh/day 50.616

Product Exchange Q=m*cp*(Temp out - Temp in)/3600 Fan Motors Load Q


m = Mass of Product Kg 600 Fans = Qtty of fans
CP = Specific heat energy Kj/Kg 3.7 Time = Length of work time
Temp out = Temp. of product entering ˚C 15 Wattage = Power of motor's fan
Temp in = Temp in the Room ˚C 12 Q = Fan motors Load
Q = Product Exchange load Kw 1.85
Electrical Defrost Loa
Power = Rating of heating element
Product resp Q=m*resp/3600 Time = Defrost run Time
m = mass of new product per day kg 0 Cycles = Qtty of run cycle per day
resp = Respiration of heat KJ/Kg 0 Effi = Percentage of heat dissip in th
Q = Internal Load Kwh 0 Q = Electrical Defrost Load
Lighting Load Q=Lamps*Time*Wattage/1000 Air Infiltration load Q =Cycle*vol*energy*(Temp out-Tem
tty of lamps lamp 4 Cycle = Air change cycles per day
ngth of work time Hr/day 3 Volume = Volume of cold room
= Power of lamps W 200 Energy = Energy per cubic meter
ng Load Kwh/day 2.4 Temp out = Air temperature outside
Temp in = Air temperature Inside
Q = Air infiltration Load

Fan Motors Load Q=Fans*Time*wattage/1000 Internal People Load Q=People*time*heat /10


tty of fans Fan 2 People = Qtty of people per day
ngth of work time Hr/day 20 Time = Length of work time
= Power of motor's fan W 200 Heat = heat dissipated per person
motors Load Kwh/day 8 Q = Internal Load

Electrical Defrost Load Q=Power*Time*cycle*effi


Rating of heating element Kw 1 Cold Room Cooling Load/day
frost run Time Hr 0.3 75.856 KW/day
Qtty of run cycle per day Cycle 3
entage of heat dissip in the room % 0.3
ical Defrost Load Kwh/day 0.27 Required Cooling Compressor
5.6892
ycle*vol*energy*(Temp out-Temp in)/3600
ay cyc/day 3
3
m 180
3
r Kj/˚C/m 2
tside ˚C 50
de ˚C 12
Kw 11.4

Load Q=People*time*heat /1000


y pers 2
Hr 3
on W 220
Kwh/day 1.32

Running Hours Safety Factor


16 1.2

red Cooling Compressor Kw hp


5.6892 7.6292172